国际热核聚变实验堆再次出现长达十年的延误

IF 0.5 4区 物理与天体物理 Q4 PHYSICS, MULTIDISCIPLINARY
Michael Banks
{"title":"国际热核聚变实验堆再次出现长达十年的延误","authors":"Michael Banks","doi":"10.1088/2058-7058/37/08/08","DOIUrl":null,"url":null,"abstract":"The ITER fusion reactor will now cost €5bn more and not reach full operation with deuterium and tritium until 2039, as Michael Banks explains.","PeriodicalId":54613,"journal":{"name":"Physics World","volume":null,"pages":null},"PeriodicalIF":0.5000,"publicationDate":"2024-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ITER hit by new decade-long delay\",\"authors\":\"Michael Banks\",\"doi\":\"10.1088/2058-7058/37/08/08\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The ITER fusion reactor will now cost €5bn more and not reach full operation with deuterium and tritium until 2039, as Michael Banks explains.\",\"PeriodicalId\":54613,\"journal\":{\"name\":\"Physics World\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.5000,\"publicationDate\":\"2024-07-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Physics World\",\"FirstCategoryId\":\"101\",\"ListUrlMain\":\"https://doi.org/10.1088/2058-7058/37/08/08\",\"RegionNum\":4,\"RegionCategory\":\"物理与天体物理\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"PHYSICS, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Physics World","FirstCategoryId":"101","ListUrlMain":"https://doi.org/10.1088/2058-7058/37/08/08","RegionNum":4,"RegionCategory":"物理与天体物理","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"PHYSICS, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

摘要

正如迈克尔-班克斯(Michael Banks)所解释的那样,ITER 核聚变反应堆现在的造价将增加 50 亿欧元,而且要到 2039 年才能实现氘和氚的全面运行。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ITER hit by new decade-long delay
The ITER fusion reactor will now cost €5bn more and not reach full operation with deuterium and tritium until 2039, as Michael Banks explains.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Physics World
Physics World 物理-物理:综合
CiteScore
0.30
自引率
0.00%
发文量
273
审稿时长
>12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信