混合地基条件下双隧道开挖对医院建筑的变形及影响

IF 2.3 Q2 ENGINEERING, GEOLOGICAL
Aswathy M S, V. M
{"title":"混合地基条件下双隧道开挖对医院建筑的变形及影响","authors":"Aswathy M S, V. M","doi":"10.1080/19386362.2022.2117342","DOIUrl":null,"url":null,"abstract":"ABSTRACT An extensive geotechnical assessment of a hospital building under-crossed by twin tunnels is presented in this paper. The case study considered in the study is Phase III of Delhi Metro Gray line, which has been built recently using Tunnel Boring Machine. Finite element analysis was carried out to simulate the construction of two tunnels underneath the building, and the soil is simulated using an advanced constitutive model. The numerical model was validated against the field monitoring data, and the effect of tunnelling on the building deformation is also studied. Also, the comparison of building settlements with greenfield conditions is carried out. The study showed that the building influences the pattern of the settlement trough. Quantitative study of the settlement showed that there was no undue distress to the building due to the construction of twin tunnels, suggesting the safe crossing of twin tunnel below hospital building.","PeriodicalId":47238,"journal":{"name":"International Journal of Geotechnical Engineering","volume":"17 1","pages":"10 - 25"},"PeriodicalIF":2.3000,"publicationDate":"2022-09-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Twin tunnelling caused distortions and its effect on a hospital building on mixed ground conditions\",\"authors\":\"Aswathy M S, V. M\",\"doi\":\"10.1080/19386362.2022.2117342\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT An extensive geotechnical assessment of a hospital building under-crossed by twin tunnels is presented in this paper. The case study considered in the study is Phase III of Delhi Metro Gray line, which has been built recently using Tunnel Boring Machine. Finite element analysis was carried out to simulate the construction of two tunnels underneath the building, and the soil is simulated using an advanced constitutive model. The numerical model was validated against the field monitoring data, and the effect of tunnelling on the building deformation is also studied. Also, the comparison of building settlements with greenfield conditions is carried out. The study showed that the building influences the pattern of the settlement trough. Quantitative study of the settlement showed that there was no undue distress to the building due to the construction of twin tunnels, suggesting the safe crossing of twin tunnel below hospital building.\",\"PeriodicalId\":47238,\"journal\":{\"name\":\"International Journal of Geotechnical Engineering\",\"volume\":\"17 1\",\"pages\":\"10 - 25\"},\"PeriodicalIF\":2.3000,\"publicationDate\":\"2022-09-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Geotechnical Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/19386362.2022.2117342\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENGINEERING, GEOLOGICAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Geotechnical Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/19386362.2022.2117342","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, GEOLOGICAL","Score":null,"Total":0}
引用次数: 0

摘要

本文介绍了一座医院建筑在双隧道交叉下的广泛岩土工程评估。本研究中考虑的案例研究是德里地铁格雷线的三期工程,该工程最近使用隧道掘进机建造。对建筑物下方的两个隧道的施工进行了有限元分析,并使用先进的本构模型对土壤进行了模拟。通过现场监测数据对数值模型进行了验证,并研究了隧道开挖对建筑物变形的影响。此外,还对建筑沉降与绿地条件进行了比较。研究表明,建筑物对沉降槽的形态有一定的影响。沉降的定量研究表明,由于修建了双隧道,建筑物没有受到过度的破坏,这表明双隧道在医院大楼下方是安全的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Twin tunnelling caused distortions and its effect on a hospital building on mixed ground conditions
ABSTRACT An extensive geotechnical assessment of a hospital building under-crossed by twin tunnels is presented in this paper. The case study considered in the study is Phase III of Delhi Metro Gray line, which has been built recently using Tunnel Boring Machine. Finite element analysis was carried out to simulate the construction of two tunnels underneath the building, and the soil is simulated using an advanced constitutive model. The numerical model was validated against the field monitoring data, and the effect of tunnelling on the building deformation is also studied. Also, the comparison of building settlements with greenfield conditions is carried out. The study showed that the building influences the pattern of the settlement trough. Quantitative study of the settlement showed that there was no undue distress to the building due to the construction of twin tunnels, suggesting the safe crossing of twin tunnel below hospital building.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
5.30
自引率
5.30%
发文量
32
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信