政府保障性住房建设时间超限的影响因素:以普纳都市圈马哈拉施特拉住房区发展局为例

Q4 Engineering
Prasanna Samadhan Gawale
{"title":"政府保障性住房建设时间超限的影响因素:以普纳都市圈马哈拉施特拉住房区发展局为例","authors":"Prasanna Samadhan Gawale","doi":"10.37896/jxu15.3/002","DOIUrl":null,"url":null,"abstract":"Construction industry is considered as a locomotive of the national economy; it has significant effect on the efficiency and productivity of all sectors. The ongoing urban housing development in this industry certain patterns have indicated an arrangement towards market-situated types of housing pair with globalization and the development of the Indian economy (Sengupta and Tipple, 2007). This study is aimed to identify and examine the major factors that contribute to construction time overruns, their negative effects and possible solutions to overcome such delays from Indian construction industries Accessing the different factors affecting the time overrun necessary recommendations has been provided through this report for the stated problem","PeriodicalId":35710,"journal":{"name":"西安电子科技大学学报","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Factors Affecting Time Overrun In Government Affordable Housing Construction: The Case Of Maharashtra Housing Area Development Authority (MHADA) In Pune Metropolitan Area\",\"authors\":\"Prasanna Samadhan Gawale\",\"doi\":\"10.37896/jxu15.3/002\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Construction industry is considered as a locomotive of the national economy; it has significant effect on the efficiency and productivity of all sectors. The ongoing urban housing development in this industry certain patterns have indicated an arrangement towards market-situated types of housing pair with globalization and the development of the Indian economy (Sengupta and Tipple, 2007). This study is aimed to identify and examine the major factors that contribute to construction time overruns, their negative effects and possible solutions to overcome such delays from Indian construction industries Accessing the different factors affecting the time overrun necessary recommendations has been provided through this report for the stated problem\",\"PeriodicalId\":35710,\"journal\":{\"name\":\"西安电子科技大学学报\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"西安电子科技大学学报\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.37896/jxu15.3/002\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"西安电子科技大学学报","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37896/jxu15.3/002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

摘要

建筑业被认为是国民经济的火车头;它对所有部门的效率和生产力都有重大影响。该行业正在进行的城市住房发展的某些模式表明,随着全球化和印度经济的发展,对市场定位的住房类型进行了安排(Sengupta和Tipple, 2007)。本研究旨在确定和检查导致施工时间超支的主要因素,它们的负面影响和可能的解决方案,以克服印度建筑行业的这种延误。访问影响时间超支的不同因素,本报告为所述问题提供了必要的建议
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Factors Affecting Time Overrun In Government Affordable Housing Construction: The Case Of Maharashtra Housing Area Development Authority (MHADA) In Pune Metropolitan Area
Construction industry is considered as a locomotive of the national economy; it has significant effect on the efficiency and productivity of all sectors. The ongoing urban housing development in this industry certain patterns have indicated an arrangement towards market-situated types of housing pair with globalization and the development of the Indian economy (Sengupta and Tipple, 2007). This study is aimed to identify and examine the major factors that contribute to construction time overruns, their negative effects and possible solutions to overcome such delays from Indian construction industries Accessing the different factors affecting the time overrun necessary recommendations has been provided through this report for the stated problem
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
西安电子科技大学学报
西安电子科技大学学报 Engineering-Electrical and Electronic Engineering
CiteScore
1.40
自引率
0.00%
发文量
6272
期刊介绍:
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信