时间驱动的作业成本扩展模型

Q2 Business, Management and Accounting
Lihui Zhao, Zihui Yang
{"title":"时间驱动的作业成本扩展模型","authors":"Lihui Zhao, Zihui Yang","doi":"10.32738/jeppm-2022-0011","DOIUrl":null,"url":null,"abstract":"The classic Cost-Volume-Profit (CVP) model cannot meet the needs of accurate decision-making under the new cost structure, and the time-driven activity-based costing can accurately and timely respond to rising overhead costs through accurate identification of time-related resource consumption. By relaxing the constraints of the CVP model, based on the time-driven activity-based costing method, this paper reclassifies and divides the cost behavior, constructs an extended CVP analysis model, and uses the operating data of Hunan Gongsheng Fengsheng Equipment Manufacturing Co., Ltd (GSFS) to conduct the empirical analysis. The results show that the extended model is reliable and effective.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Time-Driven Activity-Based Cost Expansion Model\",\"authors\":\"Lihui Zhao, Zihui Yang\",\"doi\":\"10.32738/jeppm-2022-0011\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The classic Cost-Volume-Profit (CVP) model cannot meet the needs of accurate decision-making under the new cost structure, and the time-driven activity-based costing can accurately and timely respond to rising overhead costs through accurate identification of time-related resource consumption. By relaxing the constraints of the CVP model, based on the time-driven activity-based costing method, this paper reclassifies and divides the cost behavior, constructs an extended CVP analysis model, and uses the operating data of Hunan Gongsheng Fengsheng Equipment Manufacturing Co., Ltd (GSFS) to conduct the empirical analysis. The results show that the extended model is reliable and effective.\",\"PeriodicalId\":53274,\"journal\":{\"name\":\"Journal of Engineering Project and Production Management\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering Project and Production Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.32738/jeppm-2022-0011\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Business, Management and Accounting\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Project and Production Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32738/jeppm-2022-0011","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Business, Management and Accounting","Score":null,"Total":0}
引用次数: 1

摘要

经典的成本-产量-利润(cost - volume - profit, CVP)模型不能满足新成本结构下准确决策的需要,而时间驱动的作业成本法可以通过对时间相关资源消耗的准确识别,准确及时地应对管理费用的上升。本文在放宽CVP模型约束的基础上,基于时间驱动的作业成本法,对成本行为进行重新分类和划分,构建扩展的CVP分析模型,并利用湖南工盛丰盛装备制造有限公司的经营数据进行实证分析。结果表明,该扩展模型是可靠和有效的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Time-Driven Activity-Based Cost Expansion Model
The classic Cost-Volume-Profit (CVP) model cannot meet the needs of accurate decision-making under the new cost structure, and the time-driven activity-based costing can accurately and timely respond to rising overhead costs through accurate identification of time-related resource consumption. By relaxing the constraints of the CVP model, based on the time-driven activity-based costing method, this paper reclassifies and divides the cost behavior, constructs an extended CVP analysis model, and uses the operating data of Hunan Gongsheng Fengsheng Equipment Manufacturing Co., Ltd (GSFS) to conduct the empirical analysis. The results show that the extended model is reliable and effective.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Engineering Project and Production Management
Journal of Engineering Project and Production Management Business, Management and Accounting-Business, Management and Accounting (miscellaneous)
CiteScore
2.30
自引率
0.00%
发文量
24
审稿时长
30 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信