关于对研发和生产能力投资的补贴

IF 6 2区 管理学 Q1 OPERATIONS RESEARCH & MANAGEMENT SCIENCE
Martijn W. Ketelaars, Peter M. Kort
{"title":"关于对研发和生产能力投资的补贴","authors":"Martijn W. Ketelaars, Peter M. Kort","doi":"10.1016/j.ejor.2024.10.021","DOIUrl":null,"url":null,"abstract":"This article considers a sequential investment project which starts with a product innovation phase, and subsequently, once R&D is completed, a production phase. The investment decisions are the timing and size of the R&D investment, and the size of the production capacity. We show that from a social welfare perspective the firm starts the R&D project too late and installs a too low production capacity. We find that subsidization of the R&D investment is more effective in reducing this welfare loss than subsidization of the production capacity. In fact, we reach the same conclusion under both isoelastic and linear demand.","PeriodicalId":55161,"journal":{"name":"European Journal of Operational Research","volume":"19 1","pages":""},"PeriodicalIF":6.0000,"publicationDate":"2024-10-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"On subsidization of investments in R&D and production capacity\",\"authors\":\"Martijn W. Ketelaars, Peter M. Kort\",\"doi\":\"10.1016/j.ejor.2024.10.021\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This article considers a sequential investment project which starts with a product innovation phase, and subsequently, once R&D is completed, a production phase. The investment decisions are the timing and size of the R&D investment, and the size of the production capacity. We show that from a social welfare perspective the firm starts the R&D project too late and installs a too low production capacity. We find that subsidization of the R&D investment is more effective in reducing this welfare loss than subsidization of the production capacity. In fact, we reach the same conclusion under both isoelastic and linear demand.\",\"PeriodicalId\":55161,\"journal\":{\"name\":\"European Journal of Operational Research\",\"volume\":\"19 1\",\"pages\":\"\"},\"PeriodicalIF\":6.0000,\"publicationDate\":\"2024-10-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"European Journal of Operational Research\",\"FirstCategoryId\":\"91\",\"ListUrlMain\":\"https://doi.org/10.1016/j.ejor.2024.10.021\",\"RegionNum\":2,\"RegionCategory\":\"管理学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"OPERATIONS RESEARCH & MANAGEMENT SCIENCE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Journal of Operational Research","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1016/j.ejor.2024.10.021","RegionNum":2,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"OPERATIONS RESEARCH & MANAGEMENT SCIENCE","Score":null,"Total":0}
引用次数: 0

摘要

本文考虑的是一个连续投资项目,该项目从产品创新阶段开始,在研发完成后进入生产阶段。投资决策包括研发投资的时间和规模,以及生产能力的规模。我们的研究表明,从社会福利的角度来看,企业启动研发项目的时间过晚,产能过低。我们发现,补贴研发投资比补贴生产能力更能有效减少这种福利损失。事实上,我们在等弹性需求和线性需求下都得出了相同的结论。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
On subsidization of investments in R&D and production capacity
This article considers a sequential investment project which starts with a product innovation phase, and subsequently, once R&D is completed, a production phase. The investment decisions are the timing and size of the R&D investment, and the size of the production capacity. We show that from a social welfare perspective the firm starts the R&D project too late and installs a too low production capacity. We find that subsidization of the R&D investment is more effective in reducing this welfare loss than subsidization of the production capacity. In fact, we reach the same conclusion under both isoelastic and linear demand.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
European Journal of Operational Research
European Journal of Operational Research 管理科学-运筹学与管理科学
CiteScore
11.90
自引率
9.40%
发文量
786
审稿时长
8.2 months
期刊介绍: The European Journal of Operational Research (EJOR) publishes high quality, original papers that contribute to the methodology of operational research (OR) and to the practice of decision making.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信