Liangliang Liu, Hongmei Yao, Yanmei Huang, Y. Song
{"title":"基于BIM的城市轨道交通施工数据关联管理研究","authors":"Liangliang Liu, Hongmei Yao, Yanmei Huang, Y. Song","doi":"10.56748/ejse.233611","DOIUrl":null,"url":null,"abstract":"With the continuous expansion of the scale of urban rail transit construction projects, it is difficult to improve the coordination in construction and the relevance of construction data. In order to solve the problem of data association in construction, an urban rail transit construction data association management system oriented to BIM Technology is proposed. BIM is used to build a dynamic workflow collaboration architecture to manage the data in urban rail transit construction, so as to realize construction collaborative scheduling. In the test and analysis of the system, the comprehensive ability test of the system shows that the minimum response time of the system can be reduced to 1.2 ms. At the same time, the system has ideal visualization effect and obvious practical value in practical application. Therefore, the urban rail transit construction data association management system based on BIM can show ideal results in complex construction environment, which is of great significance to China's urban construction.","PeriodicalId":52513,"journal":{"name":"Electronic Journal of Structural Engineering","volume":"1 1","pages":""},"PeriodicalIF":0.8000,"publicationDate":"2023-01-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research on construction data association management of Urban Rail Transit Based on BIM\",\"authors\":\"Liangliang Liu, Hongmei Yao, Yanmei Huang, Y. Song\",\"doi\":\"10.56748/ejse.233611\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"With the continuous expansion of the scale of urban rail transit construction projects, it is difficult to improve the coordination in construction and the relevance of construction data. In order to solve the problem of data association in construction, an urban rail transit construction data association management system oriented to BIM Technology is proposed. BIM is used to build a dynamic workflow collaboration architecture to manage the data in urban rail transit construction, so as to realize construction collaborative scheduling. In the test and analysis of the system, the comprehensive ability test of the system shows that the minimum response time of the system can be reduced to 1.2 ms. At the same time, the system has ideal visualization effect and obvious practical value in practical application. Therefore, the urban rail transit construction data association management system based on BIM can show ideal results in complex construction environment, which is of great significance to China's urban construction.\",\"PeriodicalId\":52513,\"journal\":{\"name\":\"Electronic Journal of Structural Engineering\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.8000,\"publicationDate\":\"2023-01-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Electronic Journal of Structural Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.56748/ejse.233611\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Electronic Journal of Structural Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.56748/ejse.233611","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
Research on construction data association management of Urban Rail Transit Based on BIM
With the continuous expansion of the scale of urban rail transit construction projects, it is difficult to improve the coordination in construction and the relevance of construction data. In order to solve the problem of data association in construction, an urban rail transit construction data association management system oriented to BIM Technology is proposed. BIM is used to build a dynamic workflow collaboration architecture to manage the data in urban rail transit construction, so as to realize construction collaborative scheduling. In the test and analysis of the system, the comprehensive ability test of the system shows that the minimum response time of the system can be reduced to 1.2 ms. At the same time, the system has ideal visualization effect and obvious practical value in practical application. Therefore, the urban rail transit construction data association management system based on BIM can show ideal results in complex construction environment, which is of great significance to China's urban construction.
期刊介绍:
The Electronic Journal of Structural Engineering (EJSE) is an international forum for the dissemination and discussion of leading edge research and practical applications in Structural Engineering. It comprises peer-reviewed technical papers, discussions and comments, and also news about conferences, workshops etc. in Structural Engineering. Original papers are invited from individuals involved in the field of structural engineering and construction. The areas of special interests include the following, but are not limited to: Analytical and design methods Bridges and High-rise Buildings Case studies and failure investigation Innovations in design and new technology New Construction Materials Performance of Structures Prefabrication Technology Repairs, Strengthening, and Maintenance Stability and Scaffolding Engineering Soil-structure interaction Standards and Codes of Practice Structural and solid mechanics Structural Safety and Reliability Testing Technologies Vibration, impact and structural dynamics Wind and earthquake engineering. EJSE is seeking original papers (research or state-of the art reviews) of the highest quality for consideration for publication. The papers will be published within 3 to 6 months. The papers are expected to make a significant contribution to the research and development activities of the academic and professional engineering community.