{"title":"评估尼日利亚建筑施工中仅使用劳动力采购系统的情况","authors":"O. Akinkunmi, D. Aghimien, O. Awodele","doi":"10.2478/otmcj-2018-0003","DOIUrl":null,"url":null,"abstract":"Abstract Labour-only procurement system is gaining fast popularity among construction clients who want to make savings by procuring materials themselves, leaving the contractor to provide only the labour needed. This study, therefore, appraised this procurement system by assessing its cost performance, its suitability, construction participant’s willingness to use it for subsequent projects and its merits and demerits. Using a survey design approach through the use of questionnaire and a pro forma, data were gathered from a total of 98 construction professionals and contractors who have been involved in the use of this procurement system. Analyses of data were done using percentage, mean item score, Mann–Whitney U test and paired samples t-test. The study revealed that this procurement system is best for procuring residential buildings and minor alteration works. Construction participants who have used this system before are willing to still use it for subsequent works, as it delivers projects within budget and discourages short-changing of specifications and standard by contractors. However, the need for the time commitment and reduction in contractor’s profit are its major disadvantages. For its cost performance, an overall cost saving of about 2% was discovered for the assessed 32 projects. The findings of this study will be beneficial to various interest groups such as clients and estate developers in selecting the right procurement option to use.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"10 1","pages":"1719 - 1726"},"PeriodicalIF":1.6000,"publicationDate":"2018-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Appraising the use of labour-only procurement system for building construction in Nigeria\",\"authors\":\"O. Akinkunmi, D. Aghimien, O. Awodele\",\"doi\":\"10.2478/otmcj-2018-0003\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Labour-only procurement system is gaining fast popularity among construction clients who want to make savings by procuring materials themselves, leaving the contractor to provide only the labour needed. This study, therefore, appraised this procurement system by assessing its cost performance, its suitability, construction participant’s willingness to use it for subsequent projects and its merits and demerits. Using a survey design approach through the use of questionnaire and a pro forma, data were gathered from a total of 98 construction professionals and contractors who have been involved in the use of this procurement system. Analyses of data were done using percentage, mean item score, Mann–Whitney U test and paired samples t-test. The study revealed that this procurement system is best for procuring residential buildings and minor alteration works. Construction participants who have used this system before are willing to still use it for subsequent works, as it delivers projects within budget and discourages short-changing of specifications and standard by contractors. However, the need for the time commitment and reduction in contractor’s profit are its major disadvantages. For its cost performance, an overall cost saving of about 2% was discovered for the assessed 32 projects. The findings of this study will be beneficial to various interest groups such as clients and estate developers in selecting the right procurement option to use.\",\"PeriodicalId\":42309,\"journal\":{\"name\":\"Organization Technology and Management in Construction\",\"volume\":\"10 1\",\"pages\":\"1719 - 1726\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2018-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Organization Technology and Management in Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/otmcj-2018-0003\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Organization Technology and Management in Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/otmcj-2018-0003","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 5

摘要

摘要仅限劳动力的采购系统在建筑客户中迅速流行起来,他们希望通过自己采购材料来节省开支,让承包商只提供所需的劳动力。因此,本研究通过评估该采购系统的性价比、适用性、施工参与者在后续项目中使用该系统的意愿及其优缺点来评估该系统。采用调查设计方法,通过使用问卷和形式,从参与使用该采购系统的总共98名建筑专业人员和承包商那里收集了数据。使用百分比、平均项目得分、Mann-Whitney U检验和配对样本t检验对数据进行分析。研究显示,这种采购制度最适合采购住宅和小型改建工程。以前使用过该系统的施工参与者仍愿意在后续工程中使用该系统,因为它在预算范围内交付项目,不鼓励承包商短期更改规范和标准。然而,需要时间承诺和减少承包商的利润是其主要缺点。就其性价比而言,在评估的32个项目中,发现总体成本节省了约2%。这项研究的结果将有利于客户和房地产开发商等各种利益集团选择正确的采购方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Appraising the use of labour-only procurement system for building construction in Nigeria
Abstract Labour-only procurement system is gaining fast popularity among construction clients who want to make savings by procuring materials themselves, leaving the contractor to provide only the labour needed. This study, therefore, appraised this procurement system by assessing its cost performance, its suitability, construction participant’s willingness to use it for subsequent projects and its merits and demerits. Using a survey design approach through the use of questionnaire and a pro forma, data were gathered from a total of 98 construction professionals and contractors who have been involved in the use of this procurement system. Analyses of data were done using percentage, mean item score, Mann–Whitney U test and paired samples t-test. The study revealed that this procurement system is best for procuring residential buildings and minor alteration works. Construction participants who have used this system before are willing to still use it for subsequent works, as it delivers projects within budget and discourages short-changing of specifications and standard by contractors. However, the need for the time commitment and reduction in contractor’s profit are its major disadvantages. For its cost performance, an overall cost saving of about 2% was discovered for the assessed 32 projects. The findings of this study will be beneficial to various interest groups such as clients and estate developers in selecting the right procurement option to use.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.10
自引率
0.00%
发文量
8
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信