{"title":"因承包商原因终止合同而使其无法参与公共采购程序","authors":"Justyna Bójko, Malgorzata Puto","doi":"10.35117/a_eng_20_11_04","DOIUrl":null,"url":null,"abstract":"The article describes obligatory and optional grounds for excluding a contractor on the basis of Polish Public Procurement Law, taking into account the jurisprudence and views of the doctrine. The attention is paid to the optional ground based on art. 24 sec. 5 point 4 of the Polish Act of January 29, 2004, Public Procurement Law, according to which the contracting authority may exclude from the procurement procedure contractors who, for reasons attributable to them, failed to perform or to a significant extent improperly performed a prior public procurement contract or concession contract concluded with the contracting authority, which led to termination or awarding compensation. In order to be able to use the institution, the contracting party must include an appropriate clause in the contract, providing for the possibility of terminating the contract or awarding damages due to contractor’s non- performance or improper performance of the contract, which is a common practice on the Polish public procurement market. However, in the event of such a clause, the contracting authority is obliged to apply it if the condition is met. The article also describes the self- cleaning institution, derived from art. 57 sec. 6 of Directive 2014/24/EU. The self-cleaning procedure can protect the contractor from being excluded from future tenders. However, In order to take advantage of self-cleaning, the contractor has to admit that non-performance or improper performance of the contract is their fault. Keywords: Exclusion; Contractor; Agreement","PeriodicalId":52762,"journal":{"name":"Przeglad Komunikacyjny","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Exclusion of a contractor from participation in a public procurement procedure as a result of contract termination for reasons attributable to them\",\"authors\":\"Justyna Bójko, Malgorzata Puto\",\"doi\":\"10.35117/a_eng_20_11_04\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The article describes obligatory and optional grounds for excluding a contractor on the basis of Polish Public Procurement Law, taking into account the jurisprudence and views of the doctrine. The attention is paid to the optional ground based on art. 24 sec. 5 point 4 of the Polish Act of January 29, 2004, Public Procurement Law, according to which the contracting authority may exclude from the procurement procedure contractors who, for reasons attributable to them, failed to perform or to a significant extent improperly performed a prior public procurement contract or concession contract concluded with the contracting authority, which led to termination or awarding compensation. In order to be able to use the institution, the contracting party must include an appropriate clause in the contract, providing for the possibility of terminating the contract or awarding damages due to contractor’s non- performance or improper performance of the contract, which is a common practice on the Polish public procurement market. However, in the event of such a clause, the contracting authority is obliged to apply it if the condition is met. The article also describes the self- cleaning institution, derived from art. 57 sec. 6 of Directive 2014/24/EU. The self-cleaning procedure can protect the contractor from being excluded from future tenders. However, In order to take advantage of self-cleaning, the contractor has to admit that non-performance or improper performance of the contract is their fault. Keywords: Exclusion; Contractor; Agreement\",\"PeriodicalId\":52762,\"journal\":{\"name\":\"Przeglad Komunikacyjny\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Przeglad Komunikacyjny\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.35117/a_eng_20_11_04\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Przeglad Komunikacyjny","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35117/a_eng_20_11_04","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

该条阐述了根据《波兰公共采购法》排除承包商的强制性和选择性理由,同时考虑到该原则的判例和观点。注意到根据2004年1月29日波兰《公共采购法》第24条第5款第4点的可选理由,根据该法,订约当局可将因其原因,未能履行或在很大程度上不当履行先前与订约当局签订的公共采购合同或特许权合同,导致合同终止或给予赔偿。为了能够使用该机构,缔约方必须在合同中加入适当的条款,规定由于承包商不履行或不当履行合同而终止合同或判给损害赔偿的可能性,这是波兰公共采购市场上的常见做法。但是,在出现这种条款的情况下,如果满足条件,订约当局有义务适用该条款。文章还描述了自清洁机构,衍生自第57条第6节的指令2014/24/EU。自清洁程序可以保护承包商不被排除在未来的投标之外。然而,为了利用自我清洁的优势,承包商必须承认不履行或不适当履行合同是他们的过错。关键词:排除;承包人协定
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Exclusion of a contractor from participation in a public procurement procedure as a result of contract termination for reasons attributable to them
The article describes obligatory and optional grounds for excluding a contractor on the basis of Polish Public Procurement Law, taking into account the jurisprudence and views of the doctrine. The attention is paid to the optional ground based on art. 24 sec. 5 point 4 of the Polish Act of January 29, 2004, Public Procurement Law, according to which the contracting authority may exclude from the procurement procedure contractors who, for reasons attributable to them, failed to perform or to a significant extent improperly performed a prior public procurement contract or concession contract concluded with the contracting authority, which led to termination or awarding compensation. In order to be able to use the institution, the contracting party must include an appropriate clause in the contract, providing for the possibility of terminating the contract or awarding damages due to contractor’s non- performance or improper performance of the contract, which is a common practice on the Polish public procurement market. However, in the event of such a clause, the contracting authority is obliged to apply it if the condition is met. The article also describes the self- cleaning institution, derived from art. 57 sec. 6 of Directive 2014/24/EU. The self-cleaning procedure can protect the contractor from being excluded from future tenders. However, In order to take advantage of self-cleaning, the contractor has to admit that non-performance or improper performance of the contract is their fault. Keywords: Exclusion; Contractor; Agreement
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
5 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信