{"title":"环境影响评估通知草案2020,印度:批评","authors":"Stellina Jolly, Siddhartha Singh","doi":"10.1163/24686042-12340062","DOIUrl":null,"url":null,"abstract":"\nEnvironment Impact Assessment (EIA) is a systematic process to identify, predict, and evaluate the environmental effects of proposed actions and projects. Generally, an EIA is conducted before deciding to proceed with a specific project or activity. In India, the adoption of the Draft EIA Notification 2020 by the Ministry of Environment, Forest and Climate Change has triggered several debates over its problematic implications. The Draft EIA Notification normalizes ex post facto clearance, which allows construction or operation of the project without a prior environmental clearance. It has significantly curtailed the scope of public consultation and participation by the introduction of a large number of exemptions for projects. Further, it is silent over the project’s transboundary impacts and exempts projects within 100 km of the border areas from public consultation. Thus, the Draft EIA Notification violates the environmental law principles provided under domestic and international laws by restricting adequate scrutiny of projects. The article critically evaluates the three significant dilutions that have threatened the effectiveness of the Draft EIA Notification including ex post facto clearance, public consultation, and the exemption granted to transboundary projects, and emphasizes its need for reconsideration before the publication of the final Notification.","PeriodicalId":29889,"journal":{"name":"Chinese Journal of Environmental Law","volume":" ","pages":""},"PeriodicalIF":0.4000,"publicationDate":"2021-07-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Environmental Impact Assessment Draft Notification 2020, India: A Critique\",\"authors\":\"Stellina Jolly, Siddhartha Singh\",\"doi\":\"10.1163/24686042-12340062\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\nEnvironment Impact Assessment (EIA) is a systematic process to identify, predict, and evaluate the environmental effects of proposed actions and projects. Generally, an EIA is conducted before deciding to proceed with a specific project or activity. In India, the adoption of the Draft EIA Notification 2020 by the Ministry of Environment, Forest and Climate Change has triggered several debates over its problematic implications. The Draft EIA Notification normalizes ex post facto clearance, which allows construction or operation of the project without a prior environmental clearance. It has significantly curtailed the scope of public consultation and participation by the introduction of a large number of exemptions for projects. Further, it is silent over the project’s transboundary impacts and exempts projects within 100 km of the border areas from public consultation. Thus, the Draft EIA Notification violates the environmental law principles provided under domestic and international laws by restricting adequate scrutiny of projects. The article critically evaluates the three significant dilutions that have threatened the effectiveness of the Draft EIA Notification including ex post facto clearance, public consultation, and the exemption granted to transboundary projects, and emphasizes its need for reconsideration before the publication of the final Notification.\",\"PeriodicalId\":29889,\"journal\":{\"name\":\"Chinese Journal of Environmental Law\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.4000,\"publicationDate\":\"2021-07-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Chinese Journal of Environmental Law\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1163/24686042-12340062\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENVIRONMENTAL STUDIES\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Chinese Journal of Environmental Law","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1163/24686042-12340062","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENVIRONMENTAL STUDIES","Score":null,"Total":0}
引用次数: 3

摘要

环境影响评估(EIA)是一个系统的过程,用于识别、预测和评估拟议的行动和项目的环境影响。一般而言,环评是在决定进行某项工程或活动前进行的。在印度,环境、森林和气候变化部通过了《2020年环境影响评估通知草案》,引发了几场关于其问题影响的辩论。《环评通知草案》规范了事后审批,即允许在没有事先环境审批的情况下建设或运营项目。它通过引入大量项目豁免,大大缩小了公众咨询和参与的范围。此外,它对项目的跨界影响保持沉默,并豁免距离边境地区100公里以内的项目进行公众咨询。因此,《环评通知草案》限制了对项目的充分审查,违反了国内法和国际法律所规定的环境法原则。文章对影响《环评通知》(草案)有效性的三种重大稀释因素进行了批判性评价,包括事后审批、公众咨询和跨境项目豁免,并强调在最终《环评通知》公布前需要重新考虑。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Environmental Impact Assessment Draft Notification 2020, India: A Critique
Environment Impact Assessment (EIA) is a systematic process to identify, predict, and evaluate the environmental effects of proposed actions and projects. Generally, an EIA is conducted before deciding to proceed with a specific project or activity. In India, the adoption of the Draft EIA Notification 2020 by the Ministry of Environment, Forest and Climate Change has triggered several debates over its problematic implications. The Draft EIA Notification normalizes ex post facto clearance, which allows construction or operation of the project without a prior environmental clearance. It has significantly curtailed the scope of public consultation and participation by the introduction of a large number of exemptions for projects. Further, it is silent over the project’s transboundary impacts and exempts projects within 100 km of the border areas from public consultation. Thus, the Draft EIA Notification violates the environmental law principles provided under domestic and international laws by restricting adequate scrutiny of projects. The article critically evaluates the three significant dilutions that have threatened the effectiveness of the Draft EIA Notification including ex post facto clearance, public consultation, and the exemption granted to transboundary projects, and emphasizes its need for reconsideration before the publication of the final Notification.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
0.90
自引率
25.00%
发文量
6
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信