项目团队成员能力的主动规划

IF 0.4 Q4 MANAGEMENT
E. Szwarc, J. Wikarek
{"title":"项目团队成员能力的主动规划","authors":"E. Szwarc, J. Wikarek","doi":"10.2478/fman-2020-0006","DOIUrl":null,"url":null,"abstract":"Abstract Among the many factors that cause project delays or cancellations are disruptions, that is, unforeseen events occurring during the implementation of a project, which postpone or interrupt the performance of project activities. Examples of disruptions include employee absenteeism, addition of new activities, and others. One way to deal with this type of events is to predict potential disruptions and prepare redundant resources to be used should a disruption occur (proactive approach). The focus of the present paper are human resources, in particular redundant project team competence frameworks, which allow to continue work on a project in the event of a disruption. Previous studies on planning competence frameworks regard insensitivity (robustness) to one type of disruption, caused by employee absenteeism (an absence of one, two, or three employees). The goal of this article is to present a proactive procedure that allows to seek competence frameworks robust to two types of disruptions: absence of one employee and addition of new activities not included in the project plan. Examples are provided to illustrate how the proposed approach can be used in practice.","PeriodicalId":43250,"journal":{"name":"Foundations of Management","volume":"12 1","pages":"71 - 84"},"PeriodicalIF":0.4000,"publicationDate":"2020-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Proactive Planning of Project Team Members’ Competences\",\"authors\":\"E. Szwarc, J. Wikarek\",\"doi\":\"10.2478/fman-2020-0006\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Among the many factors that cause project delays or cancellations are disruptions, that is, unforeseen events occurring during the implementation of a project, which postpone or interrupt the performance of project activities. Examples of disruptions include employee absenteeism, addition of new activities, and others. One way to deal with this type of events is to predict potential disruptions and prepare redundant resources to be used should a disruption occur (proactive approach). The focus of the present paper are human resources, in particular redundant project team competence frameworks, which allow to continue work on a project in the event of a disruption. Previous studies on planning competence frameworks regard insensitivity (robustness) to one type of disruption, caused by employee absenteeism (an absence of one, two, or three employees). The goal of this article is to present a proactive procedure that allows to seek competence frameworks robust to two types of disruptions: absence of one employee and addition of new activities not included in the project plan. Examples are provided to illustrate how the proposed approach can be used in practice.\",\"PeriodicalId\":43250,\"journal\":{\"name\":\"Foundations of Management\",\"volume\":\"12 1\",\"pages\":\"71 - 84\"},\"PeriodicalIF\":0.4000,\"publicationDate\":\"2020-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Foundations of Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/fman-2020-0006\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Foundations of Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/fman-2020-0006","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 7

摘要

摘要在导致项目延迟或取消的许多因素中,有中断,即在项目实施过程中发生的不可预见的事件,这些事件推迟或中断了项目活动的执行。干扰的例子包括员工缺勤、增加新活动等。处理这类事件的一种方法是预测潜在的中断,并准备在发生中断时使用的冗余资源(主动方法)。本文件的重点是人力资源,特别是冗余的项目团队能力框架,这些框架允许在项目中断的情况下继续工作。先前关于规划能力框架的研究认为,员工缺勤(一名、两名或三名员工缺勤)对一种类型的干扰不敏感(稳健性)。本文的目标是提出一个积极主动的程序,使其能够寻求对两种类型的中断保持稳健的能力框架:一种是缺少一名员工,另一种是增加项目计划中未包含的新活动。举例说明了如何在实践中使用所提出的方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Proactive Planning of Project Team Members’ Competences
Abstract Among the many factors that cause project delays or cancellations are disruptions, that is, unforeseen events occurring during the implementation of a project, which postpone or interrupt the performance of project activities. Examples of disruptions include employee absenteeism, addition of new activities, and others. One way to deal with this type of events is to predict potential disruptions and prepare redundant resources to be used should a disruption occur (proactive approach). The focus of the present paper are human resources, in particular redundant project team competence frameworks, which allow to continue work on a project in the event of a disruption. Previous studies on planning competence frameworks regard insensitivity (robustness) to one type of disruption, caused by employee absenteeism (an absence of one, two, or three employees). The goal of this article is to present a proactive procedure that allows to seek competence frameworks robust to two types of disruptions: absence of one employee and addition of new activities not included in the project plan. Examples are provided to illustrate how the proposed approach can be used in practice.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
2.20
自引率
0.00%
发文量
5
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信