{"title":"端板钢梁与部分预应力螺栓的连接","authors":"Ștefan Guțiu, C. Moga, A. Danciu","doi":"10.2478/rjti-2021-0009","DOIUrl":null,"url":null,"abstract":"Abstract The connections with end plates and bolts can be used in steel bridge structures, or joining the decking beams, which can lead to very simple and economical constructive solutions. The paper presents some theoretical aspects concerning the behavior and calculation of the end plate connections which is partially pre-tensioned by high-strength bolts, and supplementary a welded cover plate is added to the tensioned flange of the plate girder. In the case of connections subjected to tension forces, it is not recommended to prestress the bolts as much as is the case when the joints are subjected only to shear because live loads can lead to the overloading of the bolts; the overload is a function of the relative stiffness of the end plate and of the bolts. The additional welded splice at the tension flange contributes to the transfer of the large tension stresses from the extreme bolts to the welded cover plate, resulting in a significantly reduced joint assembly loading and an increased load-bearing capacity. The paper includes a numerical example highlighting the influence of the stiffness of the joint elements and of the welded splice-plate on the joint loading, considering its pre-tensioning effect from the cooling contraction of the longitudinal welding fillets.","PeriodicalId":40630,"journal":{"name":"Romanian Journal of Transport Infrastructure","volume":"10 1","pages":"1 - 16"},"PeriodicalIF":0.1000,"publicationDate":"2021-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Connections of Steel Girders with End Plates and Partially Prestressed Bolts\",\"authors\":\"Ștefan Guțiu, C. Moga, A. Danciu\",\"doi\":\"10.2478/rjti-2021-0009\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract The connections with end plates and bolts can be used in steel bridge structures, or joining the decking beams, which can lead to very simple and economical constructive solutions. The paper presents some theoretical aspects concerning the behavior and calculation of the end plate connections which is partially pre-tensioned by high-strength bolts, and supplementary a welded cover plate is added to the tensioned flange of the plate girder. In the case of connections subjected to tension forces, it is not recommended to prestress the bolts as much as is the case when the joints are subjected only to shear because live loads can lead to the overloading of the bolts; the overload is a function of the relative stiffness of the end plate and of the bolts. The additional welded splice at the tension flange contributes to the transfer of the large tension stresses from the extreme bolts to the welded cover plate, resulting in a significantly reduced joint assembly loading and an increased load-bearing capacity. The paper includes a numerical example highlighting the influence of the stiffness of the joint elements and of the welded splice-plate on the joint loading, considering its pre-tensioning effect from the cooling contraction of the longitudinal welding fillets.\",\"PeriodicalId\":40630,\"journal\":{\"name\":\"Romanian Journal of Transport Infrastructure\",\"volume\":\"10 1\",\"pages\":\"1 - 16\"},\"PeriodicalIF\":0.1000,\"publicationDate\":\"2021-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Romanian Journal of Transport Infrastructure\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/rjti-2021-0009\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Romanian Journal of Transport Infrastructure","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/rjti-2021-0009","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

摘要

端板和螺栓连接可以用于钢桥结构,也可以用于连接桥面梁,这是一种非常简单和经济的施工方案。本文介绍了采用高强度螺栓进行部分预张拉并在板梁张拉翼缘上附加焊接盖板的端板连接的性能和计算的一些理论问题。在连接受拉力的情况下,不建议对螺栓施加预应力,因为活荷载会导致螺栓过载,而当连接只受剪切作用时,则不建议对螺栓施加预应力;过载是端板和螺栓相对刚度的函数。在受拉法兰处附加的焊接接头有助于将大的拉应力从极端螺栓传递到焊接盖板,从而大大降低了接头组件的载荷,提高了承载能力。文中给出了一个数值算例,在考虑了纵向焊接角的冷却收缩所产生的预张紧效应的情况下,着重分析了接头单元刚度和焊接拼接板刚度对接头载荷的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Connections of Steel Girders with End Plates and Partially Prestressed Bolts
Abstract The connections with end plates and bolts can be used in steel bridge structures, or joining the decking beams, which can lead to very simple and economical constructive solutions. The paper presents some theoretical aspects concerning the behavior and calculation of the end plate connections which is partially pre-tensioned by high-strength bolts, and supplementary a welded cover plate is added to the tensioned flange of the plate girder. In the case of connections subjected to tension forces, it is not recommended to prestress the bolts as much as is the case when the joints are subjected only to shear because live loads can lead to the overloading of the bolts; the overload is a function of the relative stiffness of the end plate and of the bolts. The additional welded splice at the tension flange contributes to the transfer of the large tension stresses from the extreme bolts to the welded cover plate, resulting in a significantly reduced joint assembly loading and an increased load-bearing capacity. The paper includes a numerical example highlighting the influence of the stiffness of the joint elements and of the welded splice-plate on the joint loading, considering its pre-tensioning effect from the cooling contraction of the longitudinal welding fillets.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
6
审稿时长
10 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信