A. Mahmoodzadeh, H. H. Ali, H. Ibrahim, Adil, H. Mohammed, S. Rashidi, M. Majeed, Mohammed Sardar
{"title":"自回归模型在隧道施工管理中的应用","authors":"A. Mahmoodzadeh, H. H. Ali, H. Ibrahim, Adil, H. Mohammed, S. Rashidi, M. Majeed, Mohammed Sardar","doi":"10.46544/ams.v27i3.02","DOIUrl":null,"url":null,"abstract":"The unknown subsurface conditions in tunnelling projects have led to their management with many uncertainties. From these uncertainties, we can mention the geological condition of the tunnel route and the time and costs required for construction. In order to significantly reduce these uncertainties, techniques that have a high predictive power must be used. For this purpose, in this study, an autoregressive model was used to reduce the uncertainties related to geology and construction time and cost in tunnelling projects. A comparison between the predicted results and the actual values through several statistical indices showed the high-performance prediction of the autoregressive model in the prediction of tunnel resources. Also, three input parameters affecting tunnel construction time and costs, such as RQD, groundwater, and RMR, were considered. The sensitivity analysis of these parameters on the time and cost of tunnelling projects was investigated through mutual information test (MIT). The groundwater was the most effective parameter on the tunnel's time and cost.","PeriodicalId":50889,"journal":{"name":"Acta Montanistica Slovaca","volume":" ","pages":""},"PeriodicalIF":2.2000,"publicationDate":"2022-12-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Application of Autoregressive Model in the Construction Management of Tunnels\",\"authors\":\"A. Mahmoodzadeh, H. H. Ali, H. Ibrahim, Adil, H. Mohammed, S. Rashidi, M. Majeed, Mohammed Sardar\",\"doi\":\"10.46544/ams.v27i3.02\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The unknown subsurface conditions in tunnelling projects have led to their management with many uncertainties. From these uncertainties, we can mention the geological condition of the tunnel route and the time and costs required for construction. In order to significantly reduce these uncertainties, techniques that have a high predictive power must be used. For this purpose, in this study, an autoregressive model was used to reduce the uncertainties related to geology and construction time and cost in tunnelling projects. A comparison between the predicted results and the actual values through several statistical indices showed the high-performance prediction of the autoregressive model in the prediction of tunnel resources. Also, three input parameters affecting tunnel construction time and costs, such as RQD, groundwater, and RMR, were considered. The sensitivity analysis of these parameters on the time and cost of tunnelling projects was investigated through mutual information test (MIT). The groundwater was the most effective parameter on the tunnel's time and cost.\",\"PeriodicalId\":50889,\"journal\":{\"name\":\"Acta Montanistica Slovaca\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":2.2000,\"publicationDate\":\"2022-12-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Acta Montanistica Slovaca\",\"FirstCategoryId\":\"89\",\"ListUrlMain\":\"https://doi.org/10.46544/ams.v27i3.02\",\"RegionNum\":4,\"RegionCategory\":\"地球科学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"GEOSCIENCES, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Acta Montanistica Slovaca","FirstCategoryId":"89","ListUrlMain":"https://doi.org/10.46544/ams.v27i3.02","RegionNum":4,"RegionCategory":"地球科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"GEOSCIENCES, MULTIDISCIPLINARY","Score":null,"Total":0}
Application of Autoregressive Model in the Construction Management of Tunnels
The unknown subsurface conditions in tunnelling projects have led to their management with many uncertainties. From these uncertainties, we can mention the geological condition of the tunnel route and the time and costs required for construction. In order to significantly reduce these uncertainties, techniques that have a high predictive power must be used. For this purpose, in this study, an autoregressive model was used to reduce the uncertainties related to geology and construction time and cost in tunnelling projects. A comparison between the predicted results and the actual values through several statistical indices showed the high-performance prediction of the autoregressive model in the prediction of tunnel resources. Also, three input parameters affecting tunnel construction time and costs, such as RQD, groundwater, and RMR, were considered. The sensitivity analysis of these parameters on the time and cost of tunnelling projects was investigated through mutual information test (MIT). The groundwater was the most effective parameter on the tunnel's time and cost.
期刊介绍:
Acta Montanistica Slovaca publishes high quality articles on basic and applied research in the following fields:
geology and geological survey;
mining;
Earth resources;
underground engineering and geotechnics;
mining mechanization, mining transport, deep hole drilling;
ecotechnology and mineralurgy;
process control, automation and applied informatics in raw materials extraction, utilization and processing;
other similar fields.
Acta Montanistica Slovaca is the only scientific journal of this kind in Central, Eastern and South Eastern Europe.
The submitted manuscripts should contribute significantly to the international literature, even if the focus can be regional. Manuscripts should cite the extant and relevant international literature, should clearly state what the wider contribution is (e.g. a novel discovery, application of a new technique or methodology, application of an existing methodology to a new problem), and should discuss the importance of the work in the international context.