{"title":"KD建筑公司:投标和成本估算","authors":"Faisal Kareem Khuhro, Waseem Khan Dharejo","doi":"10.22555/ijelcs.v3i2.2058","DOIUrl":null,"url":null,"abstract":"KD Construction is a new company in the construction industry, it was opened by Mr. Irfan and Mr. Kamran on February 6, 2013. The company constructs houses for individuals and for builders, commercial shopping malls and also works as a subcontractor for big construction companies like Habib, Paragon and AMCE Private Limited. KD worked on only small projects till now, but on January 17, 2018 Mr. Irfan received a call from a builder to work with him on a new project.  This will be the first time that they   got a contract from a big builder and they were asked to build houses for four variants of areas (in square yards 150, 250, 300 and 600) on which they had to work. They gave  their final price of 107 crores and 50 lacs for the whole project,  but they heard from the market that other construction companies were also trying for this project but the builder preferred them for this project.   Mr. Irfan and Mr. Kamran have to estimate costs for the overall project whether to accept the project or not, to analyze whether the offered price was suitable or not and if they had estimated cost of total project they can negotiate on final price if the price is not suitable. As KD is in existence for five years, KD’s employees are well aware of the prices and conditions of the country moreover, country’s economic conditions can fluctuate any time due to political instability. With the experience of five years, KD construction wanted to estimate a budget for the whole project of 20 acres on which they have to construct 75% houses and 25% of amenities (Mosque, Road, Park, School, Hospital) (See Exhibit 1) in one year.","PeriodicalId":32665,"journal":{"name":"International Journal of Experiential Learning Case Studies","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"KD Construction Company: Bidding and Cost Estimation\",\"authors\":\"Faisal Kareem Khuhro, Waseem Khan Dharejo\",\"doi\":\"10.22555/ijelcs.v3i2.2058\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"KD Construction is a new company in the construction industry, it was opened by Mr. Irfan and Mr. Kamran on February 6, 2013. The company constructs houses for individuals and for builders, commercial shopping malls and also works as a subcontractor for big construction companies like Habib, Paragon and AMCE Private Limited. KD worked on only small projects till now, but on January 17, 2018 Mr. Irfan received a call from a builder to work with him on a new project.  This will be the first time that they   got a contract from a big builder and they were asked to build houses for four variants of areas (in square yards 150, 250, 300 and 600) on which they had to work. They gave  their final price of 107 crores and 50 lacs for the whole project,  but they heard from the market that other construction companies were also trying for this project but the builder preferred them for this project.   Mr. Irfan and Mr. Kamran have to estimate costs for the overall project whether to accept the project or not, to analyze whether the offered price was suitable or not and if they had estimated cost of total project they can negotiate on final price if the price is not suitable. As KD is in existence for five years, KD’s employees are well aware of the prices and conditions of the country moreover, country’s economic conditions can fluctuate any time due to political instability. With the experience of five years, KD construction wanted to estimate a budget for the whole project of 20 acres on which they have to construct 75% houses and 25% of amenities (Mosque, Road, Park, School, Hospital) (See Exhibit 1) in one year.\",\"PeriodicalId\":32665,\"journal\":{\"name\":\"International Journal of Experiential Learning Case Studies\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-12-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Experiential Learning Case Studies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22555/ijelcs.v3i2.2058\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Experiential Learning Case Studies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22555/ijelcs.v3i2.2058","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

KD Construction是建筑行业的一家新公司,由Irfan先生和Kamran先生于2013年2月6日成立。该公司为个人、建筑商、商业购物中心建造房屋,同时也是哈比卜、Paragon和AMCE Private Limited等大型建筑公司的分包商。到目前为止,KD只参与了一些小项目,但在2018年1月17日,Irfan先生接到了一位建筑商的电话,希望与他一起参与一个新项目。这将是他们第一次从大型建筑商那里获得合同,并被要求为他们必须工作的四种不同区域(150、250、300和600平方码)建造房屋。他们给出了整个项目1.07亿卢比和50拉克的最终价格,但他们从市场上听说,其他建筑公司也在尝试这个项目,但建筑商更喜欢他们。Irfan先生和Kamran先生必须估计整个项目的成本,无论是否接受该项目,分析报价是否合适,如果他们有整个项目的估计成本,如果价格不合适,他们可以就最终价格进行谈判。由于KD已经存在了五年,KD的员工非常了解该国的价格和条件。此外,由于政治不稳定,该国的经济状况随时可能波动。凭借五年的经验,KD建筑公司希望估算整个20英亩项目的预算,他们必须在一年内建造75%的房屋和25%的设施(清真寺、道路、公园、学校、医院)(见附件1)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
KD Construction Company: Bidding and Cost Estimation
KD Construction is a new company in the construction industry, it was opened by Mr. Irfan and Mr. Kamran on February 6, 2013. The company constructs houses for individuals and for builders, commercial shopping malls and also works as a subcontractor for big construction companies like Habib, Paragon and AMCE Private Limited. KD worked on only small projects till now, but on January 17, 2018 Mr. Irfan received a call from a builder to work with him on a new project.  This will be the first time that they   got a contract from a big builder and they were asked to build houses for four variants of areas (in square yards 150, 250, 300 and 600) on which they had to work. They gave  their final price of 107 crores and 50 lacs for the whole project,  but they heard from the market that other construction companies were also trying for this project but the builder preferred them for this project.   Mr. Irfan and Mr. Kamran have to estimate costs for the overall project whether to accept the project or not, to analyze whether the offered price was suitable or not and if they had estimated cost of total project they can negotiate on final price if the price is not suitable. As KD is in existence for five years, KD’s employees are well aware of the prices and conditions of the country moreover, country’s economic conditions can fluctuate any time due to political instability. With the experience of five years, KD construction wanted to estimate a budget for the whole project of 20 acres on which they have to construct 75% houses and 25% of amenities (Mosque, Road, Park, School, Hospital) (See Exhibit 1) in one year.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
5
审稿时长
5 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信