{"title":"基于GIS模型的土耳其Buyuk-Menderes盆地理论水力潜力调查","authors":"C. Koç, Yıldırım Bayazıt, Selami Yurdan Özgül","doi":"10.1080/14786451.2022.2147525","DOIUrl":null,"url":null,"abstract":"ABSTRACT In this study, using a Geographical Information System (GIS) based model method, locations having theoretical hydroelectric energy potential were identified in the Buyuk Menderes basin, one of Turkey's largest basins. According to the installed power potential on the examined basin, 33 sites below 10 MW, 57 sites between 10 and 50 MW, 4 sites between 50 and 100 MW, and 1 site over 100 MW were found as a consequence of the study. While the theoretical hydroelectric energy potential in the whole basin is 886.55 MW at 70% turbine efficiency, the installed power in the basin is currently 302.02 MW. According to these results, only 34.07% of the total hydro potential in the basin is used today.","PeriodicalId":14406,"journal":{"name":"International Journal of Sustainable Energy","volume":"41 1","pages":"2185 - 2196"},"PeriodicalIF":2.0000,"publicationDate":"2022-11-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Investigation of theoretical hydroelectric potential with GIS-based model in Buyuk Menderes Basin, Turkey\",\"authors\":\"C. Koç, Yıldırım Bayazıt, Selami Yurdan Özgül\",\"doi\":\"10.1080/14786451.2022.2147525\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT In this study, using a Geographical Information System (GIS) based model method, locations having theoretical hydroelectric energy potential were identified in the Buyuk Menderes basin, one of Turkey's largest basins. According to the installed power potential on the examined basin, 33 sites below 10 MW, 57 sites between 10 and 50 MW, 4 sites between 50 and 100 MW, and 1 site over 100 MW were found as a consequence of the study. While the theoretical hydroelectric energy potential in the whole basin is 886.55 MW at 70% turbine efficiency, the installed power in the basin is currently 302.02 MW. According to these results, only 34.07% of the total hydro potential in the basin is used today.\",\"PeriodicalId\":14406,\"journal\":{\"name\":\"International Journal of Sustainable Energy\",\"volume\":\"41 1\",\"pages\":\"2185 - 2196\"},\"PeriodicalIF\":2.0000,\"publicationDate\":\"2022-11-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Sustainable Energy\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/14786451.2022.2147525\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENERGY & FUELS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Sustainable Energy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/14786451.2022.2147525","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
Investigation of theoretical hydroelectric potential with GIS-based model in Buyuk Menderes Basin, Turkey
ABSTRACT In this study, using a Geographical Information System (GIS) based model method, locations having theoretical hydroelectric energy potential were identified in the Buyuk Menderes basin, one of Turkey's largest basins. According to the installed power potential on the examined basin, 33 sites below 10 MW, 57 sites between 10 and 50 MW, 4 sites between 50 and 100 MW, and 1 site over 100 MW were found as a consequence of the study. While the theoretical hydroelectric energy potential in the whole basin is 886.55 MW at 70% turbine efficiency, the installed power in the basin is currently 302.02 MW. According to these results, only 34.07% of the total hydro potential in the basin is used today.
期刊介绍:
Engineering and sustainable development are intrinsically linked. All capital plant and every consumable product depends on an engineering input through design, manufacture and operation, if not for the product itself then for the equipment required to process and transport the raw materials and the final product. Many aspects of sustainable development depend directly on appropriate and timely actions by engineers. Engineering is an extended process of analysis, synthesis, evaluation and execution and, therefore, it is argued that engineers must be involved from the outset of any proposal to develop sustainable solutions. Engineering embraces many disciplines and truly sustainable solutions are usually inter-disciplinary in nature.