评估建设项目早期阶段项目管理对质量的影响

IF 1.6 Q3 MANAGEMENT
Žanesa Ljevo, M. Vukomanović, Suada Džebo
{"title":"评估建设项目早期阶段项目管理对质量的影响","authors":"Žanesa Ljevo, M. Vukomanović, Suada Džebo","doi":"10.1515/otmcj-2016-0029","DOIUrl":null,"url":null,"abstract":"Abstract Although the quality of a process affects the quality of the end product, there is currently an insignificant amount of knowledge about the quality of project management (PM) processes that directly affect the quality of the delivered product (constructed building). This study presents a proposal for modeling the impact of the quality of the PM process on the quality of the constructed building. The quality of the PM process is represented by the main quality factors and product quality indicators. It presents the results of the interviews that were conducted and study cases that were analyzed in Bosnia and Herzegovina with a variety of project participants (with different managerial perspectives) in terms of the indicators of quality of the delivered product. All participants, regardless of managerial perspective, believe that the most important indicator of the quality of products for each phase of the project is “customer satisfaction in the end phase”, the measurement of which is different for each project phase that is presented. The results of the factor analysis of the definition and the planning phases show that 11 variables, namely, the quality factors of the PM process, can be grouped into three new factors, which is described as 66.61% (77.046%) of the basic set of variables.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"9 1","pages":"1584 - 1592"},"PeriodicalIF":1.6000,"publicationDate":"2017-12-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1515/otmcj-2016-0029","citationCount":"2","resultStr":"{\"title\":\"Assessing the influence of project management on quality during the early phases of construction projects\",\"authors\":\"Žanesa Ljevo, M. Vukomanović, Suada Džebo\",\"doi\":\"10.1515/otmcj-2016-0029\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Although the quality of a process affects the quality of the end product, there is currently an insignificant amount of knowledge about the quality of project management (PM) processes that directly affect the quality of the delivered product (constructed building). This study presents a proposal for modeling the impact of the quality of the PM process on the quality of the constructed building. The quality of the PM process is represented by the main quality factors and product quality indicators. It presents the results of the interviews that were conducted and study cases that were analyzed in Bosnia and Herzegovina with a variety of project participants (with different managerial perspectives) in terms of the indicators of quality of the delivered product. All participants, regardless of managerial perspective, believe that the most important indicator of the quality of products for each phase of the project is “customer satisfaction in the end phase”, the measurement of which is different for each project phase that is presented. The results of the factor analysis of the definition and the planning phases show that 11 variables, namely, the quality factors of the PM process, can be grouped into three new factors, which is described as 66.61% (77.046%) of the basic set of variables.\",\"PeriodicalId\":42309,\"journal\":{\"name\":\"Organization Technology and Management in Construction\",\"volume\":\"9 1\",\"pages\":\"1584 - 1592\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2017-12-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1515/otmcj-2016-0029\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Organization Technology and Management in Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1515/otmcj-2016-0029\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Organization Technology and Management in Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1515/otmcj-2016-0029","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 2

摘要

摘要尽管过程的质量会影响最终产品的质量,但目前对直接影响交付产品(已建成建筑)质量的项目管理(PM)过程的质量知之甚少。本研究提出了一个建模PM过程质量对建筑质量影响的建议。PM过程的质量由主要质量因素和产品质量指标来表示。它介绍了在波斯尼亚和黑塞哥维那就交付产品的质量指标对各种项目参与者(具有不同管理视角)进行的访谈和研究案例的结果。所有参与者,无论从管理角度来看,都认为项目每个阶段的产品质量最重要的指标是“最终阶段的客户满意度”,对每个项目阶段的衡量标准不同。定义和规划阶段的因素分析结果表明,PM过程的质量因素这11个变量可以分为三个新的因素,占基本变量集的66.61%(77.046%)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Assessing the influence of project management on quality during the early phases of construction projects
Abstract Although the quality of a process affects the quality of the end product, there is currently an insignificant amount of knowledge about the quality of project management (PM) processes that directly affect the quality of the delivered product (constructed building). This study presents a proposal for modeling the impact of the quality of the PM process on the quality of the constructed building. The quality of the PM process is represented by the main quality factors and product quality indicators. It presents the results of the interviews that were conducted and study cases that were analyzed in Bosnia and Herzegovina with a variety of project participants (with different managerial perspectives) in terms of the indicators of quality of the delivered product. All participants, regardless of managerial perspective, believe that the most important indicator of the quality of products for each phase of the project is “customer satisfaction in the end phase”, the measurement of which is different for each project phase that is presented. The results of the factor analysis of the definition and the planning phases show that 11 variables, namely, the quality factors of the PM process, can be grouped into three new factors, which is described as 66.61% (77.046%) of the basic set of variables.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.10
自引率
0.00%
发文量
8
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信