高路堤下组合式混凝土涵洞的路堤填土荷载

IF 1.5 Q4 ELECTROCHEMISTRY
Q. Ma, Chaogang Huang, Heng-lin Xiao, Zhi Chen
{"title":"高路堤下组合式混凝土涵洞的路堤填土荷载","authors":"Q. Ma, Chaogang Huang, Heng-lin Xiao, Zhi Chen","doi":"10.1155/2018/9870673","DOIUrl":null,"url":null,"abstract":"A culvert with prefabricated and assembled structural components is introduced to speed up the progress of highway construction in China. In order to clear the behavior of the prefabricated and assembled slab culvert, the center line section and the shoulder section of the embankment are selected for field tests. In the tests, the distribution and the growth of the earth pressures on the top slab and the lateral walls and the displacements and the deformations of the top slab and lateral walls are investigated, thereafter, the tested earth pressures are linearly fitted, and the formulas of fitting lines are obtained. The results show that the deflections of the lateral walls and of the cover slab are very small, and the variation of distribution and growth of the earth pressures presents significantly nonlinear characters, which is totally different from the linear earth pressure theory proposed by the current Chinese code. The vertical pressure is much smaller in the middle part of the top slab than that on both ends, and it is much larger than the linear theory results. The distribution curve of the lateral earth pressures on the lateral walls is approximately “3” in shape, and the maximum earth pressure locates at the junction of the cap and the lateral wall. The formula of the fitted line obtained from the primary stage pressure can be employed to estimate the earth pressure of embankment completion. The results of the field tests can provide references for the calculations of the components and the strength in the junctions of the assembled culverts.","PeriodicalId":13893,"journal":{"name":"International Journal of Corrosion","volume":" ","pages":""},"PeriodicalIF":1.5000,"publicationDate":"2018-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1155/2018/9870673","citationCount":"3","resultStr":"{\"title\":\"Embankment Filling Loads on an Assembled Concrete Culvert beneath High Embankment\",\"authors\":\"Q. Ma, Chaogang Huang, Heng-lin Xiao, Zhi Chen\",\"doi\":\"10.1155/2018/9870673\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A culvert with prefabricated and assembled structural components is introduced to speed up the progress of highway construction in China. In order to clear the behavior of the prefabricated and assembled slab culvert, the center line section and the shoulder section of the embankment are selected for field tests. In the tests, the distribution and the growth of the earth pressures on the top slab and the lateral walls and the displacements and the deformations of the top slab and lateral walls are investigated, thereafter, the tested earth pressures are linearly fitted, and the formulas of fitting lines are obtained. The results show that the deflections of the lateral walls and of the cover slab are very small, and the variation of distribution and growth of the earth pressures presents significantly nonlinear characters, which is totally different from the linear earth pressure theory proposed by the current Chinese code. The vertical pressure is much smaller in the middle part of the top slab than that on both ends, and it is much larger than the linear theory results. The distribution curve of the lateral earth pressures on the lateral walls is approximately “3” in shape, and the maximum earth pressure locates at the junction of the cap and the lateral wall. The formula of the fitted line obtained from the primary stage pressure can be employed to estimate the earth pressure of embankment completion. The results of the field tests can provide references for the calculations of the components and the strength in the junctions of the assembled culverts.\",\"PeriodicalId\":13893,\"journal\":{\"name\":\"International Journal of Corrosion\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":1.5000,\"publicationDate\":\"2018-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1155/2018/9870673\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Corrosion\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1155/2018/9870673\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ELECTROCHEMISTRY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Corrosion","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1155/2018/9870673","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ELECTROCHEMISTRY","Score":null,"Total":0}
引用次数: 3

摘要

为了加快我国公路建设的步伐,介绍了一种预制拼装结构涵洞。为了明确预制和组装盖板涵的性能,选择路堤的中心线段和路肩段进行现场试验。在试验中,研究了顶板和侧墙土压力的分布和增长,以及顶板和侧壁的位移和变形,然后对试验土压力进行了线性拟合,得到了拟合线的公式。结果表明,边墙和盖板的挠度很小,土压力的分布和增长变化具有明显的非线性特征,这与现行规范提出的线性土压力理论完全不同。顶板中部的竖向压力远小于两端的竖向压力,且远大于线性理论结果。侧墙上的侧向土压力分布曲线形状约为“3”,最大土压力位于承台与侧墙的交界处。根据一级压力得到的拟合线公式可用于估算路堤完工的土压力。现场试验结果可为组装涵洞连接处的构件和强度计算提供参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Embankment Filling Loads on an Assembled Concrete Culvert beneath High Embankment
A culvert with prefabricated and assembled structural components is introduced to speed up the progress of highway construction in China. In order to clear the behavior of the prefabricated and assembled slab culvert, the center line section and the shoulder section of the embankment are selected for field tests. In the tests, the distribution and the growth of the earth pressures on the top slab and the lateral walls and the displacements and the deformations of the top slab and lateral walls are investigated, thereafter, the tested earth pressures are linearly fitted, and the formulas of fitting lines are obtained. The results show that the deflections of the lateral walls and of the cover slab are very small, and the variation of distribution and growth of the earth pressures presents significantly nonlinear characters, which is totally different from the linear earth pressure theory proposed by the current Chinese code. The vertical pressure is much smaller in the middle part of the top slab than that on both ends, and it is much larger than the linear theory results. The distribution curve of the lateral earth pressures on the lateral walls is approximately “3” in shape, and the maximum earth pressure locates at the junction of the cap and the lateral wall. The formula of the fitted line obtained from the primary stage pressure can be employed to estimate the earth pressure of embankment completion. The results of the field tests can provide references for the calculations of the components and the strength in the junctions of the assembled culverts.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
5.70
自引率
0.00%
发文量
8
审稿时长
14 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信