Yurii A. Kuznetsov, D. Stadnik, Nino Stadnik, E. Shadyzheva
{"title":"为煤矿超前工作面再生产过程控制的综合作业模型提供了方法学基础","authors":"Yurii A. Kuznetsov, D. Stadnik, Nino Stadnik, E. Shadyzheva","doi":"10.21177/1998-4502-2022-14-4-685-694","DOIUrl":null,"url":null,"abstract":"This article presents the results of optimizing the reliability and reliability of the time forecast’s development reserves of the coal mine long wall areas and the preparation time of the face longwall line. A scheme of the reproduction the long wall front process in the form of a decision tree model has been developed. The dependences of the optimal probability of the absence of coal mining losses and the optimal dynamic time reserve on the reliability of longwall and preparatory work and on the ratio of damage in case of shortage, as well as the costs of maintaining the cleaning front, are established. It is shown that when forming a mining development plan, the value of the optimal dynamic time reserve should be determined for each treatment face. It is determined that when providing dynamic redundancy of the process of reproduction of the longwall front, the possibilities of performing degassing and drainage of mineral reserves being prepared for extraction are more fully realized which positively affects the level of reliability and safety of longwall operations.","PeriodicalId":37608,"journal":{"name":"Sustainable Development of Mountain Territories","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Methodological bases for synthesis operation models for control of the reproduction process of the advancing faces of coal mines\",\"authors\":\"Yurii A. Kuznetsov, D. Stadnik, Nino Stadnik, E. Shadyzheva\",\"doi\":\"10.21177/1998-4502-2022-14-4-685-694\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This article presents the results of optimizing the reliability and reliability of the time forecast’s development reserves of the coal mine long wall areas and the preparation time of the face longwall line. A scheme of the reproduction the long wall front process in the form of a decision tree model has been developed. The dependences of the optimal probability of the absence of coal mining losses and the optimal dynamic time reserve on the reliability of longwall and preparatory work and on the ratio of damage in case of shortage, as well as the costs of maintaining the cleaning front, are established. It is shown that when forming a mining development plan, the value of the optimal dynamic time reserve should be determined for each treatment face. It is determined that when providing dynamic redundancy of the process of reproduction of the longwall front, the possibilities of performing degassing and drainage of mineral reserves being prepared for extraction are more fully realized which positively affects the level of reliability and safety of longwall operations.\",\"PeriodicalId\":37608,\"journal\":{\"name\":\"Sustainable Development of Mountain Territories\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-12-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Sustainable Development of Mountain Territories\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21177/1998-4502-2022-14-4-685-694\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Social Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Sustainable Development of Mountain Territories","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21177/1998-4502-2022-14-4-685-694","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Social Sciences","Score":null,"Total":0}
Methodological bases for synthesis operation models for control of the reproduction process of the advancing faces of coal mines
This article presents the results of optimizing the reliability and reliability of the time forecast’s development reserves of the coal mine long wall areas and the preparation time of the face longwall line. A scheme of the reproduction the long wall front process in the form of a decision tree model has been developed. The dependences of the optimal probability of the absence of coal mining losses and the optimal dynamic time reserve on the reliability of longwall and preparatory work and on the ratio of damage in case of shortage, as well as the costs of maintaining the cleaning front, are established. It is shown that when forming a mining development plan, the value of the optimal dynamic time reserve should be determined for each treatment face. It is determined that when providing dynamic redundancy of the process of reproduction of the longwall front, the possibilities of performing degassing and drainage of mineral reserves being prepared for extraction are more fully realized which positively affects the level of reliability and safety of longwall operations.
期刊介绍:
International scientific journal "Sustainable development of mountain territories" covers fundamental and applied regional, national and international research and provides a platform to publish original full papers and related reviews in the following areas: engineering science and Earth science in the field of sustainable development of mountain territories. Main objectives of international scientific journal "Sustainable development of mountain territories" are: raising the level of professional scientific workers, teachers of higher educational institutions and scientific organizations; presentation of research results in the field of sustainable development of mountain areas on the technical aspects and Earth sciences, informing readers about the results of Russian and international scientific forums; improved review and editing of the articles submitted for publication; ensuring wide dissemination for the published articles in the international academic environment; encouraging dissemination and indexing of scientific works in various foreign key citation databases.