环保PPP项目弹性合同期限设定方式与设定效果关系研究

IF 1.9 4区 管理学 Q3 ENGINEERING, INDUSTRIAL
Lingyi Tang, Xiaer Xiahou, Kang Li, Qiming Li, Xiaoyang Hu
{"title":"环保PPP项目弹性合同期限设定方式与设定效果关系研究","authors":"Lingyi Tang, Xiaer Xiahou, Kang Li, Qiming Li, Xiaoyang Hu","doi":"10.1080/10429247.2022.2097493","DOIUrl":null,"url":null,"abstract":"Abstract Environmental protection PPP projects (EP-PPP) are subject to uncertainty during the project cycle, setting flexible project contract terms in their contracts can help establish and maintain an effective partnership. This article aims to reveal the contract flexibility mechanism of EP-PPP projects by studying the relationship between flexible contract term setting methods and their effects. Questionnaires, case studies and structural equation modeling (SEM) are applied to conduct quantitative analysis. The research shows that although some flexible terms have been adopted in current EP-PPP contracts, there is still much room for improvement. In order to deal with unforeseen risks and challenges, it is necessary to consider: (1) List uncertainties as much as possible and set up response methods accordingly; (2) Guarantee a certain degree of flexibility in uncertainty response methods; (3) Give the project itself a certain degree of autonomous response power; (4) Leave plenty space for changes that may be needed in the future. The study results can help project practitioners enhance their understanding of flexible contract terms and help to promote contract flexibility in EP-PPP projects in a context-specific manner, thereby facilitating project success.","PeriodicalId":54353,"journal":{"name":"Engineering Management Journal","volume":"35 1","pages":"272 - 284"},"PeriodicalIF":1.9000,"publicationDate":"2022-07-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Research on the Relationship Between Flexible Contract Term Setting Method and Setting Effect of Environmental Protection PPP Project\",\"authors\":\"Lingyi Tang, Xiaer Xiahou, Kang Li, Qiming Li, Xiaoyang Hu\",\"doi\":\"10.1080/10429247.2022.2097493\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Environmental protection PPP projects (EP-PPP) are subject to uncertainty during the project cycle, setting flexible project contract terms in their contracts can help establish and maintain an effective partnership. This article aims to reveal the contract flexibility mechanism of EP-PPP projects by studying the relationship between flexible contract term setting methods and their effects. Questionnaires, case studies and structural equation modeling (SEM) are applied to conduct quantitative analysis. The research shows that although some flexible terms have been adopted in current EP-PPP contracts, there is still much room for improvement. In order to deal with unforeseen risks and challenges, it is necessary to consider: (1) List uncertainties as much as possible and set up response methods accordingly; (2) Guarantee a certain degree of flexibility in uncertainty response methods; (3) Give the project itself a certain degree of autonomous response power; (4) Leave plenty space for changes that may be needed in the future. The study results can help project practitioners enhance their understanding of flexible contract terms and help to promote contract flexibility in EP-PPP projects in a context-specific manner, thereby facilitating project success.\",\"PeriodicalId\":54353,\"journal\":{\"name\":\"Engineering Management Journal\",\"volume\":\"35 1\",\"pages\":\"272 - 284\"},\"PeriodicalIF\":1.9000,\"publicationDate\":\"2022-07-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering Management Journal\",\"FirstCategoryId\":\"91\",\"ListUrlMain\":\"https://doi.org/10.1080/10429247.2022.2097493\",\"RegionNum\":4,\"RegionCategory\":\"管理学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Management Journal","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1080/10429247.2022.2097493","RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 2

摘要

摘要环保PPP项目在项目周期中存在不确定性,在合同中设定灵活的项目合同条款有助于建立和保持有效的合作伙伴关系。本文旨在通过研究弹性合同期限设定方法及其效果之间的关系,揭示EP-PPP项目的合同弹性机制。采用问卷调查、案例研究和结构方程建模(SEM)进行定量分析。研究表明,尽管现行EP-PPP合同采用了一些灵活的条款,但仍有很大的改进空间。为了应对不可预见的风险和挑战,有必要考虑:(1)尽可能列出不确定性,并制定相应的应对方法;(2) 保证不确定性响应方法具有一定的灵活性;(3) 赋予项目本身一定程度的自主响应能力;(4) 为未来可能需要的改变留出足够的空间。研究结果可以帮助项目从业者增强对灵活合同条款的理解,并有助于以特定的方式促进EP-PPP项目中的合同灵活性,从而促进项目的成功。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Research on the Relationship Between Flexible Contract Term Setting Method and Setting Effect of Environmental Protection PPP Project
Abstract Environmental protection PPP projects (EP-PPP) are subject to uncertainty during the project cycle, setting flexible project contract terms in their contracts can help establish and maintain an effective partnership. This article aims to reveal the contract flexibility mechanism of EP-PPP projects by studying the relationship between flexible contract term setting methods and their effects. Questionnaires, case studies and structural equation modeling (SEM) are applied to conduct quantitative analysis. The research shows that although some flexible terms have been adopted in current EP-PPP contracts, there is still much room for improvement. In order to deal with unforeseen risks and challenges, it is necessary to consider: (1) List uncertainties as much as possible and set up response methods accordingly; (2) Guarantee a certain degree of flexibility in uncertainty response methods; (3) Give the project itself a certain degree of autonomous response power; (4) Leave plenty space for changes that may be needed in the future. The study results can help project practitioners enhance their understanding of flexible contract terms and help to promote contract flexibility in EP-PPP projects in a context-specific manner, thereby facilitating project success.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Engineering Management Journal
Engineering Management Journal 工程技术-工程:工业
CiteScore
5.60
自引率
12.00%
发文量
27
审稿时长
>12 weeks
期刊介绍: EMJ is designed to provide practical, pertinent knowledge on the management of technology, technical professionals, and technical organizations. EMJ strives to provide value to the practice of engineering management and engineering managers. EMJ is an archival journal that facilitates both practitioners and university faculty in publishing useful articles. The primary focus is on articles that improve the practice of engineering management. To support the practice of engineering management, EMJ publishes papers within key engineering management content areas. EMJ Editors will continue to refine these areas to ensure they are aligned with the challenges faced by technical organizations and technical managers.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信