{"title":"基于critical - topsis方法的建设项目利益相关者评估","authors":"S. Gaur, Satyanarayana Dosapati, A. Tawalare","doi":"10.1108/bepam-10-2021-0122","DOIUrl":null,"url":null,"abstract":"PurposeStakeholder assessment is based on attributes possessed by stakeholders, making the process heavily reliant on evaluating attribute weights. The present assessment methods are based on Analytical Hierarchy Process, Analytical Network Process, and pairwise comparisons that heavily rely on decision-makers’ skills and knowledge. An objective evaluation of attribute weight needs to be done to overcome this challenge.Design/methodology/approachA Multi Criteria Decision Making (MCDM) based approach, through the combined use of Criteria Importance Through Intercriteria Correlation (CRITIC) and Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) methods has been incorporated to objectively evaluate the weights of the stakeholder attributes and their ranking with a specific focus on construction megaprojects. Five stakeholder attributes and twelve commonly associated stakeholders with megaprojects were considered to achieve this.FindingsThe new model presented power, durability and legitimacy as three important stakeholder attributes, further used to determine stakeholder importance. The client, contractor and project manager were identified as the top three internal stakeholders, and customers, local community and utility service providers as three crucial external stakeholders.Research limitations/implicationsThe findings from the proposed method provide the practitioners with updated information about the attributes they need to look into when planning stakeholder involvement and management. Further, it also leads them to the established framework for the provided stakeholder ranking when planning their management strategies.Originality/valueThe use of CRITIC method allowed to address the possibility of any correlation between the attributes in their weight determination. This was one of the advantages as co-relation between the attributes during their weight determination has not been addressed in previous methods.","PeriodicalId":46426,"journal":{"name":"Built Environment Project and Asset Management","volume":" ","pages":""},"PeriodicalIF":1.9000,"publicationDate":"2022-08-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Stakeholder assessment in construction projects using a CRITIC-TOPSIS approach\",\"authors\":\"S. Gaur, Satyanarayana Dosapati, A. Tawalare\",\"doi\":\"10.1108/bepam-10-2021-0122\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PurposeStakeholder assessment is based on attributes possessed by stakeholders, making the process heavily reliant on evaluating attribute weights. The present assessment methods are based on Analytical Hierarchy Process, Analytical Network Process, and pairwise comparisons that heavily rely on decision-makers’ skills and knowledge. An objective evaluation of attribute weight needs to be done to overcome this challenge.Design/methodology/approachA Multi Criteria Decision Making (MCDM) based approach, through the combined use of Criteria Importance Through Intercriteria Correlation (CRITIC) and Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) methods has been incorporated to objectively evaluate the weights of the stakeholder attributes and their ranking with a specific focus on construction megaprojects. Five stakeholder attributes and twelve commonly associated stakeholders with megaprojects were considered to achieve this.FindingsThe new model presented power, durability and legitimacy as three important stakeholder attributes, further used to determine stakeholder importance. The client, contractor and project manager were identified as the top three internal stakeholders, and customers, local community and utility service providers as three crucial external stakeholders.Research limitations/implicationsThe findings from the proposed method provide the practitioners with updated information about the attributes they need to look into when planning stakeholder involvement and management. Further, it also leads them to the established framework for the provided stakeholder ranking when planning their management strategies.Originality/valueThe use of CRITIC method allowed to address the possibility of any correlation between the attributes in their weight determination. This was one of the advantages as co-relation between the attributes during their weight determination has not been addressed in previous methods.\",\"PeriodicalId\":46426,\"journal\":{\"name\":\"Built Environment Project and Asset Management\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":1.9000,\"publicationDate\":\"2022-08-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Built Environment Project and Asset Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/bepam-10-2021-0122\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Built Environment Project and Asset Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/bepam-10-2021-0122","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 6

摘要

干系人评估基于干系人所拥有的属性,使得过程严重依赖于评估属性权重。目前的评估方法主要基于分析层次法、分析网络法和两两比较,严重依赖于决策者的技能和知识。为了克服这一挑战,需要对属性权重进行客观评价。设计/方法/方法基于多标准决策(MCDM)的方法,通过结合使用标准重要性通过标准间相关性(CRITIC)和通过理想解决方案相似性排序偏好技术(TOPSIS)方法,已被纳入客观评估利益相关者属性的权重及其排名,并特别关注大型建设项目。五个利益相关者属性和十二个与大型项目相关的利益相关者被认为可以实现这一目标。新模型将权力、持久性和合法性作为利益相关者的三个重要属性,进一步用于确定利益相关者的重要性。客户、承包商和项目经理被确定为前三个内部利益相关者,客户、当地社区和公用事业服务提供商被确定为三个关键的外部利益相关者。研究的局限性/意义所提出的方法的发现为从业者提供了关于他们在规划涉众参与和管理时需要考虑的属性的最新信息。此外,它还引导他们在规划管理策略时为所提供的利益相关者排名建立框架。原创性/价值critical方法的使用允许在其权重确定中处理属性之间任何相关性的可能性。这是优点之一,因为在权重确定期间属性之间的相互关系在以前的方法中没有得到解决。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Stakeholder assessment in construction projects using a CRITIC-TOPSIS approach
PurposeStakeholder assessment is based on attributes possessed by stakeholders, making the process heavily reliant on evaluating attribute weights. The present assessment methods are based on Analytical Hierarchy Process, Analytical Network Process, and pairwise comparisons that heavily rely on decision-makers’ skills and knowledge. An objective evaluation of attribute weight needs to be done to overcome this challenge.Design/methodology/approachA Multi Criteria Decision Making (MCDM) based approach, through the combined use of Criteria Importance Through Intercriteria Correlation (CRITIC) and Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) methods has been incorporated to objectively evaluate the weights of the stakeholder attributes and their ranking with a specific focus on construction megaprojects. Five stakeholder attributes and twelve commonly associated stakeholders with megaprojects were considered to achieve this.FindingsThe new model presented power, durability and legitimacy as three important stakeholder attributes, further used to determine stakeholder importance. The client, contractor and project manager were identified as the top three internal stakeholders, and customers, local community and utility service providers as three crucial external stakeholders.Research limitations/implicationsThe findings from the proposed method provide the practitioners with updated information about the attributes they need to look into when planning stakeholder involvement and management. Further, it also leads them to the established framework for the provided stakeholder ranking when planning their management strategies.Originality/valueThe use of CRITIC method allowed to address the possibility of any correlation between the attributes in their weight determination. This was one of the advantages as co-relation between the attributes during their weight determination has not been addressed in previous methods.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
4.30
自引率
9.10%
发文量
41
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信