{"title":"砖墙工程设计实施对劳动生产率的提高","authors":"F. Santos, Livia B. Agostinho, L. Araújo, L. A. Aidar, Ana Beatriz Souza Piña, M. Carvalho","doi":"10.2478/jeppm-2020-0022","DOIUrl":null,"url":null,"abstract":"Abstract This paper aims to quantify the labor productivity improvement reached by the implementation of a masonry wall project design to guide field construction. A masonry wall project design is an instrument of rationalization, developed to specify the layout and steps of a masonry walls execution. The methodology is of quantitative nature and involves a practical case. The work of an enterprise in Goiânia (Brazil) was tracked by the collection of productivity data, firstly of a crew that didn’t have access to a masonry wall project design, and then of a crew that had access to the project. The evaluation of the productivity improvement was processed by means of statistical analysis, such as location and dispersion measures, average and variance, T-test, and F-value. Hypothesis tests were also performed to prove that the changes in productivity were caused by the implementation of the masonry project. The results showed that the project deployment optimized the production process in the field. There was a 26% increase in the team average productivity with access to the project design according to the hypothesis tests. The main contribution of this work is to present the beneficial impact of a masonry wall project design tailored for field construction, which allows a formal and rational approach to a heavily artisanal technique.","PeriodicalId":53274,"journal":{"name":"Journal of Engineering Project and Production Management","volume":"10 1","pages":"200 - 210"},"PeriodicalIF":0.0000,"publicationDate":"2020-06-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Labor Productivity Improvement Obtained by Masonry Walls Project Design Implementation\",\"authors\":\"F. Santos, Livia B. Agostinho, L. Araújo, L. A. Aidar, Ana Beatriz Souza Piña, M. Carvalho\",\"doi\":\"10.2478/jeppm-2020-0022\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract This paper aims to quantify the labor productivity improvement reached by the implementation of a masonry wall project design to guide field construction. A masonry wall project design is an instrument of rationalization, developed to specify the layout and steps of a masonry walls execution. The methodology is of quantitative nature and involves a practical case. The work of an enterprise in Goiânia (Brazil) was tracked by the collection of productivity data, firstly of a crew that didn’t have access to a masonry wall project design, and then of a crew that had access to the project. The evaluation of the productivity improvement was processed by means of statistical analysis, such as location and dispersion measures, average and variance, T-test, and F-value. Hypothesis tests were also performed to prove that the changes in productivity were caused by the implementation of the masonry project. The results showed that the project deployment optimized the production process in the field. There was a 26% increase in the team average productivity with access to the project design according to the hypothesis tests. The main contribution of this work is to present the beneficial impact of a masonry wall project design tailored for field construction, which allows a formal and rational approach to a heavily artisanal technique.\",\"PeriodicalId\":53274,\"journal\":{\"name\":\"Journal of Engineering Project and Production Management\",\"volume\":\"10 1\",\"pages\":\"200 - 210\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-06-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering Project and Production Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/jeppm-2020-0022\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Business, Management and Accounting\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Project and Production Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/jeppm-2020-0022","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Business, Management and Accounting","Score":null,"Total":0}
引用次数: 1

摘要

摘要本文旨在量化某砌体墙体工程设计实施后劳动生产率的提高,以指导现场施工。砌体墙工程设计是一种合理化的工具,用于指定砌体墙施工的布局和步骤。该方法是定量的,并涉及一个实际案例。goi尼亚(巴西)的一家企业的工作是通过收集生产力数据来跟踪的,首先是一个没有接触过砖石墙项目设计的团队,然后是一个接触过项目的团队。采用区位与离散测度、平均与方差、t检验、f值等统计分析方法对生产率改进进行评价。还进行了假设检验,以证明生产力的变化是由砌体工程的实施引起的。结果表明,项目部署优化了该油田的生产流程。根据假设检验,通过访问项目设计,团队的平均生产力提高了26%。这项工作的主要贡献是展示了为现场施工量身定制的砖石墙项目设计的有益影响,它允许正式和合理的方法来处理大量的手工技术。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Labor Productivity Improvement Obtained by Masonry Walls Project Design Implementation
Abstract This paper aims to quantify the labor productivity improvement reached by the implementation of a masonry wall project design to guide field construction. A masonry wall project design is an instrument of rationalization, developed to specify the layout and steps of a masonry walls execution. The methodology is of quantitative nature and involves a practical case. The work of an enterprise in Goiânia (Brazil) was tracked by the collection of productivity data, firstly of a crew that didn’t have access to a masonry wall project design, and then of a crew that had access to the project. The evaluation of the productivity improvement was processed by means of statistical analysis, such as location and dispersion measures, average and variance, T-test, and F-value. Hypothesis tests were also performed to prove that the changes in productivity were caused by the implementation of the masonry project. The results showed that the project deployment optimized the production process in the field. There was a 26% increase in the team average productivity with access to the project design according to the hypothesis tests. The main contribution of this work is to present the beneficial impact of a masonry wall project design tailored for field construction, which allows a formal and rational approach to a heavily artisanal technique.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Engineering Project and Production Management
Journal of Engineering Project and Production Management Business, Management and Accounting-Business, Management and Accounting (miscellaneous)
CiteScore
2.30
自引率
0.00%
发文量
24
审稿时长
30 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信