分析安汶市红白大桥项目的生命周期成本,其价值正值方法

Hans Dermawan, Christy Vianty Patty
{"title":"分析安汶市红白大桥项目的生命周期成本,其价值正值方法","authors":"Hans Dermawan, Christy Vianty Patty","doi":"10.29103/tj.v12i2.769","DOIUrl":null,"url":null,"abstract":"The rapid development of infrastructure is the main thing for the government in Ambon City to increase the community's economic growth. One of the infrastructures that are a priority for the local government is the Merah Putih Bridge in Ambon, which was built in 2011. This study aims to identify cost components, such as initial costs, operating costs, and maintenance costs from 2017 to 2020, and evaluate bridge maintenance costs for the next 100 years. The life cycle cost method with an equivalence value approach as a research method. The results of this study for the total life cycle cost of the Merah Putih Bridge are initial costs of Rp731,578,760,000 (96.26%), operational costs of Rp2,338,600,000 (0.31%) and maintenance costs of Rp27,138,274,698 (3.43%), so that the total life cycle costs of Rp761,055,634,698 were obtained. The structural maintenance cost component is the highest cost component that needs to be considered so that the financing for the maintenance of the Merah Putih Bridge in Ambon city can be maintained.","PeriodicalId":52898,"journal":{"name":"Teras Jurnal Jurnal Teknik Sipil","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-09-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"ANALISIS LIFE CYCLE COST PADA PROYEK JEMBATAN MERAH PUTIH DI KOTA AMBON DENGAN PENDEKATAN NILAI EKUIVALENSI\",\"authors\":\"Hans Dermawan, Christy Vianty Patty\",\"doi\":\"10.29103/tj.v12i2.769\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The rapid development of infrastructure is the main thing for the government in Ambon City to increase the community's economic growth. One of the infrastructures that are a priority for the local government is the Merah Putih Bridge in Ambon, which was built in 2011. This study aims to identify cost components, such as initial costs, operating costs, and maintenance costs from 2017 to 2020, and evaluate bridge maintenance costs for the next 100 years. The life cycle cost method with an equivalence value approach as a research method. The results of this study for the total life cycle cost of the Merah Putih Bridge are initial costs of Rp731,578,760,000 (96.26%), operational costs of Rp2,338,600,000 (0.31%) and maintenance costs of Rp27,138,274,698 (3.43%), so that the total life cycle costs of Rp761,055,634,698 were obtained. The structural maintenance cost component is the highest cost component that needs to be considered so that the financing for the maintenance of the Merah Putih Bridge in Ambon city can be maintained.\",\"PeriodicalId\":52898,\"journal\":{\"name\":\"Teras Jurnal Jurnal Teknik Sipil\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-09-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Teras Jurnal Jurnal Teknik Sipil\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.29103/tj.v12i2.769\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Teras Jurnal Jurnal Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29103/tj.v12i2.769","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

基础设施的快速发展是安汶市政府提高社区经济增长的主要内容。安汶的Merah Putih桥是当地政府优先考虑的基础设施之一,该桥建于2011年。本研究旨在确定2017年至2020年的初始成本、运营成本和维护成本等成本组成部分,并评估未来100年的桥梁维护成本。生命周期成本法以等值法为研究方法。本研究对Merah Putih大桥全寿命周期成本的计算结果为初始成本为rp731,578,76万(96.26%),运营成本为Rp2,338,600,000(0.31%),维护成本为Rp27,138,274,698(3.43%),从而得到Rp761,055,634,698的全寿命周期总成本。结构维护成本部分是需要考虑的最高成本部分,以便维持安汶市Merah Putih桥的维护资金。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ANALISIS LIFE CYCLE COST PADA PROYEK JEMBATAN MERAH PUTIH DI KOTA AMBON DENGAN PENDEKATAN NILAI EKUIVALENSI
The rapid development of infrastructure is the main thing for the government in Ambon City to increase the community's economic growth. One of the infrastructures that are a priority for the local government is the Merah Putih Bridge in Ambon, which was built in 2011. This study aims to identify cost components, such as initial costs, operating costs, and maintenance costs from 2017 to 2020, and evaluate bridge maintenance costs for the next 100 years. The life cycle cost method with an equivalence value approach as a research method. The results of this study for the total life cycle cost of the Merah Putih Bridge are initial costs of Rp731,578,760,000 (96.26%), operational costs of Rp2,338,600,000 (0.31%) and maintenance costs of Rp27,138,274,698 (3.43%), so that the total life cycle costs of Rp761,055,634,698 were obtained. The structural maintenance cost component is the highest cost component that needs to be considered so that the financing for the maintenance of the Merah Putih Bridge in Ambon city can be maintained.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
52
审稿时长
6 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信