{"title":"区分成功和不成功的系统交付项目(sdp)的(具体地)是什么?","authors":"Matti J. Haverila, Jenny C. Twyford","doi":"10.1108/jfm-03-2022-0029","DOIUrl":null,"url":null,"abstract":"\nPurpose\nAgainst the backdrop of management, planning, temporary organizations, Shannon–Weaver theory of communication and evaluation theories, the purpose of this research paper is to examine the relative importance of specific project management tasks in the various phases of system delivery projects in distinguishing successful and unsuccessful projects.\n\n\nDesign/methodology/approach\nA survey method was used (N = 3,129) to collect data from the customers of a major systems delivery project management company operating in the facilities management industry. Logistic regression was used to analyze the capability and relative importance of the tasks in discriminating successful and unsuccessful projects.\n\n\nFindings\nThe results of the paper indicate that three out four installation tasks were among the top three in their ability to differentiate the successful and unsuccessful systems delivery project. Especially critical tasks were “Meeting milestones” and “Allocation of appropriate resources” so that the project could be completed on-time. Relatively less important tasks were “Advice and suggestions regarding the development of specifications for the project” and “Proposal to meet the intent of the company’s specifications” in the proposal phase of the project, and “Resolving warranty issues as defined by the warranty process” in the commissioning phase.\n\n\nOriginality/value\nPrevious research has assessed the importance of the various project management phases. This research examines the capability of the more minutiae tasks to distinguish the successful and unsuccessful projects in the various phases of systems delivery projects, i.e. proposal, installation and commissioning.\n","PeriodicalId":46544,"journal":{"name":"Journal of Facilities Management","volume":" ","pages":""},"PeriodicalIF":2.2000,"publicationDate":"2022-10-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"What (specifically) differentiates the successful and unsuccessful systems delivery projects (SDPs)\",\"authors\":\"Matti J. Haverila, Jenny C. Twyford\",\"doi\":\"10.1108/jfm-03-2022-0029\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\nPurpose\\nAgainst the backdrop of management, planning, temporary organizations, Shannon–Weaver theory of communication and evaluation theories, the purpose of this research paper is to examine the relative importance of specific project management tasks in the various phases of system delivery projects in distinguishing successful and unsuccessful projects.\\n\\n\\nDesign/methodology/approach\\nA survey method was used (N = 3,129) to collect data from the customers of a major systems delivery project management company operating in the facilities management industry. Logistic regression was used to analyze the capability and relative importance of the tasks in discriminating successful and unsuccessful projects.\\n\\n\\nFindings\\nThe results of the paper indicate that three out four installation tasks were among the top three in their ability to differentiate the successful and unsuccessful systems delivery project. Especially critical tasks were “Meeting milestones” and “Allocation of appropriate resources” so that the project could be completed on-time. Relatively less important tasks were “Advice and suggestions regarding the development of specifications for the project” and “Proposal to meet the intent of the company’s specifications” in the proposal phase of the project, and “Resolving warranty issues as defined by the warranty process” in the commissioning phase.\\n\\n\\nOriginality/value\\nPrevious research has assessed the importance of the various project management phases. This research examines the capability of the more minutiae tasks to distinguish the successful and unsuccessful projects in the various phases of systems delivery projects, i.e. proposal, installation and commissioning.\\n\",\"PeriodicalId\":46544,\"journal\":{\"name\":\"Journal of Facilities Management\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":2.2000,\"publicationDate\":\"2022-10-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Facilities Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/jfm-03-2022-0029\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Facilities Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/jfm-03-2022-0029","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 0

摘要

目的在管理、计划、临时组织、Shannon–Weaver沟通理论和评估理论的背景下,本文的目的是检验系统交付项目各个阶段的特定项目管理任务在区分成功和不成功项目方面的相对重要性。设计/方法/方法使用调查方法(N=3129)从设施管理行业的一家主要系统交付项目管理公司的客户那里收集数据。采用Logistic回归分析任务在区分成功和不成功项目中的能力和相对重要性。发现论文的结果表明,四分之三的安装任务在区分成功和不成功的系统交付项目的能力方面排名前三。特别关键的任务是“达到里程碑”和“分配适当的资源”,以便项目能够按时完成。相对不那么重要的任务是在项目提案阶段的“关于制定项目规范的建议和建议”和“满足公司规范意图的提案”,以及在调试阶段的“解决保修过程中定义的保修问题”。原创性/价值先前的研究评估了各个项目管理阶段的重要性。本研究考察了在系统交付项目的各个阶段,即提案、安装和调试,更细微的任务区分成功和不成功项目的能力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
What (specifically) differentiates the successful and unsuccessful systems delivery projects (SDPs)
Purpose Against the backdrop of management, planning, temporary organizations, Shannon–Weaver theory of communication and evaluation theories, the purpose of this research paper is to examine the relative importance of specific project management tasks in the various phases of system delivery projects in distinguishing successful and unsuccessful projects. Design/methodology/approach A survey method was used (N = 3,129) to collect data from the customers of a major systems delivery project management company operating in the facilities management industry. Logistic regression was used to analyze the capability and relative importance of the tasks in discriminating successful and unsuccessful projects. Findings The results of the paper indicate that three out four installation tasks were among the top three in their ability to differentiate the successful and unsuccessful systems delivery project. Especially critical tasks were “Meeting milestones” and “Allocation of appropriate resources” so that the project could be completed on-time. Relatively less important tasks were “Advice and suggestions regarding the development of specifications for the project” and “Proposal to meet the intent of the company’s specifications” in the proposal phase of the project, and “Resolving warranty issues as defined by the warranty process” in the commissioning phase. Originality/value Previous research has assessed the importance of the various project management phases. This research examines the capability of the more minutiae tasks to distinguish the successful and unsuccessful projects in the various phases of systems delivery projects, i.e. proposal, installation and commissioning.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
4.30
自引率
15.80%
发文量
56
期刊介绍: Journal of Facilities Management is a strategic level journal for Heads of Facilities and Corporate Real Estate. Guided by its international and expert Editorial Board, Journal of Facilities Management publishes high-quality, authoritative, and detailed analysis, briefings and case studies on how facilities can and do play a vital part in helping deliver corporate strategy. This quarterly publication features contributions from leading practitioners and thinkers in the field of Facilities Management, from some of the leading companies, government institutions, and universities in the world. The journal features a combination of theoretical and practical articles, complemented by a wide range of case studies and regular features, identifying key implications for senior practitioners in Facilities Management.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信