基于桥梁信息模型的桥梁维修系统开发

IF 1 Q4 ENGINEERING, CIVIL
Dana Samadi, H. Taghaddos, M. Nili, Mojtaba Noghabaei
{"title":"基于桥梁信息模型的桥梁维修系统开发","authors":"Dana Samadi, H. Taghaddos, M. Nili, Mojtaba Noghabaei","doi":"10.22059/CEIJ.2020.298837.1661","DOIUrl":null,"url":null,"abstract":"Bridges play a critical role in the transportation system network; accordingly, assuring satisfaction with the service level of these structures is vital for bridge maintenance managers. Thus, it is vital to determine the optimum bridge maintenance plan (i.e., the optimum timing and type of repair activities applied to the bridge elements) considering the budget limitations. To optimize the bridge maintenance plan, some researchers have focused on developing optimization models, including the Genetic Algorithm (GA). However, a few studies have employed Bridge Information Modeling (BrIM) to enhance bridge maintenance management. This study focuses on developing an integrated framework based on BrIM and bridge maintenance optimization to utilize visualization capabilities of BrIM to assist maintenance managers in making decisions. The presented framework optimizes the bridge maintenance plan at the sub-element level. The BrIM automatically feeds into the developed GA optimization system. The introduced framework is successfully verified using a real-world case study.","PeriodicalId":43959,"journal":{"name":"Civil Engineering Infrastructures Journal-CEIJ","volume":null,"pages":null},"PeriodicalIF":1.0000,"publicationDate":"2021-07-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Development of a Bridge Maintenance System Using Bridge Information Modeling\",\"authors\":\"Dana Samadi, H. Taghaddos, M. Nili, Mojtaba Noghabaei\",\"doi\":\"10.22059/CEIJ.2020.298837.1661\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Bridges play a critical role in the transportation system network; accordingly, assuring satisfaction with the service level of these structures is vital for bridge maintenance managers. Thus, it is vital to determine the optimum bridge maintenance plan (i.e., the optimum timing and type of repair activities applied to the bridge elements) considering the budget limitations. To optimize the bridge maintenance plan, some researchers have focused on developing optimization models, including the Genetic Algorithm (GA). However, a few studies have employed Bridge Information Modeling (BrIM) to enhance bridge maintenance management. This study focuses on developing an integrated framework based on BrIM and bridge maintenance optimization to utilize visualization capabilities of BrIM to assist maintenance managers in making decisions. The presented framework optimizes the bridge maintenance plan at the sub-element level. The BrIM automatically feeds into the developed GA optimization system. The introduced framework is successfully verified using a real-world case study.\",\"PeriodicalId\":43959,\"journal\":{\"name\":\"Civil Engineering Infrastructures Journal-CEIJ\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.0000,\"publicationDate\":\"2021-07-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Civil Engineering Infrastructures Journal-CEIJ\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22059/CEIJ.2020.298837.1661\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Civil Engineering Infrastructures Journal-CEIJ","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22059/CEIJ.2020.298837.1661","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 2

摘要

桥梁在交通系统网络中起着至关重要的作用;因此,确保这些结构的服务水平是至关重要的桥梁维修管理者。因此,考虑到预算限制,确定最佳桥梁维修计划(即,适用于桥梁构件的最佳时间和维修活动类型)是至关重要的。为了优化桥梁维修计划,一些研究人员致力于开发优化模型,其中包括遗传算法(GA)。然而,利用桥梁信息模型(BrIM)加强桥梁养护管理的研究较少。本研究的重点是开发一个基于BrIM和桥梁维修优化的集成框架,利用BrIM的可视化能力来帮助维修管理者做出决策。提出的框架在子单元层面对桥梁养护计划进行优化。BrIM自动馈入开发的遗传优化系统。通过实际案例研究成功验证了所引入的框架。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Development of a Bridge Maintenance System Using Bridge Information Modeling
Bridges play a critical role in the transportation system network; accordingly, assuring satisfaction with the service level of these structures is vital for bridge maintenance managers. Thus, it is vital to determine the optimum bridge maintenance plan (i.e., the optimum timing and type of repair activities applied to the bridge elements) considering the budget limitations. To optimize the bridge maintenance plan, some researchers have focused on developing optimization models, including the Genetic Algorithm (GA). However, a few studies have employed Bridge Information Modeling (BrIM) to enhance bridge maintenance management. This study focuses on developing an integrated framework based on BrIM and bridge maintenance optimization to utilize visualization capabilities of BrIM to assist maintenance managers in making decisions. The presented framework optimizes the bridge maintenance plan at the sub-element level. The BrIM automatically feeds into the developed GA optimization system. The introduced framework is successfully verified using a real-world case study.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.30
自引率
60.00%
发文量
0
审稿时长
47 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信