医院发电机的尺寸,测试和测试。

H O Nash
{"title":"医院发电机的尺寸,测试和测试。","authors":"H O Nash","doi":"","DOIUrl":null,"url":null,"abstract":"<p><p>With the NFPA 99 and JCAHO requirements for minimum loads on generators during testing, hospital engineers are finding that oversized standby generators can mean operational problems. This document explains the oversized generator problem, including the code changes that gave birth to the problem. Some practical suggestions for sizing generators are then provided.</p>","PeriodicalId":79949,"journal":{"name":"Healthcare facilities management series","volume":" ","pages":"1-7"},"PeriodicalIF":0.0000,"publicationDate":"1994-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Hospital generator sizing, testing, and exercising.\",\"authors\":\"H O Nash\",\"doi\":\"\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p><p>With the NFPA 99 and JCAHO requirements for minimum loads on generators during testing, hospital engineers are finding that oversized standby generators can mean operational problems. This document explains the oversized generator problem, including the code changes that gave birth to the problem. Some practical suggestions for sizing generators are then provided.</p>\",\"PeriodicalId\":79949,\"journal\":{\"name\":\"Healthcare facilities management series\",\"volume\":\" \",\"pages\":\"1-7\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1994-02-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Healthcare facilities management series\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Healthcare facilities management series","FirstCategoryId":"1085","ListUrlMain":"","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

根据NFPA 99和JCAHO对测试期间发电机最小负载的要求,医院工程师发现超大的备用发电机可能意味着操作问题。本文档解释了过大的生成器问题,包括导致该问题的代码更改。然后提供了一些确定生成器大小的实用建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Hospital generator sizing, testing, and exercising.

With the NFPA 99 and JCAHO requirements for minimum loads on generators during testing, hospital engineers are finding that oversized standby generators can mean operational problems. This document explains the oversized generator problem, including the code changes that gave birth to the problem. Some practical suggestions for sizing generators are then provided.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信