{"title":"盾构机运行参数对双堆式隧道沉降影响的数值研究——以胡志明市轨道交通1号线为例","authors":"Anh Do Ngoc, D. Dias, Thang Trong Dang","doi":"10.15625/2615-9783/16442","DOIUrl":null,"url":null,"abstract":"Three-dimensional finite difference calculations are proposed to investigate the influence of operation parameters of the shield machines during twin stacked tunnel excavation on the surface settlements. The numerical model is validated by experimental data obtained from Hochiminh’s metro line 1 project, used as a reference case in this study. The parametric study focuses on the influence of the face support pressure, the grouting pressure, and the shield’s length. The numerical results indicated that a decrease does not always follow an increase in surface settlements' face and grouting pressure. A shorter shield machine causes smaller surface settlements to develop over single lower and twin stacked tunnels.","PeriodicalId":23639,"journal":{"name":"VIETNAM JOURNAL OF EARTH SCIENCES","volume":null,"pages":null},"PeriodicalIF":2.4000,"publicationDate":"2021-08-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"A numerical investigation of the impact of shield machine’s operation parameters on the settlements above twin stacked tunnels - A case study of Ho Chi Minh urban railway Line 1\",\"authors\":\"Anh Do Ngoc, D. Dias, Thang Trong Dang\",\"doi\":\"10.15625/2615-9783/16442\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Three-dimensional finite difference calculations are proposed to investigate the influence of operation parameters of the shield machines during twin stacked tunnel excavation on the surface settlements. The numerical model is validated by experimental data obtained from Hochiminh’s metro line 1 project, used as a reference case in this study. The parametric study focuses on the influence of the face support pressure, the grouting pressure, and the shield’s length. The numerical results indicated that a decrease does not always follow an increase in surface settlements' face and grouting pressure. A shorter shield machine causes smaller surface settlements to develop over single lower and twin stacked tunnels.\",\"PeriodicalId\":23639,\"journal\":{\"name\":\"VIETNAM JOURNAL OF EARTH SCIENCES\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":2.4000,\"publicationDate\":\"2021-08-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"VIETNAM JOURNAL OF EARTH SCIENCES\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.15625/2615-9783/16442\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"GEOSCIENCES, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"VIETNAM JOURNAL OF EARTH SCIENCES","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.15625/2615-9783/16442","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"GEOSCIENCES, MULTIDISCIPLINARY","Score":null,"Total":0}
A numerical investigation of the impact of shield machine’s operation parameters on the settlements above twin stacked tunnels - A case study of Ho Chi Minh urban railway Line 1
Three-dimensional finite difference calculations are proposed to investigate the influence of operation parameters of the shield machines during twin stacked tunnel excavation on the surface settlements. The numerical model is validated by experimental data obtained from Hochiminh’s metro line 1 project, used as a reference case in this study. The parametric study focuses on the influence of the face support pressure, the grouting pressure, and the shield’s length. The numerical results indicated that a decrease does not always follow an increase in surface settlements' face and grouting pressure. A shorter shield machine causes smaller surface settlements to develop over single lower and twin stacked tunnels.