粒状流冲刷坑下游拦水坝的实验和数值研究

IF 1.8 4区 工程技术 Q3 ENGINEERING, CIVIL
Yunyun Fan, Huixian Wang, Fang Zhang
{"title":"粒状流冲刷坑下游拦水坝的实验和数值研究","authors":"Yunyun Fan, Huixian Wang, Fang Zhang","doi":"10.1007/s40999-024-01005-9","DOIUrl":null,"url":null,"abstract":"<p>In this study, experimental and numerical investigation were conducted on scour pits of granular flow downstream. Firstly, the flow flume experiment studied the influence of the material mass from the source area, the initial location of the material, the height of the check dam, and the length of the entrainment area. In the experiment a wedge was used to simulate the check dam. Then a numerical research of typical experiment processes was carried out using the discrete element method. The experiment results show that apparent entrainment only occurs under specific conditions of high initial energy, low wedge height, and small length of entrainment area. Based on the numerical verification, the numerical results obtained by the discrete element method were used for analysis, which show that the formation of the scour pit undergoes three main sub-stages, including downstream impact entrainment at the initial sub-stage, retrospective scraper entrainment toward the upstream at the middle sub-stage, and shear deformation zone formation in the entrainment area by friction and pushing at the later sub-stage. The damage caused by shear deformation in the entrainment area deserves special attention, as this area is difficult to observe directly. However, it can influence the stability of scour pits and surrounding structures. The results of this study may provide the basis for further research on the scour pits.</p>","PeriodicalId":50331,"journal":{"name":"International Journal of Civil Engineering","volume":"106 1","pages":""},"PeriodicalIF":1.8000,"publicationDate":"2024-08-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Experimental and Numerical Investigation on Scour Pits of Granular Flow Downstream Check Dam\",\"authors\":\"Yunyun Fan, Huixian Wang, Fang Zhang\",\"doi\":\"10.1007/s40999-024-01005-9\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>In this study, experimental and numerical investigation were conducted on scour pits of granular flow downstream. Firstly, the flow flume experiment studied the influence of the material mass from the source area, the initial location of the material, the height of the check dam, and the length of the entrainment area. In the experiment a wedge was used to simulate the check dam. Then a numerical research of typical experiment processes was carried out using the discrete element method. The experiment results show that apparent entrainment only occurs under specific conditions of high initial energy, low wedge height, and small length of entrainment area. Based on the numerical verification, the numerical results obtained by the discrete element method were used for analysis, which show that the formation of the scour pit undergoes three main sub-stages, including downstream impact entrainment at the initial sub-stage, retrospective scraper entrainment toward the upstream at the middle sub-stage, and shear deformation zone formation in the entrainment area by friction and pushing at the later sub-stage. The damage caused by shear deformation in the entrainment area deserves special attention, as this area is difficult to observe directly. However, it can influence the stability of scour pits and surrounding structures. The results of this study may provide the basis for further research on the scour pits.</p>\",\"PeriodicalId\":50331,\"journal\":{\"name\":\"International Journal of Civil Engineering\",\"volume\":\"106 1\",\"pages\":\"\"},\"PeriodicalIF\":1.8000,\"publicationDate\":\"2024-08-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Civil Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1007/s40999-024-01005-9\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Civil Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1007/s40999-024-01005-9","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

摘要

本研究对颗粒流下游冲刷坑进行了实验和数值研究。首先,水槽实验研究了来自源区的物质质量、物质的初始位置、止挡坝高度和夹带区长度的影响。实验中使用了一个楔形物来模拟止回坝。然后使用离散元素法对典型的实验过程进行了数值研究。实验结果表明,只有在初始能量高、楔形高度低和夹带区长度小的特定条件下,才会发生表观夹带。在数值验证的基础上,利用离散元法得到的数值结果进行分析,结果表明冲刷坑的形成主要经历了三个子阶段,包括初始子阶段的下游冲击夹带、中期子阶段的刮板向上游的回溯夹带以及后期子阶段的夹带区在摩擦和推动作用下形成的剪切变形区。夹带区剪切变形造成的破坏值得特别关注,因为该区域难以直接观测。然而,它会影响冲刷坑和周围结构的稳定性。本研究的结果可为冲刷坑的进一步研究提供依据。
本文章由计算机程序翻译,如有差异,请以英文原文为准。

Experimental and Numerical Investigation on Scour Pits of Granular Flow Downstream Check Dam

Experimental and Numerical Investigation on Scour Pits of Granular Flow Downstream Check Dam

In this study, experimental and numerical investigation were conducted on scour pits of granular flow downstream. Firstly, the flow flume experiment studied the influence of the material mass from the source area, the initial location of the material, the height of the check dam, and the length of the entrainment area. In the experiment a wedge was used to simulate the check dam. Then a numerical research of typical experiment processes was carried out using the discrete element method. The experiment results show that apparent entrainment only occurs under specific conditions of high initial energy, low wedge height, and small length of entrainment area. Based on the numerical verification, the numerical results obtained by the discrete element method were used for analysis, which show that the formation of the scour pit undergoes three main sub-stages, including downstream impact entrainment at the initial sub-stage, retrospective scraper entrainment toward the upstream at the middle sub-stage, and shear deformation zone formation in the entrainment area by friction and pushing at the later sub-stage. The damage caused by shear deformation in the entrainment area deserves special attention, as this area is difficult to observe directly. However, it can influence the stability of scour pits and surrounding structures. The results of this study may provide the basis for further research on the scour pits.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.90
自引率
5.90%
发文量
83
审稿时长
15 months
期刊介绍: International Journal of Civil Engineering, The official publication of Iranian Society of Civil Engineering and Iran University of Science and Technology is devoted to original and interdisciplinary, peer-reviewed papers on research related to the broad spectrum of civil engineering with similar emphasis on all topics.The journal provides a forum for the International Civil Engineering Community to present and discuss matters of major interest e.g. new developments in civil regulations, The topics are included but are not necessarily restricted to :- Structures- Geotechnics- Transportation- Environment- Earthquakes- Water Resources- Construction Engineering and Management, and New Materials.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信