{"title":"乌达奇尼矿井除水厂第三次抽水管道建设的合理性论证","authors":"N. Ovchinnikov, I. Zyryanov","doi":"10.17580/gzh.2023.08.12","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":12821,"journal":{"name":"Gornyi Zhurnal","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-08-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Justification of expedience of the third pumping pipeline construction at water-removal plant in Udachny Mine\",\"authors\":\"N. Ovchinnikov, I. Zyryanov\",\"doi\":\"10.17580/gzh.2023.08.12\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":12821,\"journal\":{\"name\":\"Gornyi Zhurnal\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-08-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Gornyi Zhurnal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.17580/gzh.2023.08.12\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Earth and Planetary Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Gornyi Zhurnal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17580/gzh.2023.08.12","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}