影响巴基斯坦建设项目成本超支因素的结构模型

IF 0.6 Q3 ENGINEERING, MULTIDISCIPLINARY
A. Memon, Abdul Qadir Memon, M. A. Soomro, Muneeb Ayub Memon, Jam Shahzaib Khan Sahito
{"title":"影响巴基斯坦建设项目成本超支因素的结构模型","authors":"A. Memon, Abdul Qadir Memon, M. A. Soomro, Muneeb Ayub Memon, Jam Shahzaib Khan Sahito","doi":"10.22581/muet1982.2302.12","DOIUrl":null,"url":null,"abstract":"Cost overruns are a global challenge to successfully completing construction projects. Cost overrun has a substantial impact resulting in most construction projects failing to be completed. Several factors have contributed significantly to the industry's decline. The factors were discovered in the literature, assessed, and applied to the construction industry in Pakistan. This study scrutinized and identified the relationships between the factors causing cost overruns in the Pakistani construction industry using the Partial Least Squares Structural Equation Modelling (PLS-SEM) approach. The structural model was created and tested with Smart-PLS software using data from a questionnaire survey of 131 construction practitioners. Six constructs were used to categorise the factors. The model identifies 21 critical factors in Pakistani construction projects, with resource management ranking first. Contract management issues can also contribute significantly to project cost overruns. Model assessment results indicate that the developed model has a substantial power of explaining the factors of cost performance while R2 value showed that 45.7% variance is explained by the model. The model developed model will serve as a jumping-off point for academics, researchers, and practitioners in developing a cost-control system. It is suggested that establishing an efficient and effective contract management protocol among stakeholders throughout the design and supervision stages is extremely beneficial for improving project cost performance and significantly reducing time overruns.","PeriodicalId":44836,"journal":{"name":"Mehran University Research Journal of Engineering and Technology","volume":" ","pages":""},"PeriodicalIF":0.6000,"publicationDate":"2023-04-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Structural model of cost overrun factors affecting Pakistani construction projects\",\"authors\":\"A. Memon, Abdul Qadir Memon, M. A. Soomro, Muneeb Ayub Memon, Jam Shahzaib Khan Sahito\",\"doi\":\"10.22581/muet1982.2302.12\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Cost overruns are a global challenge to successfully completing construction projects. Cost overrun has a substantial impact resulting in most construction projects failing to be completed. Several factors have contributed significantly to the industry's decline. The factors were discovered in the literature, assessed, and applied to the construction industry in Pakistan. This study scrutinized and identified the relationships between the factors causing cost overruns in the Pakistani construction industry using the Partial Least Squares Structural Equation Modelling (PLS-SEM) approach. The structural model was created and tested with Smart-PLS software using data from a questionnaire survey of 131 construction practitioners. Six constructs were used to categorise the factors. The model identifies 21 critical factors in Pakistani construction projects, with resource management ranking first. Contract management issues can also contribute significantly to project cost overruns. Model assessment results indicate that the developed model has a substantial power of explaining the factors of cost performance while R2 value showed that 45.7% variance is explained by the model. The model developed model will serve as a jumping-off point for academics, researchers, and practitioners in developing a cost-control system. It is suggested that establishing an efficient and effective contract management protocol among stakeholders throughout the design and supervision stages is extremely beneficial for improving project cost performance and significantly reducing time overruns.\",\"PeriodicalId\":44836,\"journal\":{\"name\":\"Mehran University Research Journal of Engineering and Technology\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.6000,\"publicationDate\":\"2023-04-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Mehran University Research Journal of Engineering and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22581/muet1982.2302.12\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mehran University Research Journal of Engineering and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22581/muet1982.2302.12","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

摘要

成本超支是成功完成建筑项目的全球性挑战。成本超支产生了重大影响,导致大多数建筑项目无法完工。几个因素对该行业的衰落起到了重要作用。这些因素是在文献中发现的,经过评估并应用于巴基斯坦的建筑业。本研究使用偏最小二乘结构方程建模(PLS-SEM)方法仔细研究并确定了巴基斯坦建筑业成本超支因素之间的关系。该结构模型是使用Smart PLS软件创建和测试的,该软件使用了131名建筑从业者的问卷调查数据。使用六种结构对因素进行分类。该模型确定了巴基斯坦建筑项目中的21个关键因素,其中资源管理排名第一。合同管理问题也可能导致项目成本超支。模型评估结果表明,所开发的模型对成本效益的因素有很大的解释力,而R2值表明,该模型解释了45.7%的方差。模型开发的模型将作为学者、研究人员和从业者开发成本控制系统的起点。建议在整个设计和监理阶段在利益相关者之间建立一个高效、有效的合同管理协议,这对于提高项目成本效益和显著减少时间超支是非常有益的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Structural model of cost overrun factors affecting Pakistani construction projects
Cost overruns are a global challenge to successfully completing construction projects. Cost overrun has a substantial impact resulting in most construction projects failing to be completed. Several factors have contributed significantly to the industry's decline. The factors were discovered in the literature, assessed, and applied to the construction industry in Pakistan. This study scrutinized and identified the relationships between the factors causing cost overruns in the Pakistani construction industry using the Partial Least Squares Structural Equation Modelling (PLS-SEM) approach. The structural model was created and tested with Smart-PLS software using data from a questionnaire survey of 131 construction practitioners. Six constructs were used to categorise the factors. The model identifies 21 critical factors in Pakistani construction projects, with resource management ranking first. Contract management issues can also contribute significantly to project cost overruns. Model assessment results indicate that the developed model has a substantial power of explaining the factors of cost performance while R2 value showed that 45.7% variance is explained by the model. The model developed model will serve as a jumping-off point for academics, researchers, and practitioners in developing a cost-control system. It is suggested that establishing an efficient and effective contract management protocol among stakeholders throughout the design and supervision stages is extremely beneficial for improving project cost performance and significantly reducing time overruns.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
76
审稿时长
40 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信