尼日利亚教学医院的公私伙伴关系:潜力和挑战

IF 0.1 Q4 RADIOLOGY, NUCLEAR MEDICINE & MEDICAL IMAGING
F. Jinadu, A. Agunloye, A. Adeyomoye, Abiola O. Adekoya, G. Obajimi
{"title":"尼日利亚教学医院的公私伙伴关系:潜力和挑战","authors":"F. Jinadu, A. Agunloye, A. Adeyomoye, Abiola O. Adekoya, G. Obajimi","doi":"10.4103/wajr.wajr_28_19","DOIUrl":null,"url":null,"abstract":"Background: Public–private partnership (PPP) has become a popular model used by public sector organizations that are usually under-funded by their respective governments to render services in fulfillment of their egalitarian responsibilities and goals. Lately, the health sector has been a recipient of such initiatives and the trend is growing. However, the successful delivery of services to patients is sometimes hampered because of difficulties encountered in both the development and interpretation of clauses contained in agreements including Memoranda of Understanding between the parties. The anticipated outcomes and impact often remain elusive due to the tensions encountered during implementation. Aim and Objective: The aim of this study was to determine the current operational status as well as explore potential benefits and challenges of the use of the PPP model in radiology departments of selected teaching hospitals within three South-Western States of Nigeria (Lagos, Ogun, and Oyo). It is hoped that the study findings would provide useful data needed for improvement of the PPP model as it is being currently practiced. Materials and Methods: This was a qualitative study in which 138 closed- and open-ended questionnaires were administered to all cadres of staff in radiology departments of the selected hospitals teaching hospitals within three South-Western States of Nigeria (Lagos, Ogun, and Oyo). Results: There was a 100% response from the participants. The age range of the participants was 25–65 years. Study findings showed that almost all radiological equipment can be acquired through PPP. There was improved service delivery and residency training with PPP. Jurisdictional conflict was the greatest challenge. Conclusion: PPP is a viable option that should be encouraged by government for the purchase of equipment in hospitals.","PeriodicalId":29875,"journal":{"name":"West African Journal of Radiology","volume":null,"pages":null},"PeriodicalIF":0.1000,"publicationDate":"2020-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Public–private partnerships in Nigerian teaching hospitals: Potential and challenges\",\"authors\":\"F. Jinadu, A. Agunloye, A. Adeyomoye, Abiola O. Adekoya, G. Obajimi\",\"doi\":\"10.4103/wajr.wajr_28_19\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Background: Public–private partnership (PPP) has become a popular model used by public sector organizations that are usually under-funded by their respective governments to render services in fulfillment of their egalitarian responsibilities and goals. Lately, the health sector has been a recipient of such initiatives and the trend is growing. However, the successful delivery of services to patients is sometimes hampered because of difficulties encountered in both the development and interpretation of clauses contained in agreements including Memoranda of Understanding between the parties. The anticipated outcomes and impact often remain elusive due to the tensions encountered during implementation. Aim and Objective: The aim of this study was to determine the current operational status as well as explore potential benefits and challenges of the use of the PPP model in radiology departments of selected teaching hospitals within three South-Western States of Nigeria (Lagos, Ogun, and Oyo). It is hoped that the study findings would provide useful data needed for improvement of the PPP model as it is being currently practiced. Materials and Methods: This was a qualitative study in which 138 closed- and open-ended questionnaires were administered to all cadres of staff in radiology departments of the selected hospitals teaching hospitals within three South-Western States of Nigeria (Lagos, Ogun, and Oyo). Results: There was a 100% response from the participants. The age range of the participants was 25–65 years. Study findings showed that almost all radiological equipment can be acquired through PPP. There was improved service delivery and residency training with PPP. Jurisdictional conflict was the greatest challenge. Conclusion: PPP is a viable option that should be encouraged by government for the purchase of equipment in hospitals.\",\"PeriodicalId\":29875,\"journal\":{\"name\":\"West African Journal of Radiology\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.1000,\"publicationDate\":\"2020-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"West African Journal of Radiology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4103/wajr.wajr_28_19\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"RADIOLOGY, NUCLEAR MEDICINE & MEDICAL IMAGING\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"West African Journal of Radiology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4103/wajr.wajr_28_19","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"RADIOLOGY, NUCLEAR MEDICINE & MEDICAL IMAGING","Score":null,"Total":0}
引用次数: 1

摘要

背景:公私伙伴关系(PPP)已经成为公共部门组织使用的一种流行模式,这些组织通常在各自政府的资金不足的情况下提供服务,以履行其平等主义的责任和目标。最近,卫生部门已成为此类倡议的接受者,而且这种趋势正在增长。然而,由于各方之间的谅解备忘录等协议所载条款的制定和解释遇到困难,向病人成功提供服务有时受到阻碍。由于执行过程中遇到的紧张局势,预期的结果和影响往往难以捉摸。目的和目的:本研究的目的是确定目前的运营状况,并探讨在尼日利亚西南三个州(拉各斯、奥贡和奥约)选定的教学医院放射科使用PPP模式的潜在好处和挑战。希望研究结果能够为改进PPP模式提供有用的数据,因为它目前正在实践中。材料和方法:这是一项定性研究,其中向尼日利亚西南三个州(拉各斯、奥贡和奥约)选定的教学医院放射科的所有干部发放了138份封闭式和开放式问卷。结果:参与者的满意率为100%。参与者的年龄范围为25-65岁。研究结果显示,几乎所有的放射设备都可以通过PPP方式获得。PPP改善了服务提供和住院医师培训。管辖权冲突是最大的挑战。结论:PPP模式是一种可行的医院设备采购模式,应得到政府的鼓励。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Public–private partnerships in Nigerian teaching hospitals: Potential and challenges
Background: Public–private partnership (PPP) has become a popular model used by public sector organizations that are usually under-funded by their respective governments to render services in fulfillment of their egalitarian responsibilities and goals. Lately, the health sector has been a recipient of such initiatives and the trend is growing. However, the successful delivery of services to patients is sometimes hampered because of difficulties encountered in both the development and interpretation of clauses contained in agreements including Memoranda of Understanding between the parties. The anticipated outcomes and impact often remain elusive due to the tensions encountered during implementation. Aim and Objective: The aim of this study was to determine the current operational status as well as explore potential benefits and challenges of the use of the PPP model in radiology departments of selected teaching hospitals within three South-Western States of Nigeria (Lagos, Ogun, and Oyo). It is hoped that the study findings would provide useful data needed for improvement of the PPP model as it is being currently practiced. Materials and Methods: This was a qualitative study in which 138 closed- and open-ended questionnaires were administered to all cadres of staff in radiology departments of the selected hospitals teaching hospitals within three South-Western States of Nigeria (Lagos, Ogun, and Oyo). Results: There was a 100% response from the participants. The age range of the participants was 25–65 years. Study findings showed that almost all radiological equipment can be acquired through PPP. There was improved service delivery and residency training with PPP. Jurisdictional conflict was the greatest challenge. Conclusion: PPP is a viable option that should be encouraged by government for the purchase of equipment in hospitals.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
West African Journal of Radiology
West African Journal of Radiology RADIOLOGY, NUCLEAR MEDICINE & MEDICAL IMAGING-
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信