北米德尔塞克斯医院的能源管理装置。

Hospital engineering Pub Date : 1986-05-01
V A Hart
{"title":"北米德尔塞克斯医院的能源管理装置。","authors":"V A Hart","doi":"","DOIUrl":null,"url":null,"abstract":"<p><p>The author is the Energy Conservation Officer for the Haringey Health Authority. The North Middlesex Hospital is an acute unit with approximately 700 beds. Currently, twenty-one outstations control the maternity/radio therapy tower complex plus the outpatients' department. Plans have been approved to extend the system and Phase 2 will cover pathology, administration, medical and surgical blocks together with x-ray and casualty blocks. Transmitton Ltd, as in Phase 1, will supply the hardware and contract management.</p>","PeriodicalId":79975,"journal":{"name":"Hospital engineering","volume":"40 5","pages":"4-5"},"PeriodicalIF":0.0000,"publicationDate":"1986-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Energy management installation at North Middlesex Hospital.\",\"authors\":\"V A Hart\",\"doi\":\"\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p><p>The author is the Energy Conservation Officer for the Haringey Health Authority. The North Middlesex Hospital is an acute unit with approximately 700 beds. Currently, twenty-one outstations control the maternity/radio therapy tower complex plus the outpatients' department. Plans have been approved to extend the system and Phase 2 will cover pathology, administration, medical and surgical blocks together with x-ray and casualty blocks. Transmitton Ltd, as in Phase 1, will supply the hardware and contract management.</p>\",\"PeriodicalId\":79975,\"journal\":{\"name\":\"Hospital engineering\",\"volume\":\"40 5\",\"pages\":\"4-5\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1986-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Hospital engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Hospital engineering","FirstCategoryId":"1085","ListUrlMain":"","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

作者是哈林盖卫生局的节能官员。北米德尔塞克斯医院是一个急症病房,大约有700张病床。目前,21个分站控制着产科/放射治疗塔综合大楼和门诊部。已经批准了扩展该系统的计划,第二阶段将涵盖病理、行政、医疗和外科部门以及x光和伤员部门。在第一阶段,Transmitton Ltd将提供硬件和合同管理。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Energy management installation at North Middlesex Hospital.

The author is the Energy Conservation Officer for the Haringey Health Authority. The North Middlesex Hospital is an acute unit with approximately 700 beds. Currently, twenty-one outstations control the maternity/radio therapy tower complex plus the outpatients' department. Plans have been approved to extend the system and Phase 2 will cover pathology, administration, medical and surgical blocks together with x-ray and casualty blocks. Transmitton Ltd, as in Phase 1, will supply the hardware and contract management.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信