管理医院应急电源测试项目。

D L Stymiest
{"title":"管理医院应急电源测试项目。","authors":"D L Stymiest","doi":"","DOIUrl":null,"url":null,"abstract":"<p><p>All hospitals must have an emergency power testing program that includes generator load testing and emergency power supply system maintenance. This document examines a management program that uses lessons learned from an emergency power testing program to improve the hospital's facilities and training.</p>","PeriodicalId":79949,"journal":{"name":"Healthcare facilities management series","volume":" ","pages":"1-16"},"PeriodicalIF":0.0000,"publicationDate":"1997-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Managing hospital emergency power testing programs.\",\"authors\":\"D L Stymiest\",\"doi\":\"\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p><p>All hospitals must have an emergency power testing program that includes generator load testing and emergency power supply system maintenance. This document examines a management program that uses lessons learned from an emergency power testing program to improve the hospital's facilities and training.</p>\",\"PeriodicalId\":79949,\"journal\":{\"name\":\"Healthcare facilities management series\",\"volume\":\" \",\"pages\":\"1-16\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1997-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Healthcare facilities management series\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Healthcare facilities management series","FirstCategoryId":"1085","ListUrlMain":"","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

所有医院必须有应急电源测试程序,包括发电机负载测试和应急电源系统维护。本文件考察了一个管理程序,该程序利用从紧急电源测试程序中吸取的经验教训来改进医院的设施和培训。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Managing hospital emergency power testing programs.

All hospitals must have an emergency power testing program that includes generator load testing and emergency power supply system maintenance. This document examines a management program that uses lessons learned from an emergency power testing program to improve the hospital's facilities and training.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信