{"title":"公路工程延期及工期延长分析","authors":"M. Stoian, M. Dicu","doi":"10.1515/rjti-2017-0060","DOIUrl":null,"url":null,"abstract":"Abstract The implementation of road infrastructure projects often results in delays due to objective causes, with repercussions on the final execution deadline and with value implications. The use of critical path method for planning and the executin windows, will result in better time process management and optimization delays.","PeriodicalId":40630,"journal":{"name":"Romanian Journal of Transport Infrastructure","volume":"6 1","pages":"53 - 60"},"PeriodicalIF":0.1000,"publicationDate":"2017-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Analysis of Delays and Extension of Execution Duration of a Road Project\",\"authors\":\"M. Stoian, M. Dicu\",\"doi\":\"10.1515/rjti-2017-0060\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract The implementation of road infrastructure projects often results in delays due to objective causes, with repercussions on the final execution deadline and with value implications. The use of critical path method for planning and the executin windows, will result in better time process management and optimization delays.\",\"PeriodicalId\":40630,\"journal\":{\"name\":\"Romanian Journal of Transport Infrastructure\",\"volume\":\"6 1\",\"pages\":\"53 - 60\"},\"PeriodicalIF\":0.1000,\"publicationDate\":\"2017-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Romanian Journal of Transport Infrastructure\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1515/rjti-2017-0060\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Romanian Journal of Transport Infrastructure","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1515/rjti-2017-0060","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 1

摘要

摘要由于客观原因,道路基础设施项目的实施往往会导致延误,对最终执行期限产生影响,并产生价值影响。在窗口中使用关键路径方法进行规划和执行,将导致更好的时间过程管理和优化延迟。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis of Delays and Extension of Execution Duration of a Road Project
Abstract The implementation of road infrastructure projects often results in delays due to objective causes, with repercussions on the final execution deadline and with value implications. The use of critical path method for planning and the executin windows, will result in better time process management and optimization delays.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
6
审稿时长
10 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信