{"title":"Turdas隧道的设计与施工","authors":"F. Nica, T. Iftimie","doi":"10.2478/rjti-2019-0010","DOIUrl":null,"url":null,"abstract":"Abstract The paper presents aspects of the design and execution of the Turdas tunnel located on the local variant (route), on the Coşlariu - Simeria section, from the rehabilitation project of Brasov – Simeria railway line, component part of Pan European Railway Corridor IV, for train circulation with maximum speed of 160km/h. The tunnel crosses through alluvial deposits with silt and clay with locally sand layers at the upper part, sand and gravel with water in the middle part and marly silty clay and neogenic marl, with swelling phenomena, at the lower part. The overburden is between 2.00m and 13.00m. The initial project provided execution in underground, on 510.00m in the central area and from surface at both ends, 225.00m at the entrance and 45.00m at the exit. The new optimized project, based on new geological and geotechnical studies, proposed an execution from surface for the entire length of the tunnel. To establish the optimal solution two methods of surface execution and structural solutions were analyzed comparatively: “Cut and Cover” and “Cover and Cut”. The adopted method was “Cut and Cover”, with a structural solution composed of a temporary retaining structure – diaphragm walls with a special internal lining. This has been divided in six sections with different behavioral types, taking into account the ground configuration in longitudinal profile and the geological and geotechnical data. The technological execution phases are presented in detail. To investigate the behavior of this type of structure under soil and swelling actions, three-dimensional finite element analyses were carried out, taking into account the execution phases for each cross section. A monitoring system was provided to verify the stresses in the temporary retaining structure and the internal lining and also to calibrate future calculations.","PeriodicalId":40630,"journal":{"name":"Romanian Journal of Transport Infrastructure","volume":"8 1","pages":"44 - 57"},"PeriodicalIF":0.1000,"publicationDate":"2019-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Design and Execution of Turdas Tunnel\",\"authors\":\"F. Nica, T. Iftimie\",\"doi\":\"10.2478/rjti-2019-0010\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract The paper presents aspects of the design and execution of the Turdas tunnel located on the local variant (route), on the Coşlariu - Simeria section, from the rehabilitation project of Brasov – Simeria railway line, component part of Pan European Railway Corridor IV, for train circulation with maximum speed of 160km/h. The tunnel crosses through alluvial deposits with silt and clay with locally sand layers at the upper part, sand and gravel with water in the middle part and marly silty clay and neogenic marl, with swelling phenomena, at the lower part. The overburden is between 2.00m and 13.00m. The initial project provided execution in underground, on 510.00m in the central area and from surface at both ends, 225.00m at the entrance and 45.00m at the exit. The new optimized project, based on new geological and geotechnical studies, proposed an execution from surface for the entire length of the tunnel. To establish the optimal solution two methods of surface execution and structural solutions were analyzed comparatively: “Cut and Cover” and “Cover and Cut”. The adopted method was “Cut and Cover”, with a structural solution composed of a temporary retaining structure – diaphragm walls with a special internal lining. This has been divided in six sections with different behavioral types, taking into account the ground configuration in longitudinal profile and the geological and geotechnical data. The technological execution phases are presented in detail. To investigate the behavior of this type of structure under soil and swelling actions, three-dimensional finite element analyses were carried out, taking into account the execution phases for each cross section. A monitoring system was provided to verify the stresses in the temporary retaining structure and the internal lining and also to calibrate future calculations.\",\"PeriodicalId\":40630,\"journal\":{\"name\":\"Romanian Journal of Transport Infrastructure\",\"volume\":\"8 1\",\"pages\":\"44 - 57\"},\"PeriodicalIF\":0.1000,\"publicationDate\":\"2019-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Romanian Journal of Transport Infrastructure\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/rjti-2019-0010\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Romanian Journal of Transport Infrastructure","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/rjti-2019-0010","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

摘要

摘要本文介绍了位于Coşlariu-Simeria段的当地变体(路线)上的Turdas隧道的设计和实施方面,该隧道来自Brasov–Simeria铁路线的修复项目,该铁路线是泛欧铁路走廊IV的组成部分,用于最高速度为160km/h的列车循环。隧道穿越冲积层,上部为粉土和粘土,局部为砂层,中部为含水砂砾石,下部为泥灰岩粉质粘土和新生泥灰岩,有膨胀现象。覆盖层在2.00m到13.00m之间。最初的项目在地下进行,在中心区域510.00m,两端从地表开始,在入口225.00m,在出口45.00m。新的优化项目基于新的地质和岩土工程研究,建议在整个隧道长度上从地表执行。为了建立最优解,比较分析了表面执行和结构解的两种方法:“切割和覆盖”和“覆盖和切割”。所采用的方法是“开挖和覆盖”,结构解决方案由临时挡土结构——带特殊内衬的地下连续墙组成。考虑到纵向剖面中的地面配置以及地质和岩土数据,将其分为六个具有不同行为类型的部分。详细介绍了技术执行阶段。为了研究这种类型的结构在土壤和膨胀作用下的行为,进行了三维有限元分析,考虑了每个横截面的执行阶段。提供了一个监测系统来验证临时挡土结构和内衬中的应力,并校准未来的计算。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Design and Execution of Turdas Tunnel
Abstract The paper presents aspects of the design and execution of the Turdas tunnel located on the local variant (route), on the Coşlariu - Simeria section, from the rehabilitation project of Brasov – Simeria railway line, component part of Pan European Railway Corridor IV, for train circulation with maximum speed of 160km/h. The tunnel crosses through alluvial deposits with silt and clay with locally sand layers at the upper part, sand and gravel with water in the middle part and marly silty clay and neogenic marl, with swelling phenomena, at the lower part. The overburden is between 2.00m and 13.00m. The initial project provided execution in underground, on 510.00m in the central area and from surface at both ends, 225.00m at the entrance and 45.00m at the exit. The new optimized project, based on new geological and geotechnical studies, proposed an execution from surface for the entire length of the tunnel. To establish the optimal solution two methods of surface execution and structural solutions were analyzed comparatively: “Cut and Cover” and “Cover and Cut”. The adopted method was “Cut and Cover”, with a structural solution composed of a temporary retaining structure – diaphragm walls with a special internal lining. This has been divided in six sections with different behavioral types, taking into account the ground configuration in longitudinal profile and the geological and geotechnical data. The technological execution phases are presented in detail. To investigate the behavior of this type of structure under soil and swelling actions, three-dimensional finite element analyses were carried out, taking into account the execution phases for each cross section. A monitoring system was provided to verify the stresses in the temporary retaining structure and the internal lining and also to calibrate future calculations.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
6
审稿时长
10 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信