{"title":"基于期望平均行程长度的参数估计的合成双采样图的性能","authors":"H. You","doi":"10.1155/2018/7583610","DOIUrl":null,"url":null,"abstract":"A synthetic double sampling (SDS) chart is commonly evaluated based on the assumption that process parameters (namely, mean and standard deviation) are known. However, the process parameters are usually unknown and must be estimated from an in-control Phase-I dataset. This will lead to deterioration in the performance of a control chart. The average run length (ARL) has been implemented as the common performance measure in process monitoring of the SDS chart. Computation of ARL requires practitioners to determine shift size in advance. However, this requirement is too restricted as practitioners may not have the experience to specify the shift size in advance. Thus, the expected average run length (EARL) is introduced to assess the performance of the SDS chart when the shift size is random. In this paper, the SDS chart, with known and estimated process parameters, was evaluated based on EARL and compared with the performance measure, ARL.","PeriodicalId":44760,"journal":{"name":"Journal of Probability and Statistics","volume":" ","pages":""},"PeriodicalIF":1.0000,"publicationDate":"2018-05-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1155/2018/7583610","citationCount":"5","resultStr":"{\"title\":\"Performance of Synthetic Double Sampling Chart with Estimated Parameters Based on Expected Average Run Length\",\"authors\":\"H. You\",\"doi\":\"10.1155/2018/7583610\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A synthetic double sampling (SDS) chart is commonly evaluated based on the assumption that process parameters (namely, mean and standard deviation) are known. However, the process parameters are usually unknown and must be estimated from an in-control Phase-I dataset. This will lead to deterioration in the performance of a control chart. The average run length (ARL) has been implemented as the common performance measure in process monitoring of the SDS chart. Computation of ARL requires practitioners to determine shift size in advance. However, this requirement is too restricted as practitioners may not have the experience to specify the shift size in advance. Thus, the expected average run length (EARL) is introduced to assess the performance of the SDS chart when the shift size is random. In this paper, the SDS chart, with known and estimated process parameters, was evaluated based on EARL and compared with the performance measure, ARL.\",\"PeriodicalId\":44760,\"journal\":{\"name\":\"Journal of Probability and Statistics\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":1.0000,\"publicationDate\":\"2018-05-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1155/2018/7583610\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Probability and Statistics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1155/2018/7583610\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"STATISTICS & PROBABILITY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Probability and Statistics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1155/2018/7583610","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"STATISTICS & PROBABILITY","Score":null,"Total":0}
Performance of Synthetic Double Sampling Chart with Estimated Parameters Based on Expected Average Run Length
A synthetic double sampling (SDS) chart is commonly evaluated based on the assumption that process parameters (namely, mean and standard deviation) are known. However, the process parameters are usually unknown and must be estimated from an in-control Phase-I dataset. This will lead to deterioration in the performance of a control chart. The average run length (ARL) has been implemented as the common performance measure in process monitoring of the SDS chart. Computation of ARL requires practitioners to determine shift size in advance. However, this requirement is too restricted as practitioners may not have the experience to specify the shift size in advance. Thus, the expected average run length (EARL) is introduced to assess the performance of the SDS chart when the shift size is random. In this paper, the SDS chart, with known and estimated process parameters, was evaluated based on EARL and compared with the performance measure, ARL.