马来西亚建筑工地不良质量行为调查

IF 1.6 Q3 MANAGEMENT
A. Olanrewaju, Alice Hui Jing Lee
{"title":"马来西亚建筑工地不良质量行为调查","authors":"A. Olanrewaju, Alice Hui Jing Lee","doi":"10.2478/otmcj-2022-0008","DOIUrl":null,"url":null,"abstract":"Abstract Poor quality occurs in >80% of building projects. They can increase the cost of a building by up to 50% and can delay a project by up to 50%. This research investigated the determinants of poor quality on building on-sites. The research developed a questionnaire instrument that included 20 determinants of poor-quality buildings on construction sites based on literature and site visits. The survey forms were administered to construction sites operatives through hand delivery. A total of 80% of the respondents measured that the poor quality of buildings was caused by the 20 determinants. Poor workmanship, non-compliance with requirements/standards, inadequate site management, failure to achieve high-quality standards, and poor-quality materials/components were the major determinants of the poor quality of buildings during construction. This research provides fresh information on the causes and impact of poor quality on the performance of the building sector.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"14 1","pages":"2583 - 2600"},"PeriodicalIF":1.6000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Investigation of the poor-quality practices on building construction sites in Malaysia\",\"authors\":\"A. Olanrewaju, Alice Hui Jing Lee\",\"doi\":\"10.2478/otmcj-2022-0008\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Poor quality occurs in >80% of building projects. They can increase the cost of a building by up to 50% and can delay a project by up to 50%. This research investigated the determinants of poor quality on building on-sites. The research developed a questionnaire instrument that included 20 determinants of poor-quality buildings on construction sites based on literature and site visits. The survey forms were administered to construction sites operatives through hand delivery. A total of 80% of the respondents measured that the poor quality of buildings was caused by the 20 determinants. Poor workmanship, non-compliance with requirements/standards, inadequate site management, failure to achieve high-quality standards, and poor-quality materials/components were the major determinants of the poor quality of buildings during construction. This research provides fresh information on the causes and impact of poor quality on the performance of the building sector.\",\"PeriodicalId\":42309,\"journal\":{\"name\":\"Organization Technology and Management in Construction\",\"volume\":\"14 1\",\"pages\":\"2583 - 2600\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2022-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Organization Technology and Management in Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/otmcj-2022-0008\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Organization Technology and Management in Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/otmcj-2022-0008","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 3

摘要

摘要80%以上的建筑工程质量较差。它们可以使建筑成本增加50%,也可以使项目延迟50%。这项研究调查了现场建筑质量差的决定因素。该研究开发了一个问卷工具,根据文献和实地考察,其中包括建筑工地上劣质建筑的20个决定因素。调查表格是透过专人递送的方式交予建筑地盘人员。共有80%的受访者认为,建筑质量差是由20个决定因素造成的。工艺差、不符合要求/标准、现场管理不足、未能达到高质量标准以及材料/部件质量差是建筑施工期间质量差的主要决定因素。这项研究提供了关于建筑行业质量差的原因和影响的新信息。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Investigation of the poor-quality practices on building construction sites in Malaysia
Abstract Poor quality occurs in >80% of building projects. They can increase the cost of a building by up to 50% and can delay a project by up to 50%. This research investigated the determinants of poor quality on building on-sites. The research developed a questionnaire instrument that included 20 determinants of poor-quality buildings on construction sites based on literature and site visits. The survey forms were administered to construction sites operatives through hand delivery. A total of 80% of the respondents measured that the poor quality of buildings was caused by the 20 determinants. Poor workmanship, non-compliance with requirements/standards, inadequate site management, failure to achieve high-quality standards, and poor-quality materials/components were the major determinants of the poor quality of buildings during construction. This research provides fresh information on the causes and impact of poor quality on the performance of the building sector.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.10
自引率
0.00%
发文量
8
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信