尼日利亚建设项目环境影响评估实施的障碍

IF 1.9 Q3 ENGINEERING, CIVIL
I. Osuizugbo, Chinedu Valerie Nnodu
{"title":"尼日利亚建设项目环境影响评估实施的障碍","authors":"I. Osuizugbo, Chinedu Valerie Nnodu","doi":"10.1108/bepam-12-2022-0203","DOIUrl":null,"url":null,"abstract":"PurposeEnvironmental impact assessment (EIA) is one of the best approaches to identifying, preventing, minimising, compensating for any unfavourable impacts on the environment and also encouraging sustainability. This paper aims to investigate the barriers to EIA implementation for construction projects in Nigeria.Design/methodology/approachThe study adopted a survey research technique. The snowball sampling approach was adopted to identify key stakeholders in EIA practice for the administration of questionnaire. A total of 187 questionnaires were administered and a response rate of 60% (113 questionnaires were adequately filled and returned) was achieved. Descriptive and inferential statistics were utilised in analysing elicited data.FindingsThe results from data analysis showed that, “failure to influence the decision-making process/multiple conflicting decision-making”, “unstable regulatory regime”, “lack of available, accessible and fit-for purpose data”, “inadequate public knowledge of legal issues” and “poor provision of information” were the top most five barriers to EIA implementation for construction projects in Nigeria. Also, the results from the research show a statistically significant degree of agreement on the rankings by the groups of key stakeholders in EIA concerning the barriers to EIA implementation for construction projects.Originality/valueThis paper contributed to more effective EIA studies by drawing attentions to barriers to EIA implementation for construction projects. An understanding of these barriers can help key stakeholders in the construction industry of developing countries such as Nigeria to facilitate development of methods required in reducing barriers to EIA implementation in the construction sector.","PeriodicalId":46426,"journal":{"name":"Built Environment Project and Asset Management","volume":" ","pages":""},"PeriodicalIF":1.9000,"publicationDate":"2023-05-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Barriers to environmental impact assessment implementation for construction projects in Nigeria\",\"authors\":\"I. Osuizugbo, Chinedu Valerie Nnodu\",\"doi\":\"10.1108/bepam-12-2022-0203\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PurposeEnvironmental impact assessment (EIA) is one of the best approaches to identifying, preventing, minimising, compensating for any unfavourable impacts on the environment and also encouraging sustainability. This paper aims to investigate the barriers to EIA implementation for construction projects in Nigeria.Design/methodology/approachThe study adopted a survey research technique. The snowball sampling approach was adopted to identify key stakeholders in EIA practice for the administration of questionnaire. A total of 187 questionnaires were administered and a response rate of 60% (113 questionnaires were adequately filled and returned) was achieved. Descriptive and inferential statistics were utilised in analysing elicited data.FindingsThe results from data analysis showed that, “failure to influence the decision-making process/multiple conflicting decision-making”, “unstable regulatory regime”, “lack of available, accessible and fit-for purpose data”, “inadequate public knowledge of legal issues” and “poor provision of information” were the top most five barriers to EIA implementation for construction projects in Nigeria. Also, the results from the research show a statistically significant degree of agreement on the rankings by the groups of key stakeholders in EIA concerning the barriers to EIA implementation for construction projects.Originality/valueThis paper contributed to more effective EIA studies by drawing attentions to barriers to EIA implementation for construction projects. An understanding of these barriers can help key stakeholders in the construction industry of developing countries such as Nigeria to facilitate development of methods required in reducing barriers to EIA implementation in the construction sector.\",\"PeriodicalId\":46426,\"journal\":{\"name\":\"Built Environment Project and Asset Management\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":1.9000,\"publicationDate\":\"2023-05-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Built Environment Project and Asset Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/bepam-12-2022-0203\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Built Environment Project and Asset Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/bepam-12-2022-0203","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

摘要

目的环境影响评估(EIA)是识别、预防、减少和补偿任何对环境不利影响以及鼓励可持续发展的最佳方法之一。本文旨在探讨尼日利亚建设项目实施环境影响评价的障碍。设计/方法/方法这项研究采用了调查研究方法。采用滚雪球抽样方法确定环境影响评估实践中问卷管理的关键利益相关者。共发放问卷187份,回复率为60%(113份问卷得到充分填写和返还)。描述性和推断性统计用于分析所得数据。数据分析结果表明,“未能影响决策过程/多重相互冲突的决策”、“监管制度不稳定”、“缺乏可用、可获取和适合目的的数据”、“公众对法律问题的了解不足”和“信息提供不足”是尼日利亚建设项目实施环境影响评估的五大障碍。研究结果表明,环评主要利益相关者群体对建设项目实施环评障碍的排序具有统计学上显著的一致性。本文通过关注建设项目实施环境影响评价的障碍,有助于开展更有效的环境影响评价研究。了解这些障碍可以帮助尼日利亚等发展中国家建筑业的主要利益相关者促进制定减少建筑部门实施环境影响评估障碍所需的方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Barriers to environmental impact assessment implementation for construction projects in Nigeria
PurposeEnvironmental impact assessment (EIA) is one of the best approaches to identifying, preventing, minimising, compensating for any unfavourable impacts on the environment and also encouraging sustainability. This paper aims to investigate the barriers to EIA implementation for construction projects in Nigeria.Design/methodology/approachThe study adopted a survey research technique. The snowball sampling approach was adopted to identify key stakeholders in EIA practice for the administration of questionnaire. A total of 187 questionnaires were administered and a response rate of 60% (113 questionnaires were adequately filled and returned) was achieved. Descriptive and inferential statistics were utilised in analysing elicited data.FindingsThe results from data analysis showed that, “failure to influence the decision-making process/multiple conflicting decision-making”, “unstable regulatory regime”, “lack of available, accessible and fit-for purpose data”, “inadequate public knowledge of legal issues” and “poor provision of information” were the top most five barriers to EIA implementation for construction projects in Nigeria. Also, the results from the research show a statistically significant degree of agreement on the rankings by the groups of key stakeholders in EIA concerning the barriers to EIA implementation for construction projects.Originality/valueThis paper contributed to more effective EIA studies by drawing attentions to barriers to EIA implementation for construction projects. An understanding of these barriers can help key stakeholders in the construction industry of developing countries such as Nigeria to facilitate development of methods required in reducing barriers to EIA implementation in the construction sector.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
4.30
自引率
9.10%
发文量
41
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信