{"title":"利用KINEROS 2模型预测排水沟对水文和泥沙负荷的影响:以安大略省为例","authors":"A. Gupta, R. Rudra, Bahram Gharabahi, P. Daggupati, P. Goel, Rituraj Shukla","doi":"10.7451/CBE.2018.60.1.1","DOIUrl":null,"url":null,"abstract":"Hydrologic models are calibrated and validated with an existing drainage network/drainage pattern (DNDP). However, in present times water could be routed through alternative DNDPs. The main objective of thispaper was to explore the performance of KINEROS 2 model in predicting streamflow and sediment yield in response to alterations in DNDP. Adopting the existing DNDP as an input, the model was calibrated for three events (18 April 2013, 12 June 2012, and 12 June 2013) and validated for two events (12 April 2014, and 30 August 2013) for flow at the watershed outlet. Further, the model was calibrated for eight events and validated for seven events for sediment content at the watershed outlet. Thereafter, the model was driven with a modified DNDP, and its response upon peak flow, direct runoff and sediment yield were investigated for two events (12 April 2014 and 18 April 2013) and a synthetic design storm (2-year-24 hour) at a sub-basin outlet (GUL_RSD). Three DNDPs: DNDP_M (road-side ditches with the same Manning’s n), DNDP_MV (road-side ditches lined with medium vegetation), and DNDP_HV (road-side ditches lined with thick vegetation) were considered. KINEROS 2 results revealed that peak flow, direct runoff, and sediment yield increased by 47.36 %, 31.39 %, and 26.96 % respectively for 12 April 2014 event for DNDP_M. Similar results were obtained for 18 April 2013 and synthetic design storm events. However, when road-side ditches were lined with a thicker vegetation (DNDP_MV and DNDP_HV), a reduction in peak flow, direct runoff, and sediment yield was observed. RÉSUMÉ Les modèles hydrologiques sont étalonnés et validés au moyen de configurations de drainage ou de réseaux de drainage existants (DNDP). Toutefois, à un moment donné l’eau pourrait s’écouler à travers des DNDPs différentes. L’objectif principal de cette étude était d’explorer la performance du modèle KINEROS 2 pour prédire un écoulement et un rendement de sédimentation en réponse à des changements de DNDPs. En considérant la DNDP existante comme donnée entrante, le modèle a été étalonné à l’aide de trois évènements (18 avril 2013, 12 juin 2012 et 12 juin 2013) et validé avec deux évènements (12 avril 2014 et 30 août 2013) pour évaluer l’écoulement à la sortie du bassin versant. De plus, le modèle a été étalonné à l’aide de huit évènements et validé avec sept évènements pour évaluer le contenu en sédiments à la sortie du bassin versant. Par conséquent, le modèle était attribuable à un DNDP modifié, et sa réponse après l’écoulement de pointe, le ruissellement direct et la production de sédiments ont été étudiés pour deux évènements (12 avril 2014 et 18 avril 2013) ainsi qu’avec un évènement pluvieux synthétique (2 ans – 24 h) à la sortie d’un sous-bassin (GUL_RDS). Trois DNDPs : DNDP_M (fossés de route avec le même n de Manning), DNDP_MV (fossés de route recouverts d’une végétation moyenne) et DNDP_HV (fossés de route avec une végétation dense) ont été considérées. Les résultats obtenus avec le KINEROS 2 ont révélé que l’écoulement de pointe, le ruissellement direct et la production de sédiments augmentaient de 47,36 %, 31,39 % et 26,96 % respectivement pour l’évènement du 12 avril 2014 pour le DNDP_M. Des résultats semblables ont été obtenus pour le 18 avril 2013 et les évènements pluvieux synthétiques. Toutefois, lorsque les fossés de route étaient couverts avec une végétation abondante (DNDP_MV et DNDP_HV), une réduction de l’écoulement de pointe, du ruissellement direct et de la production de sédiments était observée.","PeriodicalId":34955,"journal":{"name":"Canadian Biosystems Engineering / Le Genie des biosystems au Canada","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-08-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":"{\"title\":\"Predicting the Impact of Drainage Ditches upon Hydrology and Sediment Loads Using KINEROS 2 Model: A Case Study in Ontario.\",\"authors\":\"A. Gupta, R. Rudra, Bahram Gharabahi, P. Daggupati, P. Goel, Rituraj Shukla\",\"doi\":\"10.7451/CBE.2018.60.1.1\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Hydrologic models are calibrated and validated with an existing drainage network/drainage pattern (DNDP). However, in present times water could be routed through alternative DNDPs. The main objective of thispaper was to explore the performance of KINEROS 2 model in predicting streamflow and sediment yield in response to alterations in DNDP. Adopting the existing DNDP as an input, the model was calibrated for three events (18 April 2013, 12 June 2012, and 12 June 2013) and validated for two events (12 April 2014, and 30 August 2013) for flow at the watershed outlet. Further, the model was calibrated for eight events and validated for seven events for sediment content at the watershed outlet. Thereafter, the model was driven with a modified DNDP, and its response upon peak flow, direct runoff and sediment yield were investigated for two events (12 April 2014 and 18 April 2013) and a synthetic design storm (2-year-24 hour) at a sub-basin outlet (GUL_RSD). Three DNDPs: DNDP_M (road-side ditches with the same Manning’s n), DNDP_MV (road-side ditches lined with medium vegetation), and DNDP_HV (road-side ditches lined with thick vegetation) were considered. KINEROS 2 results revealed that peak flow, direct runoff, and sediment yield increased by 47.36 %, 31.39 %, and 26.96 % respectively for 12 April 2014 event for DNDP_M. Similar results were obtained for 18 April 2013 and synthetic design storm events. However, when road-side ditches were lined with a thicker vegetation (DNDP_MV and DNDP_HV), a reduction in peak flow, direct runoff, and sediment yield was observed. RÉSUMÉ Les modèles hydrologiques sont étalonnés et validés au moyen de configurations de drainage ou de réseaux de drainage existants (DNDP). Toutefois, à un moment donné l’eau pourrait s’écouler à travers des DNDPs différentes. L’objectif principal de cette étude était d’explorer la performance du modèle KINEROS 2 pour prédire un écoulement et un rendement de sédimentation en réponse à des changements de DNDPs. En considérant la DNDP existante comme donnée entrante, le modèle a été étalonné à l’aide de trois évènements (18 avril 2013, 12 juin 2012 et 12 juin 2013) et validé avec deux évènements (12 avril 2014 et 30 août 2013) pour évaluer l’écoulement à la sortie du bassin versant. De plus, le modèle a été étalonné à l’aide de huit évènements et validé avec sept évènements pour évaluer le contenu en sédiments à la sortie du bassin versant. Par conséquent, le modèle était attribuable à un DNDP modifié, et sa réponse après l’écoulement de pointe, le ruissellement direct et la production de sédiments ont été étudiés pour deux évènements (12 avril 2014 et 18 avril 2013) ainsi qu’avec un évènement pluvieux synthétique (2 ans – 24 h) à la sortie d’un sous-bassin (GUL_RDS). Trois DNDPs : DNDP_M (fossés de route avec le même n de Manning), DNDP_MV (fossés de route recouverts d’une végétation moyenne) et DNDP_HV (fossés de route avec une végétation dense) ont été considérées. Les résultats obtenus avec le KINEROS 2 ont révélé que l’écoulement de pointe, le ruissellement direct et la production de sédiments augmentaient de 47,36 %, 31,39 % et 26,96 % respectivement pour l’évènement du 12 avril 2014 pour le DNDP_M. Des résultats semblables ont été obtenus pour le 18 avril 2013 et les évènements pluvieux synthétiques. Toutefois, lorsque les fossés de route étaient couverts avec une végétation abondante (DNDP_MV et DNDP_HV), une réduction de l’écoulement de pointe, du ruissellement direct et de la production de sédiments était observée.\",\"PeriodicalId\":34955,\"journal\":{\"name\":\"Canadian Biosystems Engineering / Le Genie des biosystems au Canada\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-08-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"9\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Canadian Biosystems Engineering / Le Genie des biosystems au Canada\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.7451/CBE.2018.60.1.1\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Canadian Biosystems Engineering / Le Genie des biosystems au Canada","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7451/CBE.2018.60.1.1","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 9

摘要

水文模型使用现有的排水网络/排水模式(DNDP)进行校准和验证。然而,在目前,水可以通过其他的DNDPs输送。本文的主要目的是探讨KINEROS 2模型在预测径流和产沙量随DNDP变化的性能。采用现有的DNDP作为输入,该模型针对三个事件(2013年4月18日、2012年6月12日和2013年6月12日)进行了校准,并针对两个事件(2014年4月12日和2013年8月30日)对流域出口的流量进行了验证。此外,该模型针对8个事件进行了校准,并针对流域出口沉积物含量的7个事件进行了验证。在此基础上,采用改进的DNDP驱动模型,研究了2014年4月12日和2013年4月18日两个事件(GUL_RSD)和一个综合设计风暴(2- 24小时)对流域出口(GUL_RSD)峰值流量、直接径流量和产沙量的响应。考虑3种DNDPs: DNDP_M(曼宁值相同的路边沟)、DNDP_MV(路边沟内衬中等植被)和DNDP_HV(路边沟内衬厚植被)。KINEROS 2结果显示,2014年4月12日DNDP_M的峰值流量、直接径流量和产沙量分别增加了47.36%、31.39%和26.96%。2013年4月18日和综合设计风暴事件也得到了类似的结果。然而,当路边沟渠内衬较厚的植被(DNDP_MV和DNDP_HV)时,峰值流量、直接径流量和产沙量均有所减少。RÉSUMÉ Les modules hydrologiques sont samtalonsams et validsams au moyen de configurations de drainage ou de remesaux de drainage exists (DNDP)。Toutefois说,“我不知道你现在在做什么。”L主要目的是德这个练习曲是d 'explorer模型性能的KINEROS 2倒predire联合国重力滑动等联合国rendement de沉积在响应des de DNDPs变化。En considerant la DNDP existante像元entrante,模型的疾病etalonne l 'aide de三evenements(18艾薇儿2013,12 juin 2012等12 juin 2013)等valide用两个evenements来向(2014年四月12日等30 2013)倒安勤科技l 'ecoulement la出击杜港池山坡。另外,你可以用“mod”来表示,你可以用“mod”来表示,你可以用“mod”来表示,你可以用“mod”来表示,你可以用“mod”来表示,你可以用“sortie du bassin versant”来表示。相同的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的(2014年4月12日和2013年4月18日),可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的,可变的三个dndp: DNDP_M (fosssamas de route avec - même n de Manning), DNDP_MV (fosssamas de route revers - de 'une vacimationmoyenne)和DNDP_HV (fosssamas de route avec - une vacimationdense)和DNDP_HV (fosssamas de route avec - une vacimationdense)。结果obtenus用KINEROS 2位于安大略省revele l 'ecoulement德黑,le ruissellement直接et de沉积物augmentaient de la生产47岁的36%,31日39%等26日96% respectivement倒l 'evenement du 2014 pour le DNDP_M艾薇儿。2013年4月18日,他将自己的前程和其他的前程结合起来,将自己的前程和其他的前程结合起来。同样,也有其他的形式,例如,将所有的samsamas de route (DNDP_MV和DNDP_HV),将所有的samsamas de pointe (DNDP_MV和DNDP_HV),将所有的samsamas de pointe (DNDP_MV和DNDP_HV),将所有的samsamas de pointe (DNDP_MV和DNDP_HV),将所有的samsamas de pointe (ddrisselement direct),将所有的samsamas de observte (ssamas)转换为所有的samsamas。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Predicting the Impact of Drainage Ditches upon Hydrology and Sediment Loads Using KINEROS 2 Model: A Case Study in Ontario.
Hydrologic models are calibrated and validated with an existing drainage network/drainage pattern (DNDP). However, in present times water could be routed through alternative DNDPs. The main objective of thispaper was to explore the performance of KINEROS 2 model in predicting streamflow and sediment yield in response to alterations in DNDP. Adopting the existing DNDP as an input, the model was calibrated for three events (18 April 2013, 12 June 2012, and 12 June 2013) and validated for two events (12 April 2014, and 30 August 2013) for flow at the watershed outlet. Further, the model was calibrated for eight events and validated for seven events for sediment content at the watershed outlet. Thereafter, the model was driven with a modified DNDP, and its response upon peak flow, direct runoff and sediment yield were investigated for two events (12 April 2014 and 18 April 2013) and a synthetic design storm (2-year-24 hour) at a sub-basin outlet (GUL_RSD). Three DNDPs: DNDP_M (road-side ditches with the same Manning’s n), DNDP_MV (road-side ditches lined with medium vegetation), and DNDP_HV (road-side ditches lined with thick vegetation) were considered. KINEROS 2 results revealed that peak flow, direct runoff, and sediment yield increased by 47.36 %, 31.39 %, and 26.96 % respectively for 12 April 2014 event for DNDP_M. Similar results were obtained for 18 April 2013 and synthetic design storm events. However, when road-side ditches were lined with a thicker vegetation (DNDP_MV and DNDP_HV), a reduction in peak flow, direct runoff, and sediment yield was observed. RÉSUMÉ Les modèles hydrologiques sont étalonnés et validés au moyen de configurations de drainage ou de réseaux de drainage existants (DNDP). Toutefois, à un moment donné l’eau pourrait s’écouler à travers des DNDPs différentes. L’objectif principal de cette étude était d’explorer la performance du modèle KINEROS 2 pour prédire un écoulement et un rendement de sédimentation en réponse à des changements de DNDPs. En considérant la DNDP existante comme donnée entrante, le modèle a été étalonné à l’aide de trois évènements (18 avril 2013, 12 juin 2012 et 12 juin 2013) et validé avec deux évènements (12 avril 2014 et 30 août 2013) pour évaluer l’écoulement à la sortie du bassin versant. De plus, le modèle a été étalonné à l’aide de huit évènements et validé avec sept évènements pour évaluer le contenu en sédiments à la sortie du bassin versant. Par conséquent, le modèle était attribuable à un DNDP modifié, et sa réponse après l’écoulement de pointe, le ruissellement direct et la production de sédiments ont été étudiés pour deux évènements (12 avril 2014 et 18 avril 2013) ainsi qu’avec un évènement pluvieux synthétique (2 ans – 24 h) à la sortie d’un sous-bassin (GUL_RDS). Trois DNDPs : DNDP_M (fossés de route avec le même n de Manning), DNDP_MV (fossés de route recouverts d’une végétation moyenne) et DNDP_HV (fossés de route avec une végétation dense) ont été considérées. Les résultats obtenus avec le KINEROS 2 ont révélé que l’écoulement de pointe, le ruissellement direct et la production de sédiments augmentaient de 47,36 %, 31,39 % et 26,96 % respectivement pour l’évènement du 12 avril 2014 pour le DNDP_M. Des résultats semblables ont été obtenus pour le 18 avril 2013 et les évènements pluvieux synthétiques. Toutefois, lorsque les fossés de route étaient couverts avec une végétation abondante (DNDP_MV et DNDP_HV), une réduction de l’écoulement de pointe, du ruissellement direct et de la production de sédiments était observée.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
0.30
自引率
0.00%
发文量
12
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信