基于数学模型改进俄罗斯联邦北极地区公司开采和加工铁矿石的环境和经济评估方法

Q4 Engineering
C.V. Tishkov, A. Volkov, K. Kulakov, V. Shchiptsov
{"title":"基于数学模型改进俄罗斯联邦北极地区公司开采和加工铁矿石的环境和经济评估方法","authors":"C.V. Tishkov, A. Volkov, K. Kulakov, V. Shchiptsov","doi":"10.30686/1609-9192-2022-2-112-119","DOIUrl":null,"url":null,"abstract":"Iron ore production traditionally performs an important function in providing the world's manufacturing industry with raw materials and semi-finished products, and plays an important role in the socio-economic development of the regions of the North of Russia. One of the key issues of field operation remains the current, accumulated and potential environmental damage to the territories of location associated with the accumulation of waste from primary processing of raw materials stored in tailings. The development of raw material extraction technologies makes it possible to increase the time horizon for the exploitation of deposits, but requires measures to increase the capacity of the tailings storage facility, modernization of hydraulic structures serving it. In the article, on the basis of forecast data on the development of tailings facilities of the ‘Karelsky Okatysh’ JSC for the period up to 2043, a model for calculating the occupancy of a tailings pond in the event of a new dam break is constructed. At the moment, within the framework of the development of tailings facilities at the specified enterprise, the organization of the construction of a tailings dump on the site of an alluvial beach is being carried out. One of the bases of decision-making is risk assessment, which includes an assessment of emergency situations. 2 scenarios of accidents at the GTS are considered: the loss of static stability of the dam, i.e. the break of the dam wall during normal operation (A1) and the erosion of the body of the dam as a result of the overflow of water over the crest, i.e. the overflow of water over the top of the dam with subsequent destruction of the wall (A2). The assessment of the capacity of the new and old tailings dam (settling pond) and the capacity of new and old hydraulic structures and the analysis of the possibility of using a settling pond and a system of spillway structures, depending on the degree of construction of the tailings pond. The conclusion is made about the necessary measures to improve this system for the localization of man-made accidents in various scenarios.","PeriodicalId":36119,"journal":{"name":"Gornaya Promyshlennost","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-05-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Improvement of environmental and economic assessment methods of miningand processing of iron ore by corporations of the Arctic zone of the Russian Federation based on mathematical modeling\",\"authors\":\"C.V. Tishkov, A. Volkov, K. Kulakov, V. Shchiptsov\",\"doi\":\"10.30686/1609-9192-2022-2-112-119\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Iron ore production traditionally performs an important function in providing the world's manufacturing industry with raw materials and semi-finished products, and plays an important role in the socio-economic development of the regions of the North of Russia. One of the key issues of field operation remains the current, accumulated and potential environmental damage to the territories of location associated with the accumulation of waste from primary processing of raw materials stored in tailings. The development of raw material extraction technologies makes it possible to increase the time horizon for the exploitation of deposits, but requires measures to increase the capacity of the tailings storage facility, modernization of hydraulic structures serving it. In the article, on the basis of forecast data on the development of tailings facilities of the ‘Karelsky Okatysh’ JSC for the period up to 2043, a model for calculating the occupancy of a tailings pond in the event of a new dam break is constructed. At the moment, within the framework of the development of tailings facilities at the specified enterprise, the organization of the construction of a tailings dump on the site of an alluvial beach is being carried out. One of the bases of decision-making is risk assessment, which includes an assessment of emergency situations. 2 scenarios of accidents at the GTS are considered: the loss of static stability of the dam, i.e. the break of the dam wall during normal operation (A1) and the erosion of the body of the dam as a result of the overflow of water over the crest, i.e. the overflow of water over the top of the dam with subsequent destruction of the wall (A2). The assessment of the capacity of the new and old tailings dam (settling pond) and the capacity of new and old hydraulic structures and the analysis of the possibility of using a settling pond and a system of spillway structures, depending on the degree of construction of the tailings pond. The conclusion is made about the necessary measures to improve this system for the localization of man-made accidents in various scenarios.\",\"PeriodicalId\":36119,\"journal\":{\"name\":\"Gornaya Promyshlennost\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-05-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Gornaya Promyshlennost\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30686/1609-9192-2022-2-112-119\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Gornaya Promyshlennost","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30686/1609-9192-2022-2-112-119","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 1

摘要

铁矿石生产传统上在为世界制造业提供原材料和半成品方面发挥着重要作用,在俄罗斯北部地区的社会经济发展中发挥着重要作用。实地作业的一个关键问题仍然是与储存在尾矿中的原料的初级加工所产生的废物的积累有关的对地点领土的当前、累积和潜在的环境损害。原料提取技术的发展使开采矿床的时间有可能延长,但需要采取措施增加尾矿储存设施的容量,使为其服务的水工设施现代化。本文根据Karelsky Okatysh公司截至2043年的尾矿设施发展预测数据,建立了新的溃坝情况下尾矿库占用率的计算模型。目前,在该企业尾矿设施建设的框架内,正在组织在某冲积滩涂场址建设尾矿库。决策的基础之一是风险评估,其中包括对紧急情况的评估。考虑了两种事故情况:大坝静力稳定性的丧失,即在正常运行期间大坝墙的破裂(A1),以及由于水溢出坝顶而导致坝体的侵蚀,即水溢出坝顶并随后破坏坝顶(A2)。根据尾矿库的建设程度,对新、旧尾矿库(沉降池)的容量和新、旧水工构筑物的容量进行评价,并分析采用沉降池和一套溢洪道结构的可能性。针对各种情况下人为事故的定位,提出了完善该系统的必要措施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Improvement of environmental and economic assessment methods of miningand processing of iron ore by corporations of the Arctic zone of the Russian Federation based on mathematical modeling
Iron ore production traditionally performs an important function in providing the world's manufacturing industry with raw materials and semi-finished products, and plays an important role in the socio-economic development of the regions of the North of Russia. One of the key issues of field operation remains the current, accumulated and potential environmental damage to the territories of location associated with the accumulation of waste from primary processing of raw materials stored in tailings. The development of raw material extraction technologies makes it possible to increase the time horizon for the exploitation of deposits, but requires measures to increase the capacity of the tailings storage facility, modernization of hydraulic structures serving it. In the article, on the basis of forecast data on the development of tailings facilities of the ‘Karelsky Okatysh’ JSC for the period up to 2043, a model for calculating the occupancy of a tailings pond in the event of a new dam break is constructed. At the moment, within the framework of the development of tailings facilities at the specified enterprise, the organization of the construction of a tailings dump on the site of an alluvial beach is being carried out. One of the bases of decision-making is risk assessment, which includes an assessment of emergency situations. 2 scenarios of accidents at the GTS are considered: the loss of static stability of the dam, i.e. the break of the dam wall during normal operation (A1) and the erosion of the body of the dam as a result of the overflow of water over the crest, i.e. the overflow of water over the top of the dam with subsequent destruction of the wall (A2). The assessment of the capacity of the new and old tailings dam (settling pond) and the capacity of new and old hydraulic structures and the analysis of the possibility of using a settling pond and a system of spillway structures, depending on the degree of construction of the tailings pond. The conclusion is made about the necessary measures to improve this system for the localization of man-made accidents in various scenarios.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Gornaya Promyshlennost
Gornaya Promyshlennost Engineering-Industrial and Manufacturing Engineering
CiteScore
1.10
自引率
0.00%
发文量
100
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信