{"title":"Research on the Design and Construction Process of National Indoor General Stadium for Tokyo Olympics","authors":"Saikaku Toyokawa","doi":"10.1002/2475-8876.70017","DOIUrl":null,"url":null,"abstract":"<p>This study clarified the following three points regarding the National Indoor General Stadium for the Tokyo Olympics: (1) By organizing the official meeting schedule and construction process chart, the symbol zones were discussed at several meetings, and the construction of the symbol zone was done simultaneously with multiple constructions. (2) Using official minutes and publications, the development process of the festival square was visually organized. (3) Various collaborative designs were created for the festival square. Tange understood the limitations of time and budget and successfully crystallized the ideas of the participating members.</p>","PeriodicalId":42793,"journal":{"name":"Japan Architectural Review","volume":"8 1","pages":""},"PeriodicalIF":0.8000,"publicationDate":"2025-03-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1002/2475-8876.70017","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Japan Architectural Review","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1002/2475-8876.70017","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"0","JCRName":"ARCHITECTURE","Score":null,"Total":0}
Research on the Design and Construction Process of National Indoor General Stadium for Tokyo Olympics
This study clarified the following three points regarding the National Indoor General Stadium for the Tokyo Olympics: (1) By organizing the official meeting schedule and construction process chart, the symbol zones were discussed at several meetings, and the construction of the symbol zone was done simultaneously with multiple constructions. (2) Using official minutes and publications, the development process of the festival square was visually organized. (3) Various collaborative designs were created for the festival square. Tange understood the limitations of time and budget and successfully crystallized the ideas of the participating members.