基于综合指数的同塔双回路输电线路相序选择方法

Xiaoyan Lu, Jianqiao Hu, Zhengwei Peng, Peihua Ma, Kun Zhang, Feng Gao
{"title":"基于综合指数的同塔双回路输电线路相序选择方法","authors":"Xiaoyan Lu, Jianqiao Hu, Zhengwei Peng, Peihua Ma, Kun Zhang, Feng Gao","doi":"10.1088/1742-6596/2838/1/012039","DOIUrl":null,"url":null,"abstract":"The non-transposition erection of transmission lines will lead to the imbalance of electrical parameters, which will affect the protection and automatic reclosing. The best phase sequence arrangement is determined by comprehensively considering the comprehensive indexes (current imbalance, secondary current, and recovery voltage) of double transmission un-transposed lines with shared towers. PSCAD/EMTDC electromagnetic transient simulation software is applied to build a typical 750kV transmission line model for simulation analysis, and the comprehensive indexes under different phase sequence arrangements are studied. The analysis reveals that the arrangement of phase sequence exerts a significant consequence of the comprehensive index. The findings indicate that the margin and different secondary current and recovery voltage indexes, double transmission un-transposed lines with shared towers can be erected in the same direction or in different phase sequences to reduce the current imbalance.","PeriodicalId":16821,"journal":{"name":"Journal of Physics: Conference Series","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Phase sequence selection method of double-circuit transmission lines on the same tower based on a comprehensive index\",\"authors\":\"Xiaoyan Lu, Jianqiao Hu, Zhengwei Peng, Peihua Ma, Kun Zhang, Feng Gao\",\"doi\":\"10.1088/1742-6596/2838/1/012039\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The non-transposition erection of transmission lines will lead to the imbalance of electrical parameters, which will affect the protection and automatic reclosing. The best phase sequence arrangement is determined by comprehensively considering the comprehensive indexes (current imbalance, secondary current, and recovery voltage) of double transmission un-transposed lines with shared towers. PSCAD/EMTDC electromagnetic transient simulation software is applied to build a typical 750kV transmission line model for simulation analysis, and the comprehensive indexes under different phase sequence arrangements are studied. The analysis reveals that the arrangement of phase sequence exerts a significant consequence of the comprehensive index. The findings indicate that the margin and different secondary current and recovery voltage indexes, double transmission un-transposed lines with shared towers can be erected in the same direction or in different phase sequences to reduce the current imbalance.\",\"PeriodicalId\":16821,\"journal\":{\"name\":\"Journal of Physics: Conference Series\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Physics: Conference Series\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1088/1742-6596/2838/1/012039\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Physics: Conference Series","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1088/1742-6596/2838/1/012039","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

输电线路不跨越架设会导致电气参数不平衡,影响保护和自动重合闸。综合考虑共塔双回输电线路的综合指标(电流不平衡度、二次电流、恢复电压),确定最佳相序布置。应用 PSCAD/EMTDC 电磁暂态仿真软件建立典型 750kV 输电线路模型进行仿真分析,研究不同相序布置下的综合指标。分析表明,相序排列对综合指标有显著影响。研究结果表明,裕度和不同的二次电流和恢复电压指标、共用杆塔的双回输电无跨越线路可以同向或不同相序架设,以减少电流不平衡。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Phase sequence selection method of double-circuit transmission lines on the same tower based on a comprehensive index
The non-transposition erection of transmission lines will lead to the imbalance of electrical parameters, which will affect the protection and automatic reclosing. The best phase sequence arrangement is determined by comprehensively considering the comprehensive indexes (current imbalance, secondary current, and recovery voltage) of double transmission un-transposed lines with shared towers. PSCAD/EMTDC electromagnetic transient simulation software is applied to build a typical 750kV transmission line model for simulation analysis, and the comprehensive indexes under different phase sequence arrangements are studied. The analysis reveals that the arrangement of phase sequence exerts a significant consequence of the comprehensive index. The findings indicate that the margin and different secondary current and recovery voltage indexes, double transmission un-transposed lines with shared towers can be erected in the same direction or in different phase sequences to reduce the current imbalance.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.20
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信