PIK研究堆投入兆瓦功率运行

Q4 Physics and Astronomy
V. Voronin, A. V. Gartvik, S. Gavrilov, S. Grigoriev, M. Diachkov, D. A. Ipatov, V. Matveev, V. Tarnavich, V. Syromyatnikov, A. O. Polushkin, K. A. Pshenichnyi, V. Ulyanov, V. Zinoviev
{"title":"PIK研究堆投入兆瓦功率运行","authors":"V. Voronin, A. V. Gartvik, S. Gavrilov, S. Grigoriev, M. Diachkov, D. A. Ipatov, V. Matveev, V. Tarnavich, V. Syromyatnikov, A. O. Polushkin, K. A. Pshenichnyi, V. Ulyanov, V. Zinoviev","doi":"10.1080/10448632.2022.2126716","DOIUrl":null,"url":null,"abstract":"Abstract High-flux research reactor PIK has reached megawatt power. The reactor is undergoing the commissioning process divided into several stages, and it reached the power of 7 MW in March 2022. The reactor is designed to operate on extracted neutron beams, accommodating the first five neutron stations, which have already been used in test experiments. The value of the thermal neutron flux at the output of the PIK reactor’s Horizontal Experimental Channel No.10 (HEC-10) was measured by two independent methods. During the course of the reactor reaching 7 MW power, the integral neutron flux on the extracted neutron beam was measured. The spectrum of the extracted neutron beam is measured and presented.","PeriodicalId":39014,"journal":{"name":"Neutron News","volume":"33 1","pages":"13 - 16"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"PIK Research Reactor Put into Megawatt-Power Operation\",\"authors\":\"V. Voronin, A. V. Gartvik, S. Gavrilov, S. Grigoriev, M. Diachkov, D. A. Ipatov, V. Matveev, V. Tarnavich, V. Syromyatnikov, A. O. Polushkin, K. A. Pshenichnyi, V. Ulyanov, V. Zinoviev\",\"doi\":\"10.1080/10448632.2022.2126716\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract High-flux research reactor PIK has reached megawatt power. The reactor is undergoing the commissioning process divided into several stages, and it reached the power of 7 MW in March 2022. The reactor is designed to operate on extracted neutron beams, accommodating the first five neutron stations, which have already been used in test experiments. The value of the thermal neutron flux at the output of the PIK reactor’s Horizontal Experimental Channel No.10 (HEC-10) was measured by two independent methods. During the course of the reactor reaching 7 MW power, the integral neutron flux on the extracted neutron beam was measured. The spectrum of the extracted neutron beam is measured and presented.\",\"PeriodicalId\":39014,\"journal\":{\"name\":\"Neutron News\",\"volume\":\"33 1\",\"pages\":\"13 - 16\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-10-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Neutron News\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/10448632.2022.2126716\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Physics and Astronomy\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Neutron News","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/10448632.2022.2126716","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Physics and Astronomy","Score":null,"Total":0}
引用次数: 0

摘要

高通量研究堆PIK功率已达到兆瓦级。该反应堆正在进行分几个阶段的调试过程,并于2022年3月达到7兆瓦的功率。该反应堆被设计为在提取的中子束上运行,可容纳首批五个中子站,这些中子站已经用于测试实验。采用两种独立的方法测量了PIK反应堆水平实验通道10号(HEC-10)输出处的热中子通量值。在反应堆达到7 MW功率的过程中,测量了提取中子束上的积分中子通量。对提取的中子束的光谱进行了测量并给出了谱图。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
PIK Research Reactor Put into Megawatt-Power Operation
Abstract High-flux research reactor PIK has reached megawatt power. The reactor is undergoing the commissioning process divided into several stages, and it reached the power of 7 MW in March 2022. The reactor is designed to operate on extracted neutron beams, accommodating the first five neutron stations, which have already been used in test experiments. The value of the thermal neutron flux at the output of the PIK reactor’s Horizontal Experimental Channel No.10 (HEC-10) was measured by two independent methods. During the course of the reactor reaching 7 MW power, the integral neutron flux on the extracted neutron beam was measured. The spectrum of the extracted neutron beam is measured and presented.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Neutron News
Neutron News Physics and Astronomy-Nuclear and High Energy Physics
CiteScore
0.30
自引率
0.00%
发文量
36
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信