{"title":"动力反应堆运行前环境调查。","authors":"G H WHIPPLE","doi":"10.1080/00968205709343514","DOIUrl":null,"url":null,"abstract":"Abstract The operation of a reactor plant presents the possibility that radioactive material may be released in sufficient amounts to increase the levels of radioactivity in the surrounding environment. If an increase over pre-existing levels is to be observed, it is necessary to know what these background levels are before the plant goes into operation. The pre-operational environmental survey is carried out to determine these levels. The scope of such a survey, the sensitivity limits and the requirements they impose on methods and instruments are discussed.","PeriodicalId":85939,"journal":{"name":"American Industrial Hygiene Association quarterly","volume":"18 4","pages":"315-8"},"PeriodicalIF":0.0000,"publicationDate":"1957-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1080/00968205709343514","citationCount":"1","resultStr":"{\"title\":\"Pre-operational environmental survey for a power reactor.\",\"authors\":\"G H WHIPPLE\",\"doi\":\"10.1080/00968205709343514\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract The operation of a reactor plant presents the possibility that radioactive material may be released in sufficient amounts to increase the levels of radioactivity in the surrounding environment. If an increase over pre-existing levels is to be observed, it is necessary to know what these background levels are before the plant goes into operation. The pre-operational environmental survey is carried out to determine these levels. The scope of such a survey, the sensitivity limits and the requirements they impose on methods and instruments are discussed.\",\"PeriodicalId\":85939,\"journal\":{\"name\":\"American Industrial Hygiene Association quarterly\",\"volume\":\"18 4\",\"pages\":\"315-8\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1957-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1080/00968205709343514\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"American Industrial Hygiene Association quarterly\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/00968205709343514\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"American Industrial Hygiene Association quarterly","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/00968205709343514","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Pre-operational environmental survey for a power reactor.
Abstract The operation of a reactor plant presents the possibility that radioactive material may be released in sufficient amounts to increase the levels of radioactivity in the surrounding environment. If an increase over pre-existing levels is to be observed, it is necessary to know what these background levels are before the plant goes into operation. The pre-operational environmental survey is carried out to determine these levels. The scope of such a survey, the sensitivity limits and the requirements they impose on methods and instruments are discussed.