项目成熟度评估模型专用于工程设计办公室

Olga Ziemińska
{"title":"项目成熟度评估模型专用于工程设计办公室","authors":"Olga Ziemińska","doi":"10.7862/rz.2022.hss.14","DOIUrl":null,"url":null,"abstract":"The parallel implementation of many projects in an organization is a big challenge for Project Managers. While simultaneously managing many projects, it is important to define the dimensions necessary for coordination in order to obtain comprehensive management information regarding both specialized projects and all general project trends implemented across the organization. The lack of comprehensive coordination between the above factors often leads to failure to achieve the assumed results. The aim of the paper is to establish assumptions for criteria to assess the design maturity of an organization. Taking into account the need to analyse the above goal, the author developed the assumptions of the model by assessing the design maturity of the organization on the basis of research carried out in the engineering and design offices.","PeriodicalId":13234,"journal":{"name":"Humanities and social sciences","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"PROJECT MATURITY ASSESSMENT MODEL DEDICATED TO THE ENGINEERING AND DESIGN OFFICE\",\"authors\":\"Olga Ziemińska\",\"doi\":\"10.7862/rz.2022.hss.14\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The parallel implementation of many projects in an organization is a big challenge for Project Managers. While simultaneously managing many projects, it is important to define the dimensions necessary for coordination in order to obtain comprehensive management information regarding both specialized projects and all general project trends implemented across the organization. The lack of comprehensive coordination between the above factors often leads to failure to achieve the assumed results. The aim of the paper is to establish assumptions for criteria to assess the design maturity of an organization. Taking into account the need to analyse the above goal, the author developed the assumptions of the model by assessing the design maturity of the organization on the basis of research carried out in the engineering and design offices.\",\"PeriodicalId\":13234,\"journal\":{\"name\":\"Humanities and social sciences\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-06-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Humanities and social sciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.7862/rz.2022.hss.14\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Humanities and social sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7862/rz.2022.hss.14","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

组织中许多项目的并行实施对项目经理来说是一个巨大的挑战。在同时管理许多项目的同时,重要的是要定义协调所必需的维度,以便获得关于专门项目和整个组织中实施的所有一般项目趋势的综合管理信息。由于上述因素之间缺乏全面的协调,往往无法达到预期的效果。本文的目的是为评估组织的设计成熟度的标准建立假设。考虑到分析上述目标的需要,作者在工程和设计办公室进行研究的基础上,通过评估组织的设计成熟度,提出了模型的假设。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
PROJECT MATURITY ASSESSMENT MODEL DEDICATED TO THE ENGINEERING AND DESIGN OFFICE
The parallel implementation of many projects in an organization is a big challenge for Project Managers. While simultaneously managing many projects, it is important to define the dimensions necessary for coordination in order to obtain comprehensive management information regarding both specialized projects and all general project trends implemented across the organization. The lack of comprehensive coordination between the above factors often leads to failure to achieve the assumed results. The aim of the paper is to establish assumptions for criteria to assess the design maturity of an organization. Taking into account the need to analyse the above goal, the author developed the assumptions of the model by assessing the design maturity of the organization on the basis of research carried out in the engineering and design offices.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
7
审稿时长
25 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信