预测Al-Ghanim Sahara运输的总运输和清关时间

IF 0.6 Q4 STATISTICS & PROBABILITY
Ahmed Bani‐Mustafa, Sondos Abuorf, Raghdah AL-Jumlah, Manar Al-Mutair, Hajar Kattan, Hajar AL-Muzaiel, A. Mazari, Abdulwahed Khalfan, Najmuddin S. Patwa
{"title":"预测Al-Ghanim Sahara运输的总运输和清关时间","authors":"Ahmed Bani‐Mustafa, Sondos Abuorf, Raghdah AL-Jumlah, Manar Al-Mutair, Hajar Kattan, Hajar AL-Muzaiel, A. Mazari, Abdulwahed Khalfan, Najmuddin S. Patwa","doi":"10.1285/i20705948v11n2p405","DOIUrl":null,"url":null,"abstract":"Understanding factors that affect lead time can help supply chain management to get better understanding for the amount of time it takes to deliver products to the market. This investigation sought to determine factors that influenced lead time shipment at Al-Ghanim Sahra Transportation (AST). The delivery lead time data was collected from AST over four years (2013 – 2016). The information consists of customers’ orders starting from the actual time of shipments until clearance date over several stages of shipment. A multivariate fixed and random regression models were employed using stepwise variable selections to identify significant independent factors; including their interaction to lead time. Supp, Commodities, Departure Port and Shipping line along with their interaction were significant shipping-related contributors to lead time explaining 38.7% of the total variation in lead time.","PeriodicalId":44770,"journal":{"name":"Electronic Journal of Applied Statistical Analysis","volume":"182 5","pages":"405-426"},"PeriodicalIF":0.6000,"publicationDate":"2018-10-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Predicting Total Shipping and Clearance Time for Al-Ghanim Sahara Transportation\",\"authors\":\"Ahmed Bani‐Mustafa, Sondos Abuorf, Raghdah AL-Jumlah, Manar Al-Mutair, Hajar Kattan, Hajar AL-Muzaiel, A. Mazari, Abdulwahed Khalfan, Najmuddin S. Patwa\",\"doi\":\"10.1285/i20705948v11n2p405\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Understanding factors that affect lead time can help supply chain management to get better understanding for the amount of time it takes to deliver products to the market. This investigation sought to determine factors that influenced lead time shipment at Al-Ghanim Sahra Transportation (AST). The delivery lead time data was collected from AST over four years (2013 – 2016). The information consists of customers’ orders starting from the actual time of shipments until clearance date over several stages of shipment. A multivariate fixed and random regression models were employed using stepwise variable selections to identify significant independent factors; including their interaction to lead time. Supp, Commodities, Departure Port and Shipping line along with their interaction were significant shipping-related contributors to lead time explaining 38.7% of the total variation in lead time.\",\"PeriodicalId\":44770,\"journal\":{\"name\":\"Electronic Journal of Applied Statistical Analysis\",\"volume\":\"182 5\",\"pages\":\"405-426\"},\"PeriodicalIF\":0.6000,\"publicationDate\":\"2018-10-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Electronic Journal of Applied Statistical Analysis\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1285/i20705948v11n2p405\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"STATISTICS & PROBABILITY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Electronic Journal of Applied Statistical Analysis","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1285/i20705948v11n2p405","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"STATISTICS & PROBABILITY","Score":null,"Total":0}
引用次数: 3

摘要

了解影响交付周期的因素可以帮助供应链管理更好地了解将产品交付到市场所需的时间。本次调查旨在确定影响Al-Ghanim Sahra运输公司(AST)交付周期装运的因素。交付交付周期数据是从AST收集的,历时四年(2013-2016)。该信息由客户的订单组成,从实际发货时间开始,直到发货的几个阶段的清关日期。采用多变量固定和随机回归模型,使用逐步变量选择来识别显著的独立因素;包括他们对交付周期的互动。Supp、Commodities、Department Port和Shipping line及其相互作用是交付周期的重要航运相关因素,解释了交付周期总变化的38.7%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Predicting Total Shipping and Clearance Time for Al-Ghanim Sahara Transportation
Understanding factors that affect lead time can help supply chain management to get better understanding for the amount of time it takes to deliver products to the market. This investigation sought to determine factors that influenced lead time shipment at Al-Ghanim Sahra Transportation (AST). The delivery lead time data was collected from AST over four years (2013 – 2016). The information consists of customers’ orders starting from the actual time of shipments until clearance date over several stages of shipment. A multivariate fixed and random regression models were employed using stepwise variable selections to identify significant independent factors; including their interaction to lead time. Supp, Commodities, Departure Port and Shipping line along with their interaction were significant shipping-related contributors to lead time explaining 38.7% of the total variation in lead time.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.40
自引率
14.30%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信