{"title":"南非交通部支持的中小企业项目沟通计划的有效性","authors":"S. Ngcobo, Witness Roya","doi":"10.24818/beman/2023.13.2-05","DOIUrl":null,"url":null,"abstract":"The South African Government, through the Department of Transport (DoT), offers financial support to various engineering companies to use in their road construction projects to improve the country’s road infrastructure. However, many road projects allocated to Small and Medium Enterprises (SMEs) are not completed on schedule. Communication plan was used as a lens to track essential elements involved in ensuring project success. A probability stratified random sampling method was used to select 34 respondents from the DOT who completed questionnaires as part of this quantitative study. Employees of the DoT’s Finance department in KwaZulu-Natal province were chosen because they were well placed to highlight the communication plan followed and challenges experienced in handling financial contracts and monitoring of such between themselves and the SMEs. On the one hand, the respondents generally claimed to have sound measures to monitor the progress of funded projects and apply appropriate techniques to cope with awarded contracts. On the other hand, they conceded that poor planning and poor communication management were the main challenges facing the department. The study calls for regular, open communication to enhance the success of projects which should be monitored in every phase following clear performance indicators. If problems are identified, a communication strategy to resolve them should be established; this strategy should be evaluated against its objectives.","PeriodicalId":30801,"journal":{"name":"Business Excellence and Management","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-06-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"EFFECTIVENESS OF COMMUNICATION PLAN IN SMALL TO MEDIUM ENTERPRISES’ PROJECTS SUPPORTED BY THE DEPARTMENT OF TRANSPORT IN SOUTH AFRICA\",\"authors\":\"S. Ngcobo, Witness Roya\",\"doi\":\"10.24818/beman/2023.13.2-05\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The South African Government, through the Department of Transport (DoT), offers financial support to various engineering companies to use in their road construction projects to improve the country’s road infrastructure. However, many road projects allocated to Small and Medium Enterprises (SMEs) are not completed on schedule. Communication plan was used as a lens to track essential elements involved in ensuring project success. A probability stratified random sampling method was used to select 34 respondents from the DOT who completed questionnaires as part of this quantitative study. Employees of the DoT’s Finance department in KwaZulu-Natal province were chosen because they were well placed to highlight the communication plan followed and challenges experienced in handling financial contracts and monitoring of such between themselves and the SMEs. On the one hand, the respondents generally claimed to have sound measures to monitor the progress of funded projects and apply appropriate techniques to cope with awarded contracts. On the other hand, they conceded that poor planning and poor communication management were the main challenges facing the department. The study calls for regular, open communication to enhance the success of projects which should be monitored in every phase following clear performance indicators. If problems are identified, a communication strategy to resolve them should be established; this strategy should be evaluated against its objectives.\",\"PeriodicalId\":30801,\"journal\":{\"name\":\"Business Excellence and Management\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-06-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Business Excellence and Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24818/beman/2023.13.2-05\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Business Excellence and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24818/beman/2023.13.2-05","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

南非政府通过运输部(DoT)向各种工程公司提供财政支持,用于其道路建设项目,以改善该国的道路基础设施。然而,许多分配给中小型企业(SMEs)的道路项目未能如期完成。沟通计划被用作跟踪确保项目成功所涉及的基本要素的镜头。采用概率分层随机抽样的方法,从交通部选取34名完成问卷调查的受访者作为定量研究的一部分。之所以选择夸祖鲁-纳塔尔省交通部财务部门的雇员,是因为他们能够很好地强调所遵循的沟通计划,以及在处理财务合同和监督他们与中小企业之间的财务合同方面所经历的挑战。一方面,回应机构普遍声称有完善的措施监察获资助项目的进度,并采用适当的技巧处理批出的合约。另一方面,他们承认,计划不周和沟通管理不善是部门面临的主要挑战。该研究呼吁进行定期、公开的沟通,以提高项目的成功率,并应按照明确的绩效指标在每个阶段进行监测。如果发现了问题,就应该制定解决问题的沟通策略;应该根据其目标来评价这一战略。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
EFFECTIVENESS OF COMMUNICATION PLAN IN SMALL TO MEDIUM ENTERPRISES’ PROJECTS SUPPORTED BY THE DEPARTMENT OF TRANSPORT IN SOUTH AFRICA
The South African Government, through the Department of Transport (DoT), offers financial support to various engineering companies to use in their road construction projects to improve the country’s road infrastructure. However, many road projects allocated to Small and Medium Enterprises (SMEs) are not completed on schedule. Communication plan was used as a lens to track essential elements involved in ensuring project success. A probability stratified random sampling method was used to select 34 respondents from the DOT who completed questionnaires as part of this quantitative study. Employees of the DoT’s Finance department in KwaZulu-Natal province were chosen because they were well placed to highlight the communication plan followed and challenges experienced in handling financial contracts and monitoring of such between themselves and the SMEs. On the one hand, the respondents generally claimed to have sound measures to monitor the progress of funded projects and apply appropriate techniques to cope with awarded contracts. On the other hand, they conceded that poor planning and poor communication management were the main challenges facing the department. The study calls for regular, open communication to enhance the success of projects which should be monitored in every phase following clear performance indicators. If problems are identified, a communication strategy to resolve them should be established; this strategy should be evaluated against its objectives.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
31
审稿时长
8 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信