受不可测量情况影响的生产过程的评价与建模:以金属加工公司为例

IF 0.6 4区 工程技术 Q4 MECHANICS
Mechanika Pub Date : 2022-04-15 DOI:10.5755/j02.mech.29285
Simona Bukantaitė, K. Juzenas
{"title":"受不可测量情况影响的生产过程的评价与建模:以金属加工公司为例","authors":"Simona Bukantaitė, K. Juzenas","doi":"10.5755/j02.mech.29285","DOIUrl":null,"url":null,"abstract":"As the unpredicted situations can occur anytime, the production should be prepared to maintain the same pace as always. The pandemic of 2019 prooved that proper production processes are vital. The case study was made in metal processing company to examine how the workflow has changed after the implementations of virus prevention rules. Welding operation of metal furniture leg was observed and calculations presented – 115 minutes are wasted due to additional daily tasks caused by prevention of the pandemic. The recomendations were described and 160 minutes could be saved in accordance to them. The robotisation of processes and DSS implementation were presented.","PeriodicalId":54741,"journal":{"name":"Mechanika","volume":null,"pages":null},"PeriodicalIF":0.6000,"publicationDate":"2022-04-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Evaluation and Modelling of Production Processes Affected by Unmeasured Situations: Case Study of a Metal Processing Company\",\"authors\":\"Simona Bukantaitė, K. Juzenas\",\"doi\":\"10.5755/j02.mech.29285\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"As the unpredicted situations can occur anytime, the production should be prepared to maintain the same pace as always. The pandemic of 2019 prooved that proper production processes are vital. The case study was made in metal processing company to examine how the workflow has changed after the implementations of virus prevention rules. Welding operation of metal furniture leg was observed and calculations presented – 115 minutes are wasted due to additional daily tasks caused by prevention of the pandemic. The recomendations were described and 160 minutes could be saved in accordance to them. The robotisation of processes and DSS implementation were presented.\",\"PeriodicalId\":54741,\"journal\":{\"name\":\"Mechanika\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.6000,\"publicationDate\":\"2022-04-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Mechanika\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.5755/j02.mech.29285\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"MECHANICS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mechanika","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.5755/j02.mech.29285","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"MECHANICS","Score":null,"Total":0}
引用次数: 0

摘要

由于不可预测的情况随时可能发生,因此生产应准备好保持与往常相同的速度。2019年的大流行证明,适当的生产流程至关重要。本案例研究在金属加工公司进行,以检查在实施病毒防护规则后工作流程发生了哪些变化。观察了金属家具腿的焊接操作,并进行了计算——由于预防大流行病造成的额外日常工作,浪费了115分钟。对建议进行了说明,按照这些建议可以节省160分钟。介绍了流程的自动化和决策支持系统的实现。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Evaluation and Modelling of Production Processes Affected by Unmeasured Situations: Case Study of a Metal Processing Company
As the unpredicted situations can occur anytime, the production should be prepared to maintain the same pace as always. The pandemic of 2019 prooved that proper production processes are vital. The case study was made in metal processing company to examine how the workflow has changed after the implementations of virus prevention rules. Welding operation of metal furniture leg was observed and calculations presented – 115 minutes are wasted due to additional daily tasks caused by prevention of the pandemic. The recomendations were described and 160 minutes could be saved in accordance to them. The robotisation of processes and DSS implementation were presented.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Mechanika
Mechanika 物理-力学
CiteScore
1.30
自引率
0.00%
发文量
50
审稿时长
3 months
期刊介绍: The journal is publishing scientific papers dealing with the following problems: Mechanics of Solid Bodies; Mechanics of Fluids and Gases; Dynamics of Mechanical Systems; Design and Optimization of Mechanical Systems; Mechanical Technologies.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信