{"title":"巴勒斯坦建设PPP项目的风险","authors":"","doi":"10.4018/ijisss.296276","DOIUrl":null,"url":null,"abstract":"Many developing nations, such as Palestine, implemented PPP (public-private partnership) to fulfill the increasing needs for public services and facilities. Nonetheless, PPP projects have numerous risks which influence each other and can cause project failures. Unfortunately, current studies related to the PPP risk association have not provided adequate details. This paper tries to fill the literature gap by proposing a practical approach in analyzing the relationship among PPP risks. First, the research identifies risk for PPP projects in the Palestinian construction industry by integrating the interviews and literature review. Next, this study reflects the associations among the risks and reveals the failure instruments of PPP projects using FISM (fuzzy interpretative structural modeling). Besides, this paper uses MICMAC (matrix impact cross-reference multiplication applied to a classification) and FISM method to discover and finalized the 19 crucial risk elements. The MICMAC-FISM approach reckons the fuzzy of the PPP risk association and enhances upon previously published works.","PeriodicalId":54045,"journal":{"name":"International Journal of Information Systems in the Service Sector","volume":" ","pages":""},"PeriodicalIF":0.6000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"The Risks Of Construction PPP Projects in Palestine\",\"authors\":\"\",\"doi\":\"10.4018/ijisss.296276\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Many developing nations, such as Palestine, implemented PPP (public-private partnership) to fulfill the increasing needs for public services and facilities. Nonetheless, PPP projects have numerous risks which influence each other and can cause project failures. Unfortunately, current studies related to the PPP risk association have not provided adequate details. This paper tries to fill the literature gap by proposing a practical approach in analyzing the relationship among PPP risks. First, the research identifies risk for PPP projects in the Palestinian construction industry by integrating the interviews and literature review. Next, this study reflects the associations among the risks and reveals the failure instruments of PPP projects using FISM (fuzzy interpretative structural modeling). Besides, this paper uses MICMAC (matrix impact cross-reference multiplication applied to a classification) and FISM method to discover and finalized the 19 crucial risk elements. The MICMAC-FISM approach reckons the fuzzy of the PPP risk association and enhances upon previously published works.\",\"PeriodicalId\":54045,\"journal\":{\"name\":\"International Journal of Information Systems in the Service Sector\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.6000,\"publicationDate\":\"2022-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Information Systems in the Service Sector\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4018/ijisss.296276\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"COMPUTER SCIENCE, INFORMATION SYSTEMS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Information Systems in the Service Sector","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4018/ijisss.296276","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"COMPUTER SCIENCE, INFORMATION SYSTEMS","Score":null,"Total":0}
The Risks Of Construction PPP Projects in Palestine
Many developing nations, such as Palestine, implemented PPP (public-private partnership) to fulfill the increasing needs for public services and facilities. Nonetheless, PPP projects have numerous risks which influence each other and can cause project failures. Unfortunately, current studies related to the PPP risk association have not provided adequate details. This paper tries to fill the literature gap by proposing a practical approach in analyzing the relationship among PPP risks. First, the research identifies risk for PPP projects in the Palestinian construction industry by integrating the interviews and literature review. Next, this study reflects the associations among the risks and reveals the failure instruments of PPP projects using FISM (fuzzy interpretative structural modeling). Besides, this paper uses MICMAC (matrix impact cross-reference multiplication applied to a classification) and FISM method to discover and finalized the 19 crucial risk elements. The MICMAC-FISM approach reckons the fuzzy of the PPP risk association and enhances upon previously published works.
期刊介绍:
The International Journal of Information Systems in the Service Sector (IJISSS) provides a significant channel for practitioners and researchers (from both public and private areas of the service sector), software developers, and vendors to contribute and circulate ground-breaking work and shape future directions for research. IJISSS assists industrial professionals in applying various advanced information technologies. It explains the relationship between the advancement of the service sector and the evolution of information systems.