{"title":"过渡到基于单元的质量保证方法:一个成功实施策略的描述。","authors":"M Thomter","doi":"","DOIUrl":null,"url":null,"abstract":"<p><p>In 1987 the decision was taken by the Nursing Executive at Princess Margaret Hospital for Children to substitute the centralized approach to quality assurance (QA) with a unit-based system. The strategies used to ensure the successful implementation of the new system are discussed--together with the pitfalls encountered during the transition phase.</p>","PeriodicalId":77019,"journal":{"name":"Australian clinical review","volume":"13 3","pages":"111-7"},"PeriodicalIF":0.0000,"publicationDate":"1993-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Transition to a unit-based quality assurance approach: a description of one successful implementation strategy.\",\"authors\":\"M Thomter\",\"doi\":\"\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p><p>In 1987 the decision was taken by the Nursing Executive at Princess Margaret Hospital for Children to substitute the centralized approach to quality assurance (QA) with a unit-based system. The strategies used to ensure the successful implementation of the new system are discussed--together with the pitfalls encountered during the transition phase.</p>\",\"PeriodicalId\":77019,\"journal\":{\"name\":\"Australian clinical review\",\"volume\":\"13 3\",\"pages\":\"111-7\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1993-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Australian clinical review\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Australian clinical review","FirstCategoryId":"1085","ListUrlMain":"","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Transition to a unit-based quality assurance approach: a description of one successful implementation strategy.
In 1987 the decision was taken by the Nursing Executive at Princess Margaret Hospital for Children to substitute the centralized approach to quality assurance (QA) with a unit-based system. The strategies used to ensure the successful implementation of the new system are discussed--together with the pitfalls encountered during the transition phase.