L. Trujillo, Federico Inchausti-Sintes, Javier Campos, C. Manrique-de-Lara-Peñate
{"title":"解释PPP交通项目的成功与失败:计量经济学方法","authors":"L. Trujillo, Federico Inchausti-Sintes, Javier Campos, C. Manrique-de-Lara-Peñate","doi":"10.18757/EJTIR.2018.18.4.3266","DOIUrl":null,"url":null,"abstract":"There are a multitude of factors, both internal and external, that may affect the development and success of any transport project. ‘Success’ is both context-dependent and quite difficult to measure. This paper distinguishes between four types of ‘success’ variables: (lack of) cost overruns; (lack of) time delays; (ex-post) level of traffic; and (generated) revenues. Each variable is modeled in a binary way (using discrete choice models), with each model estimating the relevance of various explanatory factors on the probability of success. Internal factors are found to have the greatest effect on that probability, and PPP projects seem to be prone to budget overruns and delays. Governance factors, such as the tender process, renegotiations, and issues related to penalties, among others, can all produce complications. Since the public authority has control over most of these variables, these results could be used to improve the ‘success’ of these projects.","PeriodicalId":46721,"journal":{"name":"European Journal of Transport and Infrastructure Research","volume":"205 ","pages":""},"PeriodicalIF":2.1000,"publicationDate":"2018-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Explaining success and failures in PPP transport projects: an econometric approach\",\"authors\":\"L. Trujillo, Federico Inchausti-Sintes, Javier Campos, C. Manrique-de-Lara-Peñate\",\"doi\":\"10.18757/EJTIR.2018.18.4.3266\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"There are a multitude of factors, both internal and external, that may affect the development and success of any transport project. ‘Success’ is both context-dependent and quite difficult to measure. This paper distinguishes between four types of ‘success’ variables: (lack of) cost overruns; (lack of) time delays; (ex-post) level of traffic; and (generated) revenues. Each variable is modeled in a binary way (using discrete choice models), with each model estimating the relevance of various explanatory factors on the probability of success. Internal factors are found to have the greatest effect on that probability, and PPP projects seem to be prone to budget overruns and delays. Governance factors, such as the tender process, renegotiations, and issues related to penalties, among others, can all produce complications. Since the public authority has control over most of these variables, these results could be used to improve the ‘success’ of these projects.\",\"PeriodicalId\":46721,\"journal\":{\"name\":\"European Journal of Transport and Infrastructure Research\",\"volume\":\"205 \",\"pages\":\"\"},\"PeriodicalIF\":2.1000,\"publicationDate\":\"2018-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"European Journal of Transport and Infrastructure Research\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.18757/EJTIR.2018.18.4.3266\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"TRANSPORTATION\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Journal of Transport and Infrastructure Research","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.18757/EJTIR.2018.18.4.3266","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"TRANSPORTATION","Score":null,"Total":0}
Explaining success and failures in PPP transport projects: an econometric approach
There are a multitude of factors, both internal and external, that may affect the development and success of any transport project. ‘Success’ is both context-dependent and quite difficult to measure. This paper distinguishes between four types of ‘success’ variables: (lack of) cost overruns; (lack of) time delays; (ex-post) level of traffic; and (generated) revenues. Each variable is modeled in a binary way (using discrete choice models), with each model estimating the relevance of various explanatory factors on the probability of success. Internal factors are found to have the greatest effect on that probability, and PPP projects seem to be prone to budget overruns and delays. Governance factors, such as the tender process, renegotiations, and issues related to penalties, among others, can all produce complications. Since the public authority has control over most of these variables, these results could be used to improve the ‘success’ of these projects.
期刊介绍:
The European Journal of Transport and Infrastructure Research (EJTIR) is a peer-reviewed scholarly journal, freely accessible through the internet. EJTIR aims to present the results of high-quality scientific research to a readership of academics, practitioners and policy-makers. It is our ambition to be the journal of choice in the field of transport and infrastructure both for readers and authors. To achieve this ambition, EJTIR distinguishes itself from other journals in its field, both through its scope and the way it is published.