石油勘探项目排名

IF 1 4区 经济学 Q4 BUSINESS
I. Szilágyi, Z. Sebestyén, T. Tóth
{"title":"石油勘探项目排名","authors":"I. Szilágyi, Z. Sebestyén, T. Tóth","doi":"10.1080/0013791X.2019.1593570","DOIUrl":null,"url":null,"abstract":"Abstract Project ranking based on project value is an essential management task for organizations that face resource bottlenecks. Project value focuses on the hard elements of projects that can be expressed in monetary terms. In the petroleum exploration business, however, there is also soft information, like effects on corporate liquidity, advantages of compliance with the strategic goals, or learning potential and organizational development, which may change the ranking hierarchy. The aim of this research is to provide a solution for incorporating industry-based selected soft data in the project ranking process. The process is illustrated with a case study. We took the structured system of criteria identified from the petroleum industry.","PeriodicalId":49210,"journal":{"name":"Engineering Economist","volume":"65 1","pages":"66 - 87"},"PeriodicalIF":1.0000,"publicationDate":"2020-01-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1080/0013791X.2019.1593570","citationCount":"9","resultStr":"{\"title\":\"Project Ranking in Petroleum Exploration\",\"authors\":\"I. Szilágyi, Z. Sebestyén, T. Tóth\",\"doi\":\"10.1080/0013791X.2019.1593570\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Project ranking based on project value is an essential management task for organizations that face resource bottlenecks. Project value focuses on the hard elements of projects that can be expressed in monetary terms. In the petroleum exploration business, however, there is also soft information, like effects on corporate liquidity, advantages of compliance with the strategic goals, or learning potential and organizational development, which may change the ranking hierarchy. The aim of this research is to provide a solution for incorporating industry-based selected soft data in the project ranking process. The process is illustrated with a case study. We took the structured system of criteria identified from the petroleum industry.\",\"PeriodicalId\":49210,\"journal\":{\"name\":\"Engineering Economist\",\"volume\":\"65 1\",\"pages\":\"66 - 87\"},\"PeriodicalIF\":1.0000,\"publicationDate\":\"2020-01-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1080/0013791X.2019.1593570\",\"citationCount\":\"9\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering Economist\",\"FirstCategoryId\":\"96\",\"ListUrlMain\":\"https://doi.org/10.1080/0013791X.2019.1593570\",\"RegionNum\":4,\"RegionCategory\":\"经济学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"BUSINESS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Economist","FirstCategoryId":"96","ListUrlMain":"https://doi.org/10.1080/0013791X.2019.1593570","RegionNum":4,"RegionCategory":"经济学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"BUSINESS","Score":null,"Total":0}
引用次数: 9

摘要

摘要基于项目价值的项目排名是面临资源瓶颈的组织的一项重要管理任务。项目价值侧重于项目中可以用货币表示的硬要素。然而,在石油勘探业务中,也存在软信息,如对公司流动性的影响、遵守战略目标的优势,或学习潜力和组织发展,这些信息可能会改变排名层次。本研究的目的是提供一种解决方案,将基于行业的选定软数据纳入项目排名过程。通过案例研究说明了这一过程。我们采用了从石油行业确定的结构化标准体系。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Project Ranking in Petroleum Exploration
Abstract Project ranking based on project value is an essential management task for organizations that face resource bottlenecks. Project value focuses on the hard elements of projects that can be expressed in monetary terms. In the petroleum exploration business, however, there is also soft information, like effects on corporate liquidity, advantages of compliance with the strategic goals, or learning potential and organizational development, which may change the ranking hierarchy. The aim of this research is to provide a solution for incorporating industry-based selected soft data in the project ranking process. The process is illustrated with a case study. We took the structured system of criteria identified from the petroleum industry.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Engineering Economist
Engineering Economist ENGINEERING, INDUSTRIAL-OPERATIONS RESEARCH & MANAGEMENT SCIENCE
CiteScore
2.00
自引率
0.00%
发文量
14
审稿时长
>12 weeks
期刊介绍: The Engineering Economist is a refereed journal published jointly by the Engineering Economy Division of the American Society of Engineering Education (ASEE) and the Institute of Industrial and Systems Engineers (IISE). The journal publishes articles, case studies, surveys, and book and software reviews that represent original research, current practice, and teaching involving problems of capital investment. The journal seeks submissions in a number of areas, including, but not limited to: capital investment analysis, financial risk management, cost estimation and accounting, cost of capital, design economics, economic decision analysis, engineering economy education, research and development, and the analysis of public policy when it is relevant to the economic investment decisions made by engineers and technology managers.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信