{"title":"盾构机运行参数对双堆式隧道沉降影响的数值研究——以胡志明市轨道交通1号线为例","authors":"Anh Do Ngoc, D. Dias, Thang Trong Dang","doi":"10.15625/2615-9783/16442","DOIUrl":null,"url":null,"abstract":"Three-dimensional finite difference calculations are proposed to investigate the influence of operation parameters of the shield machines during twin stacked tunnel excavation on the surface settlements. The numerical model is validated by experimental data obtained from Hochiminh’s metro line 1 project, used as a reference case in this study. The parametric study focuses on the influence of the face support pressure, the grouting pressure, and the shield’s length. The numerical results indicated that a decrease does not always follow an increase in surface settlements' face and grouting pressure. A shorter shield machine causes smaller surface settlements to develop over single lower and twin stacked tunnels.","PeriodicalId":23639,"journal":{"name":"VIETNAM JOURNAL OF EARTH SCIENCES","volume":null,"pages":null},"PeriodicalIF":2.4000,"publicationDate":"2021-08-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"A numerical investigation of the impact of shield machine’s operation parameters on the settlements above twin stacked tunnels - A case study of Ho Chi Minh urban railway Line 1\",\"authors\":\"Anh Do Ngoc, D. Dias, Thang Trong Dang\",\"doi\":\"10.15625/2615-9783/16442\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Three-dimensional finite difference calculations are proposed to investigate the influence of operation parameters of the shield machines during twin stacked tunnel excavation on the surface settlements. The numerical model is validated by experimental data obtained from Hochiminh’s metro line 1 project, used as a reference case in this study. The parametric study focuses on the influence of the face support pressure, the grouting pressure, and the shield’s length. The numerical results indicated that a decrease does not always follow an increase in surface settlements' face and grouting pressure. A shorter shield machine causes smaller surface settlements to develop over single lower and twin stacked tunnels.\",\"PeriodicalId\":23639,\"journal\":{\"name\":\"VIETNAM JOURNAL OF EARTH SCIENCES\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":2.4000,\"publicationDate\":\"2021-08-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"VIETNAM JOURNAL OF EARTH SCIENCES\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.15625/2615-9783/16442\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"GEOSCIENCES, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"VIETNAM JOURNAL OF EARTH SCIENCES","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.15625/2615-9783/16442","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"GEOSCIENCES, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 2

摘要

提出了三维有限差分计算,以研究双叠层隧道开挖过程中盾构机操作参数对地表沉降的影响。该数值模型通过Hochiminh地铁1号线工程的实验数据进行了验证,并作为本研究的参考案例。参数研究的重点是工作面支护压力、灌浆压力和盾构长度的影响。数值结果表明,表面沉降面和灌浆压力的增加并不总是导致沉降面的减少。较短的盾构机会在单个较低和双堆叠隧道上产生较小的表面沉降。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A numerical investigation of the impact of shield machine’s operation parameters on the settlements above twin stacked tunnels - A case study of Ho Chi Minh urban railway Line 1
Three-dimensional finite difference calculations are proposed to investigate the influence of operation parameters of the shield machines during twin stacked tunnel excavation on the surface settlements. The numerical model is validated by experimental data obtained from Hochiminh’s metro line 1 project, used as a reference case in this study. The parametric study focuses on the influence of the face support pressure, the grouting pressure, and the shield’s length. The numerical results indicated that a decrease does not always follow an increase in surface settlements' face and grouting pressure. A shorter shield machine causes smaller surface settlements to develop over single lower and twin stacked tunnels.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
VIETNAM JOURNAL OF EARTH SCIENCES
VIETNAM JOURNAL OF EARTH SCIENCES GEOSCIENCES, MULTIDISCIPLINARY-
CiteScore
3.60
自引率
20.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信